logo
Forge Resources Announces the Commencement of Drilling at Alotta, Yukon

Forge Resources Announces the Commencement of Drilling at Alotta, Yukon

Yahooa day ago

Vancouver, British Columbia--(Newsfile Corp. - June 5, 2025) - Forge Resources Corp. (CSE: FRG) (OTCQB: FRGGF) (FSE: 5YZ) ("FRG" or the "Company") is pleased to announce the commencement of drilling at Alotta project, Yukon and the oversubscribed closing of its previously announced flow through financing, and options.
The drill crews commenced drilling on the evening of June 2. The first hole (ALT-25-007, Azimuth 310, Dip: -50) has an anticipated depth of 300 metres (Figure 1). Early observations are promising, revealing strong mineralization within the top 25 metres of the hole, with significant veining and favorable alteration. Patchy biotite alteration, moderate local silicification, disseminated pyrite, and deeper occurrences of sericite have been observed. The majority of veining hosts pyrite, minor chalcopyrite and chalcopyrite-molybdenite veins.
Drilling has now intersected a 50-metre-wide zone of intense silicification, sericite, pyrite, and localized chlorite alteration. This area represents a textbook phyllic alteration zone, characterized by abundant disseminated pyrite, narrow quartz breccias, and pyrite stringers.
Lorne Warner P.Geo, President of Forge Resources states: "We are thrilled to announce that our first drill hole at the Alotta project has revealed significant veining and highly favorable alteration within the top 25 metres. This includes a well-developed phyllic alteration zone, which aligns perfectly with our geological model. These exciting results mark a promising start, and we eagerly anticipate further discoveries as drilling continues."
Pad building is underway to facilitate step-out drilling in the Payoff Zone for planned holes, ALT-25-008/009). The Payoff Zone is host to hole ALT-23-001 that intercepted 211.65 metres of 0.46 grams/tonne gold from the 2023 maiden drill program.
We remain committed to keeping our stakeholders informed and will provide further updates as new information becomes available.
Figure 1 - Drilling operations at ALT-25-007
To view an enhanced version of this graphic, please visit:https://images.newsfilecorp.com/files/8680/254679_405d1b22547b1941_001full.jpg
Drill Plan Recap for Spring/Summer 2025
As announced on April 16, 2025, the Forge technical team, in collaboration with Archer Cathro and Associates, has designed a summer exploration program comprising of up to 4000 metres of diamond drilling across 12 proposed diamond drill holes, each with an average depth of 300-350 metres. These efforts will be directed towards step-out drilling within the Payoff Zone and untested coincident geophysical and geochemical anomalies across a 4 km by 1 km area. The Company's drill plan for the 2025 season intends to evaluate the most promising drill locations based on their respective merits to test for porphyry-style mineralization.
Additionally, the company plans to undertake further reconnaissance drilling on the Payoff target areas this season. This zone exhibits substantial surface mineralization, with highly anomalous concentrations of gold, copper, and molybdenum identified from rock and soil samples. These targets represent areas of the property where significant (>1 g/t gold) rock values have been observed on the surface.
Financing Closing
Forge Resources has closed its previously announced non-brokered flow through financing, oversubscribed non-brokered flow-through private placement (the "Private Placement") and will issue 1,940,152 units (the "Units") at a price of $0.66 per Unit for aggregate gross proceeds of $1,280,500.32 (the "Offering"). This amount surpassed the company's previously announced target of $1,000,000.
Each Unit consists of one flow-through common share in the capital of the Company and one-half of one transferrable non-flow-through common Share purchase warrant (each whole warrant, a "Warrant"). Each Warrant entitles the holder to purchase one common share of the Company (a "Warrant Share") for a period of 2 years following the issuance thereof at an exercise price of $1.00 per Warrant Share (the "Warrant Expiry Date"). The Warrants are subject to an acceleration clause, in the event that the trading price of the Shares on the Canadian Securities Exchange (the "CSE") reaches $1.50 or more for a period of fifteen consecutive trading days, the Company may, at its option, accelerate the Warrant Expiry Date by delivering notice to the holders of such Warrants thereof by issuing a press release (the "Warrant Acceleration Press Release"), and, in such case the Warrant Expiry Date shall be deemed to be 5:00 p.m. (Vancouver Time) on the 30th day following the date of the issuance of the Warrant Acceleration Press Release.Upon closing of the Offering, the Company paid finders fees to one finder consisting of a cash commission of $60,000 and 90,909 warrants exercisable for a period of 2 years from the closing of the Private Placement at a price per share of $0.66.
The gross proceeds from the Units will still be utilized for incurring Canadian exploration expenses and flow-through mining expenditures. All securities issued are subject to a statutory holder period of four months and one day from the date of issuance.
Issuance of Options
The Company also announces the issuance of 400,000 options to certain consultants of the Company (the "Options"). Each option allows the holder to purchase one common share of the Company (each a "Share") upon the terms and conditions of the option agreement. The Options are exercisable over a 2-year term expiring on June 5, 2027 at a price per Share of $0.56
Qualified Person
Lorne Warner, P.Geo, and President of Forge Resources Corp. is a qualified person as defined by National Instrument 43-101 and has reviewed and approved the scientific and technical disclosure in this news release.
About Forge Resources Corp.
Forge Resources Corp. is a Canadian-listed junior exploration company focused on exploring and advancing the Alotta project, a prospective porphyry copper-gold-molybdenum project located 50 km south-east of the Casino porphyry deposit in the unglaciated portion of the Dawson Range porphyry/epithermal belt in the Yukon Territory of Canada.
In addition, the Company holds an 80% interest in Aion Mining Corp., a company that is developing the fully permitted La Estrella coal project in Santander, Colombia. The project contains eight known seams of metallurgical and thermal coal.
On behalf of the Board of Directors"PJ Murphy", CEO Forge Resources Corp.info@forgeresources.com
Forward Looking StatementsCertain of the statements made and information contained herein may contain forward-looking information within the meaning of applicable Canadian securities laws. Forward-looking information includes, but is not limited to, information concerning the Company's intentions with respect to the development of its mineral properties. Forward-looking information is based on the views, opinions, intentions and estimates of management at the date the information is made, and is based on a number of assumptions and subject to a variety of risks and uncertainties and other factors that could cause actual events or results to differ materially from those anticipated or projected in the forward-looking information (including the actions of other parties who have agreed to do certain things and the approval of certain regulatory bodies). Many of these assumptions are based on factors and events that are not within the control of the Company and there is no assurance they will prove to be correct. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such information. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates or opinions should change except as required by applicable securities laws, or to comment on analyses, expectations or statements made by third parties in respect of the Company, its financial or operating results or its securities. The reader is cautioned not to place undue reliance on forward-looking information. We seek safe harbor.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/254679

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Asante Provides Financial and Operating Results for the Quarter Ended April 30, 2025
Asante Provides Financial and Operating Results for the Quarter Ended April 30, 2025

Yahoo

time2 hours ago

  • Yahoo

Asante Provides Financial and Operating Results for the Quarter Ended April 30, 2025

VANCOUVER, British Columbia, June 06, 2025 (GLOBE NEWSWIRE) -- Asante Gold Corporation (CSE:ASE | GSE:ASG | FRANKFURT:1A9 | ('Asante' or the 'Company') announces the filing of its financial statements and management's discussion and analysis ('MD&A') for the three months ended April 30, 2025 ('Q1 2026'). All dollar figures are in United States dollars unless otherwise indicated. A summary of the financial and operating results for fiscal Q1 2026 are presented in this news release. For a detailed discussion of results for the first quarter, please refer to the Management's Discussion and Analysis filed on SEDAR+ at and Asante's website at Dave Anthony, President and CEO stated, 'We are pleased to report a significant ramp up in stripping operations during the first quarter, including the highest quarterly material movement at Bibiani in more than two years. Commissioning of the sulphide treatment plant will advance through July with full operations in August. Production and cost metrics were in line with annual guidance as noted in our recent five year outlook, which envisages growth to over 500,000 ounces per year by 2028 and free cash flow generation of over $2 billion through 2029. We look forward to updating investors on our financing process, which we expect to conclude by the end of July 2025.' Quarter ended April 30, 2025 Summary Financial Results Three months ended April 30 ($000s USD) except as noted 2025 2024 Financial Results Revenue 141,982 114,311 Total comprehensive loss1 (20,038) (16,036) Adjusted EBITDA2 30,664 13,026 Operations Results Gold equivalent produced (oz) 51,912 53,379 Gold sold (oz) 48,190 53,600 Consolidated average gold price realized per ounce2 ($/oz) 2,946 2,133 AISC2 2,971 1,879 Notes:(1) Total comprehensive loss attributable to shareholders of the Company(2) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company's financial statements, refer to 'Non-IFRS Measures'. Asante's revenue for the three months ended April 30, 2025 was $142 million, a 24% increase from $114 million in the same period in 2024. The increase in revenue was primarily driven by higher gold prices and partially offset by a lower volume of gold sold. In the three months ended April 30, 2025, the Company realized an average gold price of $2,946 per ounce on the sale of 48,190 gold equivalent ounces, compared to $2,133 per ounce on the sale of 53,600 ounces in the same period in 2024. Adjusted EBITDA for the three months ended April 30, 2025 was $30,664, compared to $13,026 in the same period in 2024. The increase in Adjusted EBITDA reflects gold prices at all-time high only partially offset by a lower volume of gold sold. The Company produced 51,912 gold equivalent ounces for the three months ended April 30, 2025, compared to 53,379 gold equivalent ounces in the same period in 2024. The decrease in gold production in the three-month period ended April 30, 2025 compared to the prior year comparable period was due to lower feed grades at Bibiani. Consolidated AISC increased by 58% for the three months ended April 30, 2025 compared to the same period in 2024 primarily due to additional costs at Bibiani resulting from increased stripping in the Main Pit and lower grade ore. Additionally, higher sustaining capital expenditures at Chirano as well as lower consolidated volume of gold equivalent sold contributed to this increase. Bibiani Mine – Summary of the quarter ended April 30, 2025 Results Three months ended April 30 ($000s USD) except as noted 2025 2024 Waste mined (kt) 11,412 2,472 Ore mined (kt) 558 587 Total material mined (kt) 11,970 3,058 Strip ratio (waste:ore) 20.5 4.2 Ore processed (kt) 581 596 Grade (grams/tonne) 1.33 1.65 Gold recovery (%) 68% 65% Gold equivalent produced (oz) 17,241 19,183 Gold equivalent sold (oz) 16,708 19,363 Revenue ($ in thousands) 46,674 41,309 Average gold price realized per ounce1 2,794 2,133 AISC1 3,693 1,752 Note:(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company's financial statements, refer to 'Non-IFRS Measures'. Total material mined increased by 291.4% in the three months ended April 30, 2025 compared to the three months ended April 30, 2024. In the three months ended April 30, 2025, ore mined totaled 558,133 tonnes, a 4.8% decrease from 586,536 tonnes in the same period in 2024. The increase in total material mined in the three months ended April 30, 2025 and the decrease in ore mined in the three months ended April 30, 2025 reflects the Company's strategy to reduce the waste strip backlog associated with the expansion of the Main Pit, as well as the continued mining activities at the Russel satellite pit. Gold equivalent ounces produced in the three months ended April 30, 2025 was 17,241 compared to 19,183 in the three months ended April 30, 2024. The decrease in the three months ended April 30, 2025 was due to lower grade plant feed, impacted by draws from low-grade stockpiles whilst operations are focused on reducing the backlog of waste stripping. In addition, results were impacted by a high proportion of sulphide ore processed without the benefit of a sulphide treatment plant, which continues to limit gold recovery. AISC increased to $3,693 per ounce in the three months ended April 30, 2025, compared to $1,752 per ounce in the same period of 2024. The increase was primarily due to elevated stripping requirements, lower grade ore processed, and other higher sustaining capital expenditures. Bibiani Mine – Outlook For the year ending January 31, 2026, the Company plans to execute on its growth strategy which includes: The construction, commissioning, and optimization of the sulphide treatment plant with commissioning expected to begin by the end of Q2 2026, and full operations expected to begin in Q3 2026, significantly enhancing gold recovery. Plant throughput expansions including completion of an upgraded crushing system, which has already started and progressing to plan to achieve a throughput increase from 3.0 Mt/y to 4.0 Mt/y and create a robust crushing circuit. Plant upgrades to the carbon-in-leach ('CIL') plant. Road construction connecting Bibiani to Chirano. Backup generator installation to ensure uninterrupted power to operations and reduced plant downtime. Commencement of underground mining. A definitive feasibility study has been completed, with the underground preparation program that already started targeting start of development in Q4 2026. Full production from the underground mine is planned for 2028, with an anticipated delivery of up to 2.6 Mt/year at an average in situ grade of approximately 3.0 g/t Au above the cutoff grade through 2030. Complete the advanced exploration grade control drilling program at Pamunu, Ayiseru, and Asempaneye to facilitate the development of new satellite pits in 2025, with the goal of improving oxide ore feed and maximizing plant throughput. External financing is being arranged to execute this growth strategy. The Company is currently pursuing various financing initiatives, and although there is no certainty that such financing initiatives will be completed, the Company is confident that it will be able to complete such initiatives in the near term. Subject to the availability of sufficient financing, the Company expects to successfully complete the above initiatives and produce between 155,000 and 175,000 gold ounces at Bibiani in the year ending January 31, 2026, including a significant increase in monthly production in the latter part of the fiscal year following advancement of the planned waste stripping program and completion of the sulphide treatment plant. Chirano Mine –Summary of the quarter ended April 30, 2025 Results Three months ended April 30 ($000s USD) except as noted 2025 2024 Open Pit Mining: Waste mined (kt) 1,742 2,734 Ore mined (kt) 321 612 Total material mined (kt) 2,063 3,347 Strip ratio (waste:ore) 5.4 4.5 Underground Mining: Waste mined (kt) 204 210 Ore mined (kt) 461 460 Total material mined (kt) 665 670 Ore processed (kt) 929 840 Grade (grams/tonne) 1.31 1.47 Gold recovery (%) 86% 86% Gold equivalent produced (oz) 34,671 34,196 Gold equivalent sold (oz) 31,482 34,236 Revenue ($ in thousands) 95,308 73,002 Average gold price realized per ounce1 3,027 2,132 AISC1 2,587 1,951 Note:(1) Non-IFRS measure. For a description of how these measures are calculated and a reconciliation of these measures to the most directly comparable measures specified, defined or determined under IFRS and presented in the Company's financial statements, refer to 'Non-IFRS Measures'. Ore mined from open pit mining decreased by 47.6% in the three months ended April 30, 2025 compared to the same period in 2024. Ore mined decreased in the three months ended April 30, 2025, due to decreased ore mining activity as a result of a focus on stripping activities at the Mamnao central, and Aboduabo open pits. Ore mined from underground mining was relatively constant in the three months ended April 30, 2025, compared to the same period in 2024. Obra, Suraw and Akwaaba were the contributors of underground material in the three months ended April 30, 2025 whilst development started at Akoti Far South to establish another stopping area, improving flexibility. Ore processed increased by 10.6% in the three months ended April 30, 2025 compared to the same period in 2024. The increase was mainly due to greater power availability and realised benefits from plant throughput improvement project initiatives. In the three months ended April 30, 2025, ore grade processed decreased to 1.31 grams per tonne (2024 - 1.47 grams per tonne) due to proportionally more plant feed from low grade stockpiles rehandled in 2025 as opposed to open pit ore in the comparable period. The increased in ore processed, offset by lower ore grades, resulted in marginal increased gold equivalent ounces produced of 34,671 ounces in the three months ended April 30, 2025 compared to 34,196 ounces in the three months ended April 30, 2024. AISC increased to $2,587 per ounce in the three months ended April 30, 2025 compared to $1,951 per ounce in the same period of 2024. This increase was primarily driven by higher sustaining capital expenditures and higher indirect costs associated with production as well as lower volume of gold equivalent sold. Chirano Mine – Outlook For the year ending January 31, 2026, the Company plans to execute on its growth strategy which includes: Execution of process plant projects as planned to improve performance and increase the annual mine production rate to 4Mt/annum. This includes vibrating screen for primary jaw crusher installation, run-of-mine bin refurbishment, apron feeder upgrade, cyclone feed hopper upgrade, carbon regeneration kilns upgrade, mill 2 feed end and half shell replacement, installation of 12-ton acid wash and elution columns, installation of thermic oil heaters, water storage facility construction, TSF1 SE stage 2 raise and TSF3 construction. Underground development of the Akwaaba, Tano and Akoti far south mines to ensure robust underground ore delivery. Development of exploration drifts towards the north to explore and target the reclassification of the resource at Sariehu and Mamnao underground mines and to reaffirm the north mine concept of existing continuity between Obra and Sariehu underground deposits. Start of Aboduabo open pit oxide mining. Ongoing underground exploration projects at the Suraw, Obra and open pit mine life extension projects at the Sariehu/Mamnao area are progressing as planned. The Company expects to produce between 155,000 and 175,000 gold ounces at Chirano for the year ending January 31, 2026. Qualified Person Statement The scientific and technical information contained in this news release has been reviewed and approved by David Anthony, Mining and Mineral Processing, President and CEO of Asante, who is a "qualified person" under NI 43-101. Non-IFRS Measures This news release includes certain terms or performance measures commonly used in the mining industry that are not defined under International Financial Reporting Standards ('IFRS'), including 'all-in sustaining costs' (or 'AISC'), 'earnings before interest, taxes, depreciation and amortization' (or 'EBITDA'), and free cash flow. Non-IFRS measures do not have any standardized meaning prescribed under IFRS, and therefore they may not be comparable to similar measures employed by other companies. The data presented is intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance prepared in accordance with IFRS and should be read in conjunction with Asante's consolidated financial statements. Readers should refer to Asante's Management Discussion and Analysis under the heading "Non-IFRS Measures" for a more detailed discussion of how Asante calculates certain of such measures and a reconciliation of certain measures to IFRS terms. About Asante Gold Corporation Asante is a gold exploration, development and operating company with a high-quality portfolio of projects and mines in Ghana. Asante is currently operating the Bibiani and Chirano Gold Mines and continues with detailed technical studies at its Kubi Gold Project. All mines and exploration projects are located on the prolific Bibiani and Ashanti Gold Belts. Asante has an experienced and skilled team of mine finders, builders and operators, with extensive experience in Ghana. The Company is listed on the Canadian Securities Exchange, the Ghana Stock Exchange and the Frankfurt Stock Exchange. Asante is also exploring its Keyhole, Fahiakoba and Betenase projects for new discoveries, all adjoining or along strike of major gold mines near the centre of Ghana's Golden Triangle. Additional information is available on the Company's website at About the Bibiani Gold Mine Bibiani is an operating open pit gold mine situated in the Western North Region of Ghana, with previous gold production of more than 4.5 million ounces. It is fully permitted with available mining and processing infrastructure on-site consisting of a newly refurbished 3 million tonne per annum process plant and existing mining infrastructure. Asante commenced mining at Bibiani in late February 2022 with the first gold pour announced on July 7, 2022. Commercial production was announced November 10, 2022. For additional information relating to the mineral resource and mineral reserve estimates for the Bibiani Gold Mine, please refer to the 2024 Bibiani Technical Report filed on the Company's SEDAR profile ( on April 30, 2024. About the Chirano Gold Mine Chirano is an operating open pit and underground mine located in the Western Region of Ghana, immediately south of the Company's Bibiani Gold Mine. Chirano was first explored and developed in 1996 and began production in October 2005. The mine comprises the Akwaaba, Suraw, Akoti South, Akoti North, Akoti Extended, Paboase, Tano, Obra South, Obra, Sariehu and Mamnao open pits and the Akwaaba and Paboase underground mines. For additional information relating to the mineral resource and mineral reserve estimates for the Chirano Gold Mine, please refer to the 2024 Chirano Technical Report filed on the Company's SEDAR profile ( on April 30, 2024. For further information please contact: Dave Anthony, President and CEOFrederick Attakumah, Executive Vice President and Country Director info@ 604 661 9400 or +233 303 972 147 Cautionary Statement on Forward-Looking Statements Certain statements in this news release constitute forward-looking statements or forward-looking information. All statements, other than statements of historical fact, are forward-looking statements or information. Forward-looking statements or information in this news release relate to, among other things: production, free cash flow and all-in sustaining costs forecasts for the Bibiani and Chirano Gold Mines, estimated mineral resources, reserves, exploration results and potential, development programs, expansion and mine life extension opportunities, completion and timing of plant upgrades, commencement of underground mining, and completion and timing of external financing by the Company. These forward-looking statements and information reflect the Company's current views with respect to future events and are necessarily based upon a number of assumptions that, while considered reasonable by the Company, are inherently subject to significant operational, business, economic and regulatory uncertainties and contingencies. These assumptions include: the impact of inflation and disruptions to the global, regional and local supply chains; tonnage of mineralized material to be mined and processed; future anticipated prices for gold and assumed foreign exchange rates; the timing and impact of planned capital expenditure projects, including anticipated sustaining, project, and exploration expenditures; risks related to increased barriers to trade, including tariffs and duties; ore grades and recoveries; capital, decommissioning and reclamation estimates; our mineral reserve and mineral resource estimates and the assumptions upon which they are based; prices for energy inputs, labour, materials, supplies and services (including transportation); no labour-related disruptions at any of our operations; no unplanned delays or interruptions in scheduled production; all necessary permits, licenses and regulatory approvals for our operations are received in a timely manner; our ability to secure and maintain title and ownership to mineral properties and the surface rights necessary for our operations, including contractual rights from third parties and adjacent property owners; whether the Company is able to maintain a strong financial condition and have sufficient capital, or have access to capital, to sustain our business and operations; and our ability to comply with environmental, health and safety laws. The foregoing list of assumptions is not exhaustive. Forward-looking statements involve risks, uncertainties and other factors that could cause actual results, performance, prospects, and opportunities to differ materially from those expressed or implied by such forward-looking statements. Factors that could cause actual results to differ materially from these forward-looking statements include, but are not limited to, the duration and effect of local and world-wide inflationary pressures and the potential for economic recessions; fluctuations in the price of gold; fluctuations in currency markets; operational risks and hazards inherent with the business of mining (including environmental accidents and hazards, industrial accidents, equipment breakdown, unusual or unexpected geological or structural formations, cave-ins, flooding and severe weather); risks relating to the credit worthiness or financial condition of suppliers, refiners and other parties with whom the Company does business; inadequate insurance, or inability to obtain insurance, to cover these risks and hazards; employee relations; relationships and claims by local communities; changes in laws, regulations and government practices in the jurisdictions where we operate, including environmental, export and import laws and regulations; changes in national and local government, legislation, taxation, controls or regulations and political, legal or economic developments in countries where the Company may carry on business, including legal restrictions relating to mining, risks relating to expropriation; variations in the nature, quality and quantity of any mineral deposits that may be located, the Company's inability to obtain any necessary permits, consents or authorizations required for its planned activities, the Company's inability to raise the necessary capital or to be fully able to implement its business and growth strategies, and those risk factors identified in the Company's management's discussions and analysis and the most recent annual information form. The reader is referred to the Company's public disclosure record which is available on SEDAR ( Although the Company believes that the assumptions and factors used in preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Except as required by securities laws and the policies of the securities exchanges on which the Company is listed, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events or otherwise. LEI Number: 529900F9PV1G9S5YD446. Neither IIROC nor any stock exchange or other securities regulatory authority accepts responsibility for the adequacy or accuracy of this in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

Draganfly Announces Additional Exercise Of Over-Allotment Option
Draganfly Announces Additional Exercise Of Over-Allotment Option

Business Upturn

time5 hours ago

  • Business Upturn

Draganfly Announces Additional Exercise Of Over-Allotment Option

Saskatoon, SK., June 06, 2025 (GLOBE NEWSWIRE) — Draganfly Inc. (NASDAQ: DPRO) (CSE: DPRO) (FSE: 3U8A) ('Draganfly' or the 'Company'), a drone solutions, and systems developer, today announced that further to the closing of the Company's US$3.6 million underwritten public offering on May 5, 2025 (the 'Offering'), Maxim Group LLC, as underwriter and sole book-running manager, has partially exercised their over-allotment option to purchase an additional 100,000 common shares at the price of US$2.09 per share for aggregate gross proceeds of US$209,000 prior to deducting underwriter discounts and commissions. As previously announced, Draganfly intends to use the net proceeds from the Offering for general corporate purposes, including to fund its capabilities to meet demand for its new products including growth initiatives and/or for working capital requirements including the continuing development and marketing of the Company's core products, potential acquisitions and research and development. The Offering was made pursuant to an effective shelf registration statement on Form F-10, as amended, (File No. 333-271498) previously filed with and subsequently declared effective by the U.S. Securities and Exchange Commission ('SEC') on July 5, 2023 and the Company's Canadian short form base shelf prospectus dated June 30, 2023 (the 'Base Shelf Prospectus'). Draganfly offered and sold the securities in the United States only. No securities were offered or sold to Canadian purchasers. A final prospectus supplement and accompanying Base Shelf Prospectus relating to the Offering and describing the terms thereof has been filed with the applicable securities commissions in the Canadian provinces of British Columbia, Saskatchewan and Ontario, and with the SEC in the United States and is available for free by visiting the Company's profiles on the SEDAR+ website maintained by the Canadian Securities Administrators at or the SEC's website at as applicable. Copies of the final prospectus supplements and accompanying Base Shelf Prospectus relating to the Offering may be obtained by contacting Maxim Group LLC, at 300 Park Avenue, 16th Floor, New York, NY 10022, Attention: Syndicate Department, or by telephone at (212) 895-3745 or by email at [email protected] . This press release shall not constitute an offer to sell or the solicitation of an offer to buy these securities, nor shall there be any sale of these securities in any state or other jurisdiction in which such offer, solicitation or sale would be unlawful prior to the registration or qualification under the securities laws of any such state or other jurisdiction. About Draganfly Draganfly Inc. (NASDAQ: DPRO; CSE: DPRO; FSE: 3U8A) is a pioneer in drone solutions, AI-driven software, and robotics. With over 25 years of innovation, Draganfly has been at the forefront of drone technology, providing solutions for public safety, agriculture, industrial inspections, security, mapping, and surveying. The Company is committed to delivering efficient, reliable, and industry-leading technology that helps organizations save time, money, and lives. Media Contact [email protected] Company Contact Email: [email protected] Forward Looking Statements Certain statements contained in this news release may constitute 'forward-looking statements' or 'forward-looking information' within the meaning of applicable securities laws. Such statements, based as they are on the current expectations of management, inherently involve numerous important risks, uncertainties and assumptions, known and unknown. In this news release, such forward-looking statements include, but are not limited to, statements regarding the intended use of proceeds of the Offering. Actual future events may differ from the anticipated events expressed in such forward-looking statements. Draganfly believes that expectations represented by forward-looking statements are reasonable, yet there can be no assurance that such expectations will prove to be correct. The reader should not place undue reliance, if any, on any forward-looking statements included in this news release. These forward-looking statements speak only as of the date made, and Draganfly is under no obligation and disavows any intention to update publicly or revise such statements as a result of any new information, future event, circumstances or otherwise, unless required by applicable securities laws.‎ Investors are cautioned not to unduly rely on these forward-looking statements and are encouraged to read the Offering documents, as well as Draganfly's continuous disclosure documents, including its current annual information form, as well as its audited annual consolidated financial statements which are available on SEDAR+ at and on EDGAR at Disclaimer: The above press release comes to you under an arrangement with GlobeNewswire. Business Upturn takes no editorial responsibility for the same.

Nuclear Vision Announces New Private Placement
Nuclear Vision Announces New Private Placement

Yahoo

time6 hours ago

  • Yahoo

Nuclear Vision Announces New Private Placement

NOT FOR DISTRIBUTION TO UNITED STATES NEWSWIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES Vancouver, British Columbia--(Newsfile Corp. - June 6, 2025) - Nuclear Vision Limited (CSE: NUKV) (the "Company" or "NUKV") is pleased to announce a non-brokered private placement (the "Offering") of up to 7,142,858 units of the Company (each, a "Unit") at a price of $0.28 per Unit for gross proceeds of up to $2,000,000. Each Unit will consist of one common share of the Company (each, a "Share") and one common share purchase warrant (each, a "Warrant"). Each Warrant will entitle the holder to purchase one Share at a price of $0.50 for a period of 24 months from the closing date of the Offering. The proceeds of the Offering will be used to advance the Company's assets in the Republic of Botswana, including but not limited to geophysical surveys, geological mapping, and permeability testing of the sandstone horizon at depth and its susceptibility to advanced Electric Pulse technologies to increase permeability and yield on roll front geological formations in a sandstone environment, and for general working capital purposes. All securities to be issued pursuant to the Offering will be subject to a statutory four-month and one day hold period. Finder's fees may be payable in connection with the Offering, all in accordance with the policies of the Canadian Securities Exchange (the "CSE"). None of the securities sold under the Offering have been and will not be registered under the United States Securities Act of 1933, as amended, and no such securities may be offered or sold in the United States absent registration or an applicable exemption from the registration requirements. This news release shall not constitute an offer to sell or the solicitation of an offer to buy nor shall there be any sale of the securities in the United States or any jurisdiction in which such offer, solicitation or sale would be unlawful. The Company has elected not to proceed with the non-brokered private placement announced on January 23, 2025. About Nuclear Vision Limited Nuclear Vision Limited is an early-stage mineral resource exploration company. The Company's material property is the Regnault Project, consisting of 71 contiguous mineral claims covering an area of approximately 3,678 Ha located north-northeast of Chibougamau in the Province of Québec. The Company also holds the UA92 uranium project, consisting of 7 prospecting licenses totaling approximately 4,828 km2 located in central Botswana. CONTACT INFORMATION Derrick Dao, Chief Executive OfficerEmail: info@ (416) 427-4505 Investor Cubed Simon, CEOEmail: nsimon@ (647) 258-3310 Neither the "CSE" Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release. Cautionary Statement Regarding Forward-Looking Information This news release contains statements which constitute "forward-looking information" within the meaning of applicable securities laws, including statements regarding the plans, intentions, beliefs and current expectations of the Company with respect to future business activities and plans of the Company. Forward-looking information is often identified by the words "may", "would", "could", "should", "will", "intend", "plan", "anticipate", "believe", "estimate", "expect" or similar expressions and includes information regarding; the expectation that the Company will receive all necessary approvals to complete the Offering; the expectation that the Company will complete the Offering on the terms disclosed; and the intended use of proceeds of the Offering. Such forward-looking statements are based on a number of assumptions of management, including, without limitation, that the Company will receive all necessary approvals to complete the Offering; that the Company will complete the Offering on the terms and timing anticipated; and that the proceeds from the Offering will be used as anticipated. Additionally, forward-looking information involves a variety of known and unknown risks, uncertainties and other factors which may cause the actual plans, intentions, activities, results, performance or achievements of the Company to be materially different from any future plans, intentions, activities, results, performance or achievements expressed or implied by such forward-looking statements. Such risks include, without limitation: that the Company will not receive the necessary approvals to complete the Offering; that the Company will not complete the Offering on the terms disclosed, or at all; that the Company will be unable to use the proceeds received from the Offering; that the Company will not yield results from its uranium properties; changes in the Company's business plans, including its planned field programs; that the Company may incur unanticipated costs; that the Company's operations could be adversely affected by possible future government legislation policies and controls or by changes in applicable laws and regulations. Such forward-looking information represents management's best judgment based on information currently available. No forward-looking statement can be guaranteed, and actual future results may vary materially. Accordingly, readers are advised not to place undue reliance on forward-looking statements or information. Neither the Company nor any of its representatives make any representation or warranty, express or implied, as to the accuracy, sufficiency or completeness of the information in this news release. Neither the Company nor any of its representatives shall have any liability whatsoever, under contract, tort, trust or otherwise, to you or any person resulting from the use of the information in this news release by you or any of your representatives or for omissions from the information in this news release. The forward-looking statements herein speak only as of the date they were originally made. The Company has no intention and undertakes no obligation to update or revise any forward-looking statements, whether as a result of new information, future events or otherwise, except as required by law. To view the source version of this press release, please visit

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store