
APSRTC urged to replace outdated ticketing machines before free bus travel scheme rollout
They said the existing ticket issuing machines (TIMS), which are over three years old, are creating manifold problems for conductors while issuing tickets, with issues like inadequate battery backup, hardware/motherboard problems, and touch screen issues. The bus conductors, in many instances, are forced to issue manual tickets to passengers as the substandard paper roll and ink quantity supplied to TIMS machines do not give properly printed tickets.
APSRTC has around 14,000 TIMS devices procured from E-Bix, a Chinese firm, for which the govt pays a monthly rent of Rs 680 for each device. "The govt plans to roll out the free bus travel scheme for women across the state from Aug 15. Following the launch of the scheme, APSRTC buses will see more number of passengers, particularly women. It would be increasingly difficult for RTC drivers and conductors to issue tickets using the existing TIMS devices, as these machines, which run on 4G network, have less data speed, posing significant difficulty in issuing a large number of free tickets in a short time," APSRTC employees' union president P Damodar Rao said.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Explore new and used vehicles across the board.
Carxplore
Shop Now
Undo
RTC employees have submitted a representation to the authorities requesting the corporation replace the existing TIMS devices with newer ones to facilitate a seamless ticketing experience for passengers by the launch of the free bus scheme. "The corporation should tie up with banks and software firms and ask them to donate free TIMS devices and paper rolls with their bank rolls to reduce the burden on the corporation and provide better services to passengers.
In Tamil Nadu, govt buses are using TIMS devices provided by a public sector bank free of cost, with quality paper rolls also supplied by the bank, thus reducing the burden on the govt. APSRTC, too, should explore the TN model and replicate it in AP," the employees urged the corporation. They also demanded the installation of charging points on the older RTC buses to charge the TIMS devices.
Get the latest lifestyle updates on Times of India, along with
Friendship Day wishes
,
messages
and
quotes
!

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Hindustan Times
11 minutes ago
- Hindustan Times
Brazil's President Lula plans joint statement with PM Narendra Modi, other BRICS leaders on Donald Trump's tariffs
Brazilian President Luiz Inacio Lula da Silva on Wednesday indicated his plans to call PM Narendra Modi and other leaders of the BRICS bloc in response to the tariffs imposed by US President Donald Trump. Brazil's President Luiz Inacio Lula da Silva speaks during an interview with Reuters at the Alvorada Palace, in Brasilia, Brazil, He said he was planning to ring PM Narendra Modi, Chinese President Xi Jinping and other leaders of BRICS.(REUTERS) The US tariffs on Brazilian goods jumped to 50% on Wednesday, but Lula said that his country won't announce any reciprocal measures. Instead, the Brazilian President told Reuters in an interview that he was planning to ring PM Narendra Modi, Chinese President Xi Jinping and other leaders of BRICS to discuss the possibility of a joint statement on Trump's tariffs. Trump had announced that the US would impose an additional 10 per cent tariff on 'any country aligning themselves with the Anti-American policies of BRICS' with 'no exceptions'. The BRICS countries, including India, had released a joint declaration voicing 'serious concerns' about the 'rise of unilateral tariff and non-tariff measures' in an apparent jibe at the Trump administration's trade policy. Lula might be looking for a more stinging statement from BRICS this time around. Brazil President doubles down on not calling Donald Trump Brazil's President Luiz Inacio Lula da Silva is in no rush to ring the White House, doubling down on his earlier statement that he wouldn't call Donald Trump to hold talks over the tariff issue. "The day my intuition says Trump is ready to talk, I won't hesitate to call him. But today my intuition says he doesn't want to talk. And I'm not going to humiliate myself," Lula told Reuters. Lula described the US-Brazil relations at a 200-year nadir after Trump tied the new tariff to his demand for an end to the prosecution of right-wing former President Jair Bolsonaro, who is standing trial for plotting to overturn the 2022 election. The President said Brazil's Supreme Court, which is hearing the case against Bolsonaro, "does not care what Trump says and it should not," adding that Bolsonaro should face another trial for provoking Trump's intervention, calling the right-wing former president a "traitor to the homeland." "We had already pardoned the US intervention in the 1964 coup. But this now is not a small intervention. It's the president of the United States thinking he can dictate rules for a sovereign country like Brazil. It's unacceptable," Lula said. Despite Brazil's exports facing one of the highest tariffs imposed by Trump, the new US trade barriers look unlikely to derail Latin America's largest economy, giving its President more room to stand his ground against Trump than most Western leaders.


Time of India
29 minutes ago
- Time of India
ED questions close aides of Anil Ambani
Live Events (You can now subscribe to our (You can now subscribe to our Economic Times WhatsApp channel NEW DELHI: The Enforcement Directorate (ED) on Wednesday quizzed Amitabh Jhunjhunwala , a former close aide of Anil Ambani , and Sateesh Seth , a confidante of the industrialist, in connection with its probe into alleged money laundering in a Rs 17,000 crore bank loan fraud case The duo was questioned for several hours on Wednesday, people in the know told ET. The agency primarily focused on "data extraction" pertaining to the alleged loan fraud. The two have been summoned by the agency for further questioning this week, the people Tuesday, the agency questioned Anil Ambani for over nine hours. He has sought seven days to furnish documents pertaining to ED's queries. The agency will summon the 66-year-old industrialist again after recording the statements of the credit committee members of banks that had given loans to his Reliance Group companies, ET reported on was the first to report about the ED summoning Anil Ambani as well as Jhunjhunwala and Seth for agency will seek details from the bank officials on the action initiated by them, if any, against Anil Ambani's companies that failed to repay the loans, ET had reported. About Rs 17,000 crore of loans that nearly 20 private and public sector banks, including Yes Bank ICICI Bank and HDFC Bank had given to Reliance Home Finance Ltd , Reliance Commercial Finance and RCOM had turned non-performing. The ED is investigating alleged laundering of the loan proceeds.


India Today
29 minutes ago
- India Today
Centre spent Rs 1,500 crore on ministry rent, not anymore: PM at Kartavya Bhavan
Prime Minister Narendra Modi on Wednesday inaugurated the Kartavya Bhavan at Kartavya Path in Delhi. PM inaugurated Kartavya Bhavan, calling it the seed of Viksit Bharat Old ministry buildings from 1950s-70s are being replaced due to structural inefficiency Facility includes modern amenities and large conference spaces for government use Prime Minister Narendra Modi on Wednesday inaugurated Kartavya Bhavan at Kartavya Path in New Delhi, pointing out that many central ministries were functioning from different locations across the national capital, with several housed in rented buildings. He revealed that the government was spending Rs 1,500 crore solely on rent. "Many ministries of the Indian government are being run from 50 different locations in Delhi. Most of these ministries are being run from rented buildings, with an annual expenditure of Rs 1.5 thousand crores. This amount is being spent by the central government just to pay rent," he said. PM Modi pointed out that the country's administrative machinery had been operating for decades after Independence from buildings constructed during the British era. He further highlighted the poor working conditions in the existing buildings, stating that they lacked proper lighting, space, and ventilation. "Can you imagine an important ministry like Home Affairs operating out of a building for nearly 100 years with insufficient resources?" the PM asked. He further said that the newly-inaugurated Kartavya Bhavan is not a mere structure or a piece of infrastructure, but that the seed of Viksit Bharat will be sown from this building. "In the coming decades, the direction of the country will be determined from this building," said PM Modi. Quoting from the Bhagavad Gita, PM Modi said that we must focus more on our kartavya (duty) than on the end result while carrying out our tasks. The ambitious project is aimed at bringing ministries and departments under one roof for efficiency. Kartavya Bhavan-03, the first to be inaugurated, will house the Home Affairs, External Affairs, Rural Development, MSME, DoPT, Petroleum & Natural Gas ministries, and the Principal Scientific Adviser's office. Many key ministries currently function from ageing buildings like Shastri Bhawan, Krishi Bhawan, Udyog Bhawan, and Nirman Bhawan, constructed between the 1950s and 1970s, which are now "structurally outdated and inefficient," according to the government. The prime minister, accompanied by Union Housing and Urban Affairs Minister Manohar Lal Khattar and Ministry Secretary HUA Secretary Katikithala Srinivas, took a tour of the newly constructed building. Srinivas briefed PM Modi about the features of Kartavya Bhavan. The HUA Ministry has plans to construct ten buildings as part of the Common Central Secretariat (CCS) under the government's Central Vista redevelopment project. Two CCS buildings, 1 and 2, are scheduled to be completed by next month, while construction work on CCS 10 will be finished by April next year. The project of CCS buildings 6 and 7 will be completed by October 2026. On Tuesday, Khattar said that offices functioning from the four bhawans will shift to four new locations on Kasturba Gandhi Marg, Minto Road, and Netaji Palace temporarily for two years, while the construction is carried out. A few buildings are currently proposed to be retained. These include the National Museum, National Archives, Jawaharlal Nehru Bhawan (External Affairs Ministry), and Dr Ambedkar Auditorium, which are new buildings. Vanijya Bhawan will also be retained. Under the Central Vista redevelopment plan, the government has already constructed a new Parliament building and the Vice President Enclave, and redeveloped the Kartavya Path that spans from Vijay Chowk to India Gate. Besides the Common Central Secretariat, the government will also construct an Executive Enclave that will house a new Prime Minister's Office (PMO), Cabinet Secretariat, India House, and National Security Council Secretariat. Under the second phase of the Executive Enclave, a new prime minister's residence will be constructed. The plinth area of the Kartavya Bhavan-03 is 1.5 lakh square metres with a basement area of 40,000 square metres. Its parking lot can accommodate 600 cars. The HUA ministry said the Kartavya Bhavan-03 has a creche, a yoga room, a medical room, a cafe, a kitchen, and a multipurpose hall. It has 24 main conference rooms, each with a capacity to seat 45 people, 26 small conference rooms, each with a capacity to seat 25 people, 67 meeting rooms, and 27 lifts. Prime Minister Narendra Modi on Wednesday inaugurated Kartavya Bhavan at Kartavya Path in New Delhi, pointing out that many central ministries were functioning from different locations across the national capital, with several housed in rented buildings. He revealed that the government was spending Rs 1,500 crore solely on rent. "Many ministries of the Indian government are being run from 50 different locations in Delhi. Most of these ministries are being run from rented buildings, with an annual expenditure of Rs 1.5 thousand crores. This amount is being spent by the central government just to pay rent," he said. PM Modi pointed out that the country's administrative machinery had been operating for decades after Independence from buildings constructed during the British era. He further highlighted the poor working conditions in the existing buildings, stating that they lacked proper lighting, space, and ventilation. "Can you imagine an important ministry like Home Affairs operating out of a building for nearly 100 years with insufficient resources?" the PM asked. He further said that the newly-inaugurated Kartavya Bhavan is not a mere structure or a piece of infrastructure, but that the seed of Viksit Bharat will be sown from this building. "In the coming decades, the direction of the country will be determined from this building," said PM Modi. Quoting from the Bhagavad Gita, PM Modi said that we must focus more on our kartavya (duty) than on the end result while carrying out our tasks. The ambitious project is aimed at bringing ministries and departments under one roof for efficiency. Kartavya Bhavan-03, the first to be inaugurated, will house the Home Affairs, External Affairs, Rural Development, MSME, DoPT, Petroleum & Natural Gas ministries, and the Principal Scientific Adviser's office. Many key ministries currently function from ageing buildings like Shastri Bhawan, Krishi Bhawan, Udyog Bhawan, and Nirman Bhawan, constructed between the 1950s and 1970s, which are now "structurally outdated and inefficient," according to the government. The prime minister, accompanied by Union Housing and Urban Affairs Minister Manohar Lal Khattar and Ministry Secretary HUA Secretary Katikithala Srinivas, took a tour of the newly constructed building. Srinivas briefed PM Modi about the features of Kartavya Bhavan. The HUA Ministry has plans to construct ten buildings as part of the Common Central Secretariat (CCS) under the government's Central Vista redevelopment project. Two CCS buildings, 1 and 2, are scheduled to be completed by next month, while construction work on CCS 10 will be finished by April next year. The project of CCS buildings 6 and 7 will be completed by October 2026. On Tuesday, Khattar said that offices functioning from the four bhawans will shift to four new locations on Kasturba Gandhi Marg, Minto Road, and Netaji Palace temporarily for two years, while the construction is carried out. A few buildings are currently proposed to be retained. These include the National Museum, National Archives, Jawaharlal Nehru Bhawan (External Affairs Ministry), and Dr Ambedkar Auditorium, which are new buildings. Vanijya Bhawan will also be retained. Under the Central Vista redevelopment plan, the government has already constructed a new Parliament building and the Vice President Enclave, and redeveloped the Kartavya Path that spans from Vijay Chowk to India Gate. Besides the Common Central Secretariat, the government will also construct an Executive Enclave that will house a new Prime Minister's Office (PMO), Cabinet Secretariat, India House, and National Security Council Secretariat. Under the second phase of the Executive Enclave, a new prime minister's residence will be constructed. The plinth area of the Kartavya Bhavan-03 is 1.5 lakh square metres with a basement area of 40,000 square metres. Its parking lot can accommodate 600 cars. The HUA ministry said the Kartavya Bhavan-03 has a creche, a yoga room, a medical room, a cafe, a kitchen, and a multipurpose hall. It has 24 main conference rooms, each with a capacity to seat 45 people, 26 small conference rooms, each with a capacity to seat 25 people, 67 meeting rooms, and 27 lifts. Join our WhatsApp Channel