
Velesto's 1Q net profit jumps to RM52.61mil on higher charter rates
KUALA LUMPUR: Off the back of an improved bottomline in the first quarter of 2025 (1QFY25), Velesto Energy Bhd says increasing offshore activities in Southeast Asia signal strong market momentum, as reflected in recent contract wins in Vietnam and Indonesia.
"We are strategically focused on maximising rig utilisation, maintaining cost efficiency to sustain healthy margins, and driving shareholder returns.
"Our priority remains clear—delivering long- term, sustainable value to all stakeholders," said Velesto president Megat Zariman Abdul Rahim in a statement.
In 1QFY25, Velesto recorded a higher net profit of RM52.61mil compared to RM46.81mil in the year-ago quarter. Earnings per share rose to 0.64 sen from 0.57 sen previously.
According to the group, the improved profitability was owing to an increase in average daily charter rate to US$127,000 a day, which helped offset the lower rig utilisation rate.
The rig utilisation rate had slipped to 67% from 94% in 1QFY24, primarily due to idle periods for NAGA 3 and NAGA 5.
The group's revenue during the quarter under review, however, fell to RM224.65mil from RM338.58mil.
Moving forward, Velesto said the Special Periodical Surveys (SPS) for NAGA 8 and NAGA 3 are on track for completion in the second quarter of 2025.
Following the completion of SPS, NAGA 8 is scheduled to commence operations in Indonesia in the third quarter of 2025.
As at April 2025, Velesto's order book has doubled to RM1.4bil, providing earnings visibility until 2028.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


BusinessToday
30-05-2025
- BusinessToday
Bursa Opens Flat As FBMKLCI Inches Down 0.02% To 1,518.75
Bursa Malaysia opened on a subdued note this morning, with the FBM KLCI slipping 0.23 points or 0.02% to 1,518.75 as at 9.05 am. Broader indices also trended lower, with the FBM 70 shedding 88.90 points (-0.54%) to 16,243.41, and the FBM EMAS falling 18.10 points (-0.16%) to 11,364.23. The FBM Shariah Index declined 29.02 points (-0.26%) to 11,336.81, while the FTSE4Good Bursa Malaysia Index (F4GBM) dipped 1.23 points to 915.89. Among the most active stocks, Velesto remained unchanged at RM0.185 with over 144 million shares traded, while Natgate rose 6 sen to RM1.500 with 74.8 million shares changing hands. SMTrack, Tawin, and DNex saw active interest but remained flat or edged slightly lower. The cautious start comes amid mixed regional sentiment, as investors await fresh cues on global inflation and interest rate direction. Related


The Sun
28-05-2025
- The Sun
Sarawak approves 82 resettlement projects
KUCHING: A total of 82 projects under the Resettlement Scheme (SPS) and Village Expansion Scheme (SPK) have been approved as of April 30 under the 12th Malaysia Plan (12MP) and the People's Project, said Sarawak Deputy Premier Datuk Amar Awang Tengah Ali Hasan. He said the overall project provides a total of 7,932 housing lots with an estimated cost of RM1.5 billion. 'Of the total, 25 projects are completed while the implementation of the remaining 57 projects will continue until the end of the 12MP and in the 13MP,' he said when winding up on behalf of the Ministry of Natural Resources and Urban Development at the State Assembly here today. Awang Tengah, who is also the Second Minister of Natural Resources and Urban Development, said that since 2018, infrastructure development for the scheme has been implemented with new specifications involving the construction of, among others, paved roads, concrete drains and water and electricity supply reticulation systems, involving an average cost of RM150,000 per lot. 'However, taking the people's welfare into consideration, the government has set the land premium payment at no more than RM2,500, which can be paid in annual instalments for up to 10 years,' he said.

Barnama
28-05-2025
- Barnama
Sarawak Govt Approves 82 SPS, SPK Projects Under 12MP
KUCHING, May 28 28 Mei (Bernama) -- A total of 82 projects under the Resettlement Scheme (SPS) and Village Expansion Scheme (SPK) have been approved as of April 30 under the 12th Malaysia Plan (12MP) and the People's Project, said Sarawak Deputy Premier Datuk Amar Awang Tengah Ali Hasan. He said the overall project provides a total of 7,932 housing lots with an estimated cost of RM1.5 billion. "Of the total, 25 projects are completed while the implementation of the remaining 57 projects will continue until the end of the 12MP and in the 13MP,' he said when winding up on behalf of the Ministry of Natural Resources and Urban Development at the State Assembly here today.