
This single mom says her son's education comes first. That's why she does sex work
When Piper sends her son to school every morning, she calls out a similar refrain: "I love you, try your best, I'll be here to pick you up when school is done," hoping he will be safe and supported.
As he disappears into the school building, she disappears too, into the pseudonym Piper, as a sex worker.
It's a job the single mother took on in the face of uncertainty and the need for being flexible for her son, who has high needs and isn't always able to attend school unless an educational assistant is there to support him. It's a decision driven by love.
"My son's education comes first and I can prioritize keeping him stable in his education and the progress that we've seen so far," she said in the latest This is Saskatchewan podcast episode.
Piper is among those concerned about Saskatoon Public School's announcement earlier this month that it will have to cut 80 educational assistants (Piper is not her real name; CBC is using her pseudonym to protect the identity of her son).
When her son doesn't have regular access to an EA, the school will call her to pick him up in the middle of the day.
It becomes hard to hold down a regular position with those kinds of unpredictable shifts, she said.
Part-time hours with full-time pay
She started sex work in 2022, when her son was in Grade 1.
"I began by working at a brothel. I saw an ad posting online and I could make it work with my hours. There was a shift that I could take and I could make it work," she said, explaining that she can work 20 hours in a week and make as much as she could in a full-time job.
In the fall, she had hopes that she would be able to restart her schooling and find more stable, less risky work, but she's had to put that dream on hold, with the latest announcement about cuts to EAs within Saskatoon.
"I have a feeling for a lot of people and for us, this is just a really big surprise. And for the kids, I mean, it's devastating," she said.
The school division, province and federal government have been at odds on where the responsibility lies, as the division said the cuts were a necessity, due to it not receiving expected federal funding as part of the Jordan's Principle initiative, which is meant to ensure Indigenous children receive the health, social and education services they need.
'Don't know what we'd do'
For now, affected parents are waiting to see how this might impact them, a tense situation Katherine Stevenson is also in.
Her son Hugo Romanski has Down syndrome and autism, and he requires one-on-one support all day. While she doesn't know if the cuts will impact her family, even as a two-person household, she could foresee it forcing upheaval in their lives.
"I don't know what we'd do. One of us would have to stop working altogether," she said.
Sometimes, people push back against the idea of equating school with child care, which Stevenson said she understands. But at the same time, the educational system allows parents to work, she said, adding she sympathizes for Piper's situation.
"I think people take for granted that you know you're going to have a family and the kids will be typical and things will go just smoothly and school will be straightforward and they'll never have a need for this kind of support," she said.
"But that isn't how things go. And I think as a community and as a society, we should be supporting each other."
As for Piper, she is honest with her family about what she does for work, and is transparent with them about where she's going and what she's doing, in case she goes missing.
"I don't see any shame in doing something that is keeping us fed and housed and really just living the best life that we can currently," she said.
More than concern for herself, she's concerned for her son, and his ability to get an education.
"In the morning when I drop him off, I make sure my son knows he's loved, he's supported, and I will be there to pick him up after school, said with the hope that I will be."
This story is from the This is Saskatchewan podcast — your connection to the stories Saskatchewan is talking about. Every week, Leisha Grebinski and Nichole Huck will cover local issues that matter. Hear the voices that are creating change, shaping policy and fuelling creativity in Saskatchewan.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

a day ago
Faster isn't always better. Slow-charging EVs could have big benefits
When Julia McNally decided to buy an EV and started her research, she came across a lot of articles and ads pushing an apparent must-have accessory — a speedy home charger designed specifically for EVs. Everything was pointing me to Level 2, recalled McNally, director of climate action at Toronto Hydro. She knew that all EVs can do Level 1 slow charging, or trickle charging, from a regular 120-volt wall outlet, adding about six kilometres of range per hour (except in very cold winter temperatures, which can slow charging speeds). And she already had an outlet of those in her backyard, near the alleyway where she planned to park her new Mini EV. But more than four out of five U.S. EV owners used Level 2 for home-charging in 2023, according to market research firm J.D. Power (new window) . Using a higher 240 voltage, often needed for a stove or dryer, Level 2 chargers can add about 30 to 50 kilometres of range per hour and refill a typical EV's entire 400-kilometre range overnight. Meanwhile, Level 3, or DC fast chargers, often installed along major highways, can add 250 kilometres of range per hour (some are even faster (new window) ) and charge a battery to 80 per cent in 30 minutes. Get more with a free CBC account Comment on articles, stay in the know with our newsletters and stream more on CBC Gem. Sign In (new window) Create a free account (new window) Why faster may not be better Some experts, such as Daniel Breton, CEO of Electric Mobility Canada, have argued people "really need" Level 2 chargers at home (new window) , as it can take days to charge an empty battery to full at Level 1. But most people don't drive the hundreds of kilometres needed to empty their battery each day — and there's a downside to faster charging. You're adding cost, McNally said — potentially thousands of dollars. Installing a Level 2 charger requires a licensed electrician, she said. In Toronto, it means consulting with Toronto Hydro and the Electrical Safety Authority. And homeowners often will need to increase the size of their electrical panel, adding additional costs. But it's something more Canadians may be thinking about soon, amid Canada's zero-emission vehicle mandate (new window) , requiring that 20 per cent of cars, vans and light trucks sold in Canada be electric, hybrid or hydrogen-powered cars by next year. The goal is to reach 100 per cent zero-emission vehicle sales by 2035. Conservative Leader Pierre Poilievre had vowed to scrap the target if elected (new window) , but with a Liberal re-election (new window) , the target still stands. WATCH | Can northern power grids handle electric vehicles and heat?: Début du widget Widget. Passer le widget ? Fin du widget Widget. Retourner au début du widget ? Can northern power grids handle electric vehicles and heat? Electric vehicles and electric heating are expected to put a strain on northern power grids. A new study out of Yukon University offers utilities some ways to fix that. The CBC's Liny Lamberink has more. Level 2 charging isn't just more expensive and logistically difficult for individual EV owners. In some Canadian communities, the aging electrical grid may not be able to handle too much Level 2 charging at once. For example, a recent Yukon University study found that if more northerners install Level 2 chargers and electric heating, that could cause problems for transformers (new window) — a key piece of equipment in local electricity distribution networks. At the time of the study, published last December, there were only 88 EVs in all of Yukon, and half of them were plug-in hybrids. Blake Shaffer, a University of Calgary associate professor, studied the situation in his community with local utility Enmax. He previously told CBC News (new window) that electricity distribution networks would need significant upgrades in order for all EV drivers to be able to charge at Level 2. That's where the real challenge of EVs comes about, he said, noting high costs for both individuals and electric utilities. McNally says Toronto Hydro has adequate capacity for whatever EVs and heat pumps come at us. She acknowledged, however, that in cases where someone does ask Toronto Hydro for extra capacity you need to pay for the upgrades. Meanwhile, Level 1 takes advantage of wall outlets that people often already have, including residents of apartments or condo buildings. In colder parts of Canada, many parking spaces have a plug intended for block heaters. (Although tenants may have to negotiate with their landlord to use it for charging (new window) .) WATCH | This electric vehicle owner says tenants who pay hydro should be able to plug in: Début du widget Widget. Passer le widget ? Fin du widget Widget. Retourner au début du widget ? This electric vehicle owner says tenants who pay hydro should be able to plug in Renters might find themselves in uncharted legal territory if their landlord wants to make them pay for charging their electric vehicles — even if electricity is included in their lease. Many people don't need Level 2 at home Living in Toronto, McNally doesn't drive 400 kilometres a day; typically, she only covers 600 kilometres in an entire month. So she knew that Level 1 charging was probably good enough for her needs. That's not unusual — even outside Canada's largest city. Shaffer studied the driving and parking habits of 129 EV drivers in Calgary from December 2021 to December 2022. (While that was during the tail end of the pandemic, Statistics Canada reports very similar commute times in Calgary in 2022 and 2024 (new window) .) The study found 29 per cent of drivers only ever needed Level 1 charging (new window) because they drove very little relative to the time they were parked. Another 53 per cent could use Level 1 most of the time, but might need to visit a public Level 2 or fast charging station up to once per month to top off their battery. WATCH | Canada needs more charging stations to hit EV targets: Début du widget Widget. Passer le widget ? Fin du widget Widget. Retourner au début du widget ? Canada needs more charging stations to hit EV targets Experts say Canada needs hundreds of thousands more charging stations to support electric vehicle targets, but it's unclear who's in charge of building them. The City of Vancouver estimates that the average driver can meet their daily driving needs in under four hours using a Level 1 charger and in about 45 minutes using a Level 2 charger (new window) . Either of those is plenty of time if people have a place to park and charge overnight. Level 1 can even work for drivers in rural communities. Rob van Adrichem lives in Prince George, B.C., and got an electric car this past summer. He only has Level 1 charging at home, but tops up at Level 2 chargers at the park or the library in town if he needs to. I'm finding Level 1 is no problem, he said. I think people get scared off on Level 2s because they think it's going to be thousands of dollars and I don't know that it's always necessary. Is it a tenant's right to charge an EV at their rental? (new window) Ali Mohazab is co-founder of a startup called Parkizio Technologies that helps people such as apartment dwellers access electricity for charging. He said people thinking about switching to an EV may imagine doing a variation of what they did with their gas car: driving to empty and then going to a gas station and filling the entire tank — something they're forced to do because they don't have a gas pump at their home. Mohazab said that gas mentality may not allow people to see that with an EV, every parking opportunity is a charging opportunity and it doesn't matter if you charge faster so your battery is full at 1 a.m. instead of 8 a.m. when you leave for work — you can just leave it plugged in overnight. He added, If you kind of look at your car as a, you know, cell phone with wheels, then it really makes sense. McNally has found that she doesn't even need to charge every day, even at Level 1. I charge about once a week, she said. Couldn't be easier. But how can you tell if Level 1 will be enough for you? Level 1 is probably enough for most people, Mohazab says, except those who drive all day for work, such as Uber drivers. McNally suggests this rule of thumb: If you drive less than 60 kilometres a day, you are probably just fine with the regular plug that is already at your house. She recommends that new EV owners start with Level 1 to keep things cheap and simple. Start there, see how it works, learn your patterns — and then if you really want Level 2, you can add that cost later. Emily Chung (new window) · CBC News


CBC
2 days ago
- CBC
B.C. government is going to be ‘biggest barrier' to new pipeline, says former B.C. premier
The federal government introduced legislation on Friday that it says will eliminate federal barriers to internal trade and speed up major national projects. Former B.C. premier Christy Clark tells Power & Politics that the two big challenges to getting a new pipeline through B.C. will be seeking Indigenous consensus and getting the agreement of the provincial government.

CBC
2 days ago
- CBC
Halifax mayor defends motion to temporarily pause new bike lane infrastructure
Halifax Mayor Andy Fillmore is defending a motion he intends to put forward next week at regional council to temporarily pause awarding new design and construction contracts for bike lanes. In his memo to colleagues, which was posted to Reddit on Friday, Fillmore said the move is in response to frustration among residents and business owners over "worsening traffic congestion" and the escalating project costs for the AAA (all ages and abilities) bicycle network. Fillmore stated the municipality is also failing to deliver a "balanced and efficient mobility system" as per its integrated mobility plan. Fillmore told CBC Radio's Mainstreet Halifax on Friday that his goal is to build cycling infrastructure and active transportation infrastructure "in the right way, in a way that doesn't create the very unfortunate backlash that is very real in our city right now." The mayor said he'd like to create cycling infrastructure in Halifax that doesn't sacrifice the needs of others who use the roads, like bus drivers, people who ride the bus, delivery and commercial vehicle drivers, people who have to drive in a car because they're not on a bus route, and those who aren't able to ride bikes. "We have to have a very balanced approach and I just push back on any commentary that we're facing some sort of a binary choice," Fillmore told Mainstreet. "This is very much a pause so that we can all move forward together in a mindful way that reflects the changing reality we have in our growing and busy city." Only applies to tenders not yet awarded Fillmore said the municipal bicycle network was only meant to cost $25 million. He said $16 million has already been spent, but that the budget for the project now is $93 million. "That leaves $77 million yet to be spent. Only $8 million will come from provincial and federal sources, and that leaves an unexpected $69 million to be funded through the municipal tax rate," Fillmore said. Fillmore said construction being done right now will be finished. Tenders identified in the capital budget for the next four years — but not yet awarded — would be put on hold. "This gives us an opportunity to have staff come back to us with a list of all those projects that are in that capital budget with a red light or a green light," he said, adding projects that threaten to "worsen congestion" will be paused. "All that red light means is, OK, we're just going to take a redesign here," Fillmore continued. "I expect a great percentage of the project on that list will get a green light and may only have a holdup of a month or two." 'Misguided proposal' David Trueman, the chair of the Halifax Cycling Coalition, called Fillmore's recommendation a "misguided proposal." He's calling on people to write to their regional councillor and urge them to vote against it. "We just got the cycling infrastructure projects back on track with the report to council from staff where they took the plan that was supposed to be delivered by the end of 2024 and they presented a detailed plan to get to it by 2028," Trueman said. "If we have a temporary pause, this is going to be delayed by years. We have a lot of staff and consultants tied up in designing these infrastructure protects, which take years through the pipeline. If you stop the pipeline, the flow is cut off and there can be untold delays and escalating costs." Trueman said the roads are already built and cycling is catching up. He said the upkeep cost on cycling infrastructure is a tiny fraction of what it would be for road costs. Divisive issue "These projects include all the costs of revamping a given street, and often there are other aspects of the road improvement ... [that] reduce the impact on car traffic," he said, citing a flyover bicycle bridge planned for the Macdonald Bridge site. "If we weren't worried about cars, we could do a much less expensive solution there. It's our propensity to avoid any impact to cars that raises the cost of cycling." Trueman said he thinks Fillmore's proposal is politically motivated. "Halifax has the second highest rate of active transportation of any city in Canada. Surely we don't want to throw that away," he said. "But what Andy Fillmore is keying in on is that cycling is a divisive issue. There's maybe 30 per cent of the population that has their doubts or their objections to it and he wants to create a wedge issue."