
ENGIE and NEOM join forces to advance desalination brine valorization solutions
Under the terms of the recently signed Memorandum of Understanding (MoU), ENGIE and NEOM will share expertise, testing results, and pilot installations aimed at developing desalination brine management practices. The partnership will harness advanced technologies, including advanced membrane solutions and crystallization systems, to explore the potential for valuable resource recovery from seawater brine by-products.
'Brine management is one of the critical challenges associated with desalination. By working with NEOM, who are ambitious in terms of scale and complexity, we are excited to explore new avenues for sustainable solutions that align with our broader mission of driving the energy transition,' said Olivier Sala, Vice President of Research & Innovation at ENGIE.
Gavin van Tonder, Managing Director of Water at NEOM, expressed enthusiasm for the collaboration: 'NEOM is committed to accelerating global progress on sustainable water management. Partnering with ENGIE, we aim to advance necessary technologies that reduce environmental footprint of desalination while contributing to NEOM's vision of a sustainable future.'
This collaboration represents a step towards building a sustainable water resource management system, with the potential to scale these solutions to other regions facing similar challenges in water desalination.
About ENGIE
ENGIE is a major player in the energy transition, whose purpose is to accelerate the transition towards a carbon-neutral economy. With 98,000 employees in 30 countries, the Group covers the entire energy value chain, from production to infrastructures and sales. ENGIE combines complementary activities: renewable electricity and green gas production, flexibility assets (notably batteries), gas and electricity transmission and distribution networks, local energy infrastructures (heating and cooling networks) and the supply of energy to individuals, local authorities and businesses. Every year, ENGIE invests more than €10 billion to drive forward the energy transition and achieve its net-zero carbon goal by 2045.Turnover in 2024: €73.8 billion. The Group is listed on the Paris and Brussels stock exchanges (ENGI) and is represented in the main financial indices (CAC 40, Euronext 100, FTSE Euro 100, MSCI Europe) and non-financial indices (DJSI World, Euronext Vigeo Eiris - Europe 120 / France 20, MSCI EMU ESG screened, MSCI EUROPE ESG Universal Select, Stoxx Europe 600 ESG-X).
ENGIE HQ press contact:
Email: engiepress@engie.com
https://twitter.com/ENGIEnewsroom
Middle East press contact:
Email: phillippa.eastgate@engie.com
About NEOM
NEOM is an accelerator of human progress and a vision of what a new future might look like. It is a region in northwest Saudi Arabia on the Red Sea being built from the ground up as a living laboratory – a place where entrepreneurship will chart the course for this new future. It will be a destination and a home for people who dream big and want to be part of building a new model for exceptional livability, creating thriving businesses and reinventing environmental conservation.
NEOM will include hyperconnected, cognitive cities, ports and enterprise zones, research centers, sports and entertainment venues and tourist destinations. As a hub for innovation, entrepreneurs, business leaders and companies will come to research, incubate, and commercialize new technologies and enterprises in groundbreaking ways. Residents of NEOM will embody an international ethos and embrace a culture of exploration, risk-taking and diversity.
For further information email media@NEOM.com or visit www.NEOM.com and www.NEOM.com/en-us/newsroom.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Zawya
8 hours ago
- Zawya
Saudi gigaprojects take $8bln hit in reality check for diversification efforts
Saudi Arabia's nearly $1 trillion sovereign wealth fund, the Public Investment Fund (PIF), has taken an $8 billion write-down on some of its most high-profile gigaprojects — vast developments meant to reshape the kingdom's economy and image. PIF valued gigaprojects on its books at 211 billion riyal ($56.24 billion) as of end-2024, over 12% lower than the 241 billion riyal in 2023, the company said in its 2024 annual report released Wednesday. The accounting move reflects cost overruns, delays and shifting market conditions for projects such as NEOM, the desert mega-city nearly the size of Belgium intended to house nearly nine million people on the Red Sea. NEOM has repeatedly faced implementation challenges and delays, with sources telling Reuters the project has been scaled back as the kingdom prioritises infrastructure essential to hosting global sporting events, like the 2034 World Cup. "A more targeted investment programme and with longer timelines is actually positive given the weaker oil revenue backdrop, and the large hosting event that Saudi has won. These were won after Vision 2030 was designed and will need significant investment," Monica Malik, Chief Economist, Abu Dhabi Commercial Bank. "The recalibration is also important to contain the misallocation of resources and cost pressures of the projects," she said. The revision is a stark acknowledgment that the kingdom's transformation blueprint is running up against financial and practical realities, coming at a sensitive time for Crown Prince Mohammed bin Salman's Vision 2030 agenda, which hinges on diversifying Saudi Arabia's oil-dependent economy. (Reporting by Hadeel Al Sayegh Editing by Tomasz Janowski)


Zawya
05-08-2025
- Zawya
ACWA Power says 25 projects worth $26bln in advanced development stage
ACWA Power has 25 projects in the advanced development stage, which are valued at $25.76 billion as of 30 June 2025, according to its second quarter 2025 financial statement. The total contracted power and water capacity stands at 22,008 megawatts (MW) and 1,824 cubic metres per day (m3/day). Total assets under construction and partially operational reached $26.18 billion, with a total contracted power and water capacity of 22,455 MW and 1,451 m3/day. Operational capacity reached 2,860 MW, while under-construction capacity stands at 19,595 MW and 14,51 m3/day. Total operations assets stand at 57, valued at $55.52 billion, with operational power and water capacity at 34,429 MW and 6,194 m3/day as of 30 June 2025. ACWA Power financially closed two projects with an aggregate total investment cost of around 2.4 billion Saudi riyals by the end of June 2025. The company's gross power capacity reached 78.9 GW, 9.5 million m3/day, 1.2 million tonnes per annum of green ammonia, and 5.3 GWh of battery energy storage system (BESS). Assets under management totalled SAR403 billion by the end of June 2025. Green Hydrogen NEOM Green Hydrogen is expected to come online in the fourth quarter of 2026 with a capacity of 220 Ktonnes per annum, the statement said. The company has also commenced design work on a new green hydrogen project in the Kingdom. In August, ACWA Power awarded a convertible front-end engineering design (FEED) contract for the Yanbu Green Hydrogen Project to a consortium of Spain's Tecnicas Reunidas and China's Sinopec Guangzhou Engineering. The multibillion facility, which is scheduled to start commercial operations by 2030, will utilise 5 gigawatts (GW) each of wind and solar power, coupled with a 400 km transmission line and up to 4.4 GW of electrolysers to annually produce 400,000 tonnes of green hydrogen, which will be converted to 2.5 million tonnes of green ammonia to facilitate its export to international markets. In February, ACWA Power and Germany's SEFE signed an agreement to explore building a hydrogen bridge between Saudi Arabia and Germany, starting with the supply of 200,000 tonnes of green hydrogen annually by 2030. In May, the company signed a memorandum of understanding (MOU) with Malaysian Investment Development Authority (MIDA) to develop energy projects, including green hydrogen, targeting 12.5 GW of capacity by 2040 through an estimated investment of $10 billion. (Editing by Anoop Menon) (


Zawya
05-08-2025
- Zawya
Europe's old power plants to get digital makeover driven by AI boom
PARIS - Some of Europe's ageing coal and gas fired power plants can look forward to a more high-tech future as big tech players, such as Microsoft and Amazon, seek to repurpose them as data centres, with ready-made access to power and water. Companies such as France's Engie, Germany's RWE, and Italy's Enel are looking to benefit from a surge in AI-driven energy demand by converting old power sites into data centres and securing lucrative long-term power supply deals with their operators. The data centre option offers the utilities a way to offset the hefty costs of shutting down ageing power plants as well as potentially underwriting future renewable developments. Tech companies see these sites as a quick way to secure power grid connections and water cooling facilities, two big bottlenecks in the AI industry. "You have all the pieces that come together like ... water infrastructure and heat recovery," said Bobby Hollis, vice president for energy at Microsoft. Lindsay McQuade, EMEA energy director at Amazon , said she expected permitting for data centres to move faster at old sites, where a big chunk of infrastructure was already in place. Utilities can either lease the land or build and operate the centres themselves, securing long-term power contracts with tech firms, he said. The deals offer much more than just the sale of unused land as they include opportunities for stable, high-margin revenue, said Simon Stanton, head of Global Partnerships and Transactions at RWE. "It's more about the long-term relationship, the business relationship that you get over time that enables you to de-risk and underwrite your infrastructure investments," Stanton said. Most of EU's and Britain's 153 hard coal and lignite plants are set to close by 2038 to meet climate targets, joining the 190 plants that have closed since 2005, based on data from NGO Beyond Fossil Fuels, which campaigns to accelerate closure of coal-fired power stations. NEW REVENUE STREAMS The economics of data centre deals can be compelling for the utilities, which can negotiate a long-term power supply contract to underwrite future renewable developments. Tech firms are paying premiums of up to 20 euros per megawatt-hour for low-carbon power, said Gregory LeBourg, environmental program director at French data centre operator OVH. Data centre power demands can be anywhere from a couple hundred megawatts to a gigawatt or more. So the annual 'green premium' - the extra price paid for low-carbon electricity - on top of a base market price could potentially translate into a long-term contract worth hundreds of millions or even billions of euros, based on Reuters' calculations. One long-term option is to build an "energy park" and connect the data centre to a new renewable development, relying on the grid for emergencies, but this is a relatively new concept, industry sources said. Engie wants to double its installed renewable energy by 2030 from the current 46 GW. The group has identified 40 sites globally that it is marketing to data centre developers, including coal and gas plants that could be converted, said Sebastien Arbola, who runs the company's data centre business. One is the Hazelwood coal plant in Australia, which closed in 2017. He declined to disclose details of other sites, saying they are mostly in Europe. Other utilities, including Portugal's EDP, EDF, and Enel said they are also marketing old gas and coal sites for new data centre development. "It's business model diversification," said Michael Kruse, managing partner at consultancy Arthur D. Little. Utilities are creating a new type of business and also new revenue streams, he said. 'SPEED TO POWER' The appeal for tech companies is speed. Grid connection delays in Europe can stretch over a decade, while repurposed plants potentially offer speedier access to power and water. "You actually have the opportunity to move faster," said Hollis at Microsoft. Data centre capacity in Europe is much lower than the United States and Asia due to longer grid connection times and slower permitting, data from Synergy Research Group showed. The data centre operators can choose to buy the renewable power they need directly from the utilities in the form of long-term contracts or purchase from the power market. Real estate firm JLL is working on several conversions, including a 2.5 GW data centre at a former German coal plant and four sites in Britain for a major tech client, said Tom Glover, who works on data centre transactions at JLL. Developers do not often disclose more detail about data centre projects, including their clients, for security reasons. Britain's Drax is also seeking a partner to develop unused parts of an old coal site in Yorkshire, now partially converted to biomass. It offers access to unused water cooling equipment, said Richard Gwilliam, Drax's carbon programme director. Drax is offering a "behind-the-meter" deal where the power plant will provide direct power to the data centre and it can pull from the grid if necessary. EDF has also chosen developers for two sites at gas power plants in central and eastern France. Tech companies are willing to pay more for projects that can start up sooner as they vie for market share in a rapidly growing industry, said Sam Huntington, director of research at S&P Global Commodity Insights. "Speed to power is just the phrase we keep hearing over and over again," he said. (Reporting by Forrest Crellin in Paris; additional reporting by Leo Marchandon in Gdansk, Francesca Landini in Milan; editing by Nina Chestney, Dominique Patton and Jane Merriman)