
Local trains being fitted with CCTVs, voice recorders to improve safety
'The primary goal behind installing the CVVRS is to improve operational safety and efficiency by monitoring the track conditions in front of and around the train,' a senior railway official told Hindustan Times, requesting anonymity.
Videos and recordings of conversations among crew members could provide valuable clues to investigators in case of mishaps such as the one in Mumbra on June 9 wherein five commuters died after falling off a local train, he said.
'The accident occurred when a long distance train headed in the opposite direction passed by the local train. But neither train had CCTV cameras which could show what went wrong and how such tragedies could be averted,' the official said.
The move to install CVVRS on local train rakes and locomotives of long distance trains has been expedited following the Mumbra accident, said sources in the railways.
AI-powered gear
Every local train has two motorcabs – for the motorman at the front and the train manager at the rear end. The CVVRS kit for each motorcab comprises six CCTV cameras and audio recording equipment. Two CCTV cameras capture the track ahead, while two cameras capture the motorman in the front or the train manager at the rear of the rake. Two other CCTV cameras with 180-degree view capture visuals on either side of the track.
'The cameras inside showing the motorman and the train manager will help ascertain if protocols were followed in case of any untoward incident. Voice recordings of crew members will also show if circumspect situations were called out as per the safety colour-code,' an official said.
Another official said the CVVRS has AI-powered features that will enable officials to remotely monitor local train services and avert accidents.
'The system will detect drowsiness or distraction among motormen including unauthorised use of phones and trigger alerts in case of potential hazards. It will help us communicate with motormen on the go,' said the WR official.
The cost of fitting the CVVRS in each motorcab is around ₹ 1-1.25 lakh, said officials.
Concerns
Last month, railway unions protested against the move to install the CVVRS on local trains in Mumbai, saying it could distract motormen, breach their privacy and be misused for taking administrative action against them for the smallest of reasons.
The railway administration has assured that the system will be used solely for constructive feedback and counselling, not for punitive purposes. The Railway Board has also defended the move, saying it will improve operational safety and assist in post-incident analyses.
The CVVRS places no additional burden on crew members and is purely aimed at ensuring safe train operations, the Board said in a directive to all zonal railway general managers in May, railway officials told HT.
Apart from local train rakes, WR is also installing CCTVs on locomotives as per specifications from the Research, Design and Standards Organisation of Indian Railways. The cost of installing CCTV in each locomotive is around ₹ 8-10 lakh, said officials. WR has 978 locomotives in its fleet.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Hindustan Times
9 hours ago
- Hindustan Times
How to handle a flood-damaged car: 5 important steps you should know
The monsoon rains bring much-needed relief from soaring summer temperatures, but in many parts of the country, they also leave behind a trail of waterlogged streets and stranded vehicles. For car owners, floods can cause unexpected and costly damage, not just to the vehicle's exterior but also to its critical mechanical and electrical systems. Personalised Offers on Yamaha MT 15 Version 2.0 Check Offers Check Offers Monsoon flooding can be detrimental to your vehicles if not tackled well.(Hindustan Times) If your car has been caught in rising water, quick and cautious action can make a significant difference between manageable repairs and a total loss. Experts advise against rushing into decisions and instead recommend a step-by-step approach. Here are five crucial measures every car owner should take after their vehicle has been exposed to floodwaters. (Also check out: Upcoming cars in India) Step 1: Resist the urge to start the engine The most damaging mistake car owners make after flooding is trying to restart the engine. Water may have entered the cylinders, fuel system, or exhaust. Turning the key can lead to what mechanics call 'hydrolock,' a situation where water prevents the pistons from moving, often resulting in catastrophic engine failure. The safest approach is to leave the car off, disconnect the battery for safety, and wait for a professional mechanic to conduct a proper inspection. Step 2: Inspect and document interior damage Floodwater rarely stops at the doors. If water levels reached the seats or dashboard, critical systems such as airbags, sensors, and onboard computers may have been compromised. Begin by carefully inspecting the inside of the car. Remove items such as floor mats, covers, or even detachable seats to aid ventilation. Taking photographs of the interior is also recommended as they serve as valuable evidence if you need to file an insurance claim. (Also read: Driving your car on highway? Five key rules and tips to follow) Step 3: Drain and dry immediately Time is crucial in preventing long-term damage. Standing water inside the cabin creates the perfect conditions for mould, mildew, and persistent odours. Use buckets, wet vacuums, or sponges to remove as much water as possible. Then, open all doors and windows to allow cross-ventilation. Towels and absorbent cloths can help with damp upholstery, while portable fans or dehumidifiers can assist in pulling out hidden moisture from carpets and panels. The quicker the drying process begins, the better the chances of preserving the vehicle's interior. Step 4: Avoid using electrical systems Modern cars are heavily dependent on electronics, from engine control units to infotainment displays. Even a small amount of moisture can cause short circuits or permanent damage. Do not attempt to turn on the lights, air conditioning, or radio until a professional has checked the system. If water levels reach areas housing major electrical wiring, sensors, or the fuse box, a thorough diagnostic test by a certified mechanic is essential. (Also read: Planning to drive in the hills? Five key tips you must not ignore) Step 5: Seek professional help and inform your insurance company Once the immediate steps are taken, the vehicle must undergo a comprehensive evaluation. Mechanics will inspect key systems, including the engine, transmission, brakes, and fuel lines, to determine whether repairs are feasible or if the car is a total loss. At the same time, contact your insurance company. Many policies cover flood damage, but the extent of coverage varies. Early communication and proper documentation, such as photographs and repair estimates, will make the claims process smoother. The bottom line Flood damage can turn a reliable car into a potential safety hazard if not handled correctly. With monsoon floods becoming increasingly common, knowing these steps isn't just useful but may also save lakhs in repair costs.


Hindustan Times
4 days ago
- Hindustan Times
Regal junction revamp gets heritage panel's in-principle nod
MUMBAI: The Mumbai Heritage Conservation Committee (MHCC) has granted in-principle approval for a major revamp of the Regal Cinema junction in Fort, one of the city's most historically significant crossroads. The proposal, which combines traffic reorganisation, pedestrian-friendly spaces and underground parking, is aimed at decongesting the Museum Precinct while preserving its architectural character. Mumbai, India - Aug. 17, 2025:View of Regal Junction at Colaba, in Mumbai, India, on Sunday, August 17, 2025. (Photo by Anshuman Poyrekar/ Hindustan Times) (Hindustan Times) The junction sits within the Victorian and Art Deco Ensembles of Mumbai—a UNESCO World Heritage Site since 2018—home to some of the city's most iconic buildings, including the Chhatrapati Shivaji Maharaj Vastu Sangrahalaya (formerly the Prince of Wales Museum). Regal Cinema itself, which opened in 1933 as Mumbai's first air-conditioned theatre, has long served as a cultural landmark and gateway to the precinct. At the heart of the plan is an underground parking facility that can house over 150 vehicles, topped by nearly one acre (about 4,000 square metres) of open public plaza at ground level. The surface area will feature a 360-degree viewing deck offering panoramic vistas of heritage structures such as the National Gallery of Modern Art, the Maharashtra Police headquarters, and the century-old DGP office. 'The underground parking is not independent of what is happening on the surface. It is being designed in unison,' said architect Pritesh Bafna of the Urban Design Architecture Initiative, the consultant for the project. 'This is a holistic project addressing traffic congestion, improving the public realm, easing mobility, and providing a place for people to pause and enjoy the precinct. It also tackles the broader issue of on-street parking in this beautiful area.' Currently, Regal junction has 27 traffic signals and an oval-shaped rotary with a central fountain that allows parking for only 35 cars. Access is cumbersome, and the area around the Gateway of India remains choked with on-street parking. The new design replaces the rotary with a simpler four-arm junction, supported by a modernised signal system that will streamline movement for both vehicles and pedestrians. 'We are doing away with 27 signals and creating a straightforward four-arm junction. This will ease navigation for motorists and ensure safer passage for pedestrians,' Bafna explained. The plan, however, comes with its challenges. Redesigning a busy and historically sensitive site meant balancing functional needs with heritage concerns. 'It is a working junction, and we didn't want to exceed the right of way. As a World Heritage site, it must be accessible for pedestrians and offer opportunities to appreciate the heritage around it—from the museum to the Modern Art gallery,' said Bafna. 'We wanted this plaza to be experienced, like in European cities, and to enhance the experiential value of the precinct. This is about creating a positive urban space.' Heritage activists have often emphasised that interventions in such precincts must not compromise architectural integrity. The MHCC, in granting its nod, attached conditions to safeguard this. The A ward office has been instructed to integrate the project within the larger precinct development plan, and the committee has made it clear that the public plaza must remain accessible and that all parking facilities must remain entirely underground. Former corporator Makarand Narwekar has called for quick implementation of the plan. In a letter to civic chief Bhushan Gagrani, Narwekar wrote, 'There is an urgent need to act on MHCC's recommendations and execute the project without further delay in the larger public interest.' He argued that the project is vital for easing tourist movement and pedestrian flow in Fort. 'The proposed underground facility would triple parking capacity and significantly reduce surface-level congestion,' Narwekar noted. 'This project is critical to freeing up space for pedestrians and tourists, while addressing vehicular needs underground.' Narwekar also questioned the prolonged delay in execution. The proposal, first floated years ago, had envisioned a similar underground parking facility with a public viewing deck. 'The delay has only added to the pressure on the precinct, which continues to grapple with bottlenecks, poor pedestrian facilities and haphazard on-street parking,' he said. The MHCC's approval followed a detailed presentation that incorporated suggestions made at earlier stages. Representatives from the A ward office, traffic police, and project architects were all present at the most recent meeting, where revised plans—including the simplified traffic layout—were tabled. After deliberation, the committee approved the proposal subject to modifications. A revised plan reflecting its conditions must be submitted before a final No Objection Certificate (NOC) is issued.


Hindustan Times
5 days ago
- Hindustan Times
Palghar cops flag ‘black spots' on Mumbai-Ahmedabad Highway, write to NHAI
MUMBAI: Danger is ever present on the Mumbai-Ahmedabad Highway, especially the stretch cutting across Palghar district on the Maharashtra side of the border. This 115-km-long section, extending from Vesave (near Dahisar) to Talasari, and connecting two major cities, is in focus, again, for its unusually high number of accidents and fatalities. Mumbai, India - August 06, 2025: Black Spots on National Highway No- 48 at Takwahal village located in the Palghar district of Maharashtra, India, on Wednesday, August 06, 2025. (Photo by Satish Bate/ Hindustan Times) (Hindustan Times) Now the Palghar superintendent of police Yatish Deshmukh has written to the Thane project director of the National Highways Authority of India (NHAI), identifying 14 'black spots' and demanding that the highway authority fix them on a war footing. The letter, sent to the NHAI in the last week of July, said previous letters from the police on repairs and traffic safety measures had drawn no response, prompting the police to conduct an audit and identify the black spots. The situation is so dire for motorists using this stretch that Palghar district collector Indurani Jakhar met with NHAI officers in July, pointing to large cracks in the concrete at the Vasai phata toll naka. She told NHAI officers that the number of accidents had risen between Talasari and Warkhande due to multiple openings in the median, leading to reckless lane-cutting and increased crash risk. In its audit, the Palghar police has noted a detailed list of issues that needs to be fixed. Recurring throughout the list are hazardous media openings, encouraging motorists to drive on the wrong side of the road, poor illumination, sharp and dangerous curves, encroachments and speeding. Here's a snapshot of how dangerous the Palghar stretch of the Mumbai-Ahmedabad Highway, also called the NH-48, really is: In 2023, the number of serious accidents and corresponding fatalities was 182 and 106; in 2024, it was 74 and 86; while until July 2025, there were 65 serious accidents, including 71 deaths. The Mumbai-Ahmedabad Highway came into focus when industrialist and former Tata Sons chairperson Cyrus Mistry died in a high-speed crash on the highway, on a bridge across the Surya River, on September 4, 2022. Although a case of rash driving was registered against the individual driving the Mercedes they were travelling in, the accident also brought to light the faulty design of the road leading up to the bridge. Shocking neglect Former Shiv Sena UBT corporator and transport activist Javed Lulania said, 'The NHAI claimed they had taken corrective measures and removed the accident site from the list of black spots. And yet there have been at least four accidents on the same spot since then.'' Also turning the highway into a death trap is very poor concretisation work, which has left the stretch pockmarked and cratered. Lulania, who has been working hard to improve road conditions on the highway, said, 'The concretising is haphazard and sometimes ad hoc, which is shocking for a stretch that connects two major cities.' He added, 'Often, the NHAI authorities randomly place barricades across the carriageway, leaving only one lane for traffic movement. The NHAI authorities claim they have positioned sufficient traffic marshalls on this stretch, but in reality there are only a handful. If a vehicle breaks down, there is barely any towing provision.' Borivali resident, J S Shah, a factory owner in Vapi, concurs. 'Till two years ago, I used to regularly drive to Vapi and back. I was pleased when the NHAI concretised the entire highway. But the stretch soon turned into a death trap as the concrete cracked and cratered, ruining my car's suspension. After spending ₹2 lakh in repairs, I gave up driving on this highway and now I take the train.' Dr Anand Kapse at M L Dhawle Hospital situated along the highway said, 'Ambulances are often delayed in reaching us, endangering lives.' He added that the condition of the highway is so bad that many have switched to travelling by train between Ahmedabad and Mumbai. 'We are hoping the Mumbai Vadodara Expressway opens soon, so that there is an alternative route available.'' Honouring his son's memory Lulania operates two WhatsApp groups for motorists, flagging traffic issues in real time on the NH-48. His son Owez died on the highway a few years ago while returning to Ahmedabad from Mumbai. The SUV he was travelling in skid and crashed near Silent Valley Resort. The railings at the site were broken and Owez died on the spot. His father has since made it his mission to campaign to improve road safety on the highway so that others don't meet his son's fate. Among his many public service initiatives, Lulania and a group of 12 others offer a free ambulance service to accident victims on the NH-48. Despite efforts to get the NHAI to commit to improving the highway, little seems to have changed. Former Mumbai mayor and Sena UBT deputy leader, Vishakha Raut said, 'I travel to my village in Boisar by road every fortnight. I see only labourers on site when the highway is being upgraded, but I have never seen engineers or government employees. This is shocking for a highway that connects two business hubs like Mumbai and Ahmedabad. Why don't the local MLAs raise this issue in the assembly?'' NHAI manager (technical) in charge of the Thane unit, Dipendra Singh told HT, 'We have done many improvements to the NH-48 and continue to do so. We have got ₹20 crore sanctioned to fix black spots on priority. The road is bad in some places, but this is because state government agencies had dug up the road to lay pipes and then handed us the site late for upgradation.'' Bal Malkit Singh, advisor and former president of the All India Motor Transport Congress, makes a pertinent point. 'We pay a heavy toll and, despite this, a truck that needs three days on the Surat-Mumbai-Surat run now takes five days. Traffic jams cost us diesel and maintenance, not to mention the back problems drivers are developing from navigating the highway's cratered surface.' No trauma care The 100-km stretch from Vasai to Vapi did not have a major hospital that could treat serious accident cases until August 2019, when the state health department started constructing a trauma-care centre at Manor. Soon after the death of Cyrus Mistry in 2022, the state decided to speed it up. HT visited the site on August 5, but the work was far from complete. The superstructure was leaking in many places and there were no beds or equipment. The operation theatre too was not complete. Dr Ramdas Marad, a civil surgeon in Palghar district, said the work had stopped completely during the Covid-19 pandemic and restarted only after Mistry's accident. Three years later, it is nowhere near complete. 'There is a great paucity of funds to complete the work. It will take another eight to ten months to complete the hospital,' he said.