logo
Need to involve urban & transport planner in highway projects passing through cities & towns: Experts

Need to involve urban & transport planner in highway projects passing through cities & towns: Experts

Time of India04-07-2025
NEW DELHI: Planning and preparation of highway projects passing through urban areas must involve urban and transport planners, experts said at a conference on 'Crash Safety and Physical Planning' held at IIT-Delhi on Friday.
Director of School of Planning and Architecture, Virendra Kumar Paul claimed that highway engineers have less capability to evaluate detailed project reports (DPRs). 'DPR is an issue. We had trained some NHAI engineers at IIT, Delhi. We could understand that they don't have the competence to deal with DPRs. They don't have interest in deep diving into the DPR either because they are too bureaucratic or give that task to an external consultant,' he said in the presence of Ajay Tamta, MoS of roadtransport and highways minietry.
Highways passing through urban areas need special attention as the number of fatal crashes are usually higher due to more conflict of different road users.
SPA and IIT-Delhi offered to the ministry to take up some pilot projects of evaluating DPRs prepared for NHAI and other agencies. The IIT leadership also suggested the minister to set up a Centre of Excellence to deal with crash investigation.
Addressing the gathering, Tamta called for a paradigm shift from reactive construction to proactive, innovation-led planning, where road projects are no longer isolated engineering exercises, but integrated, multi-sectoral development tools. He said there is a need for innovations which not only improve safety, but also tackle chronic issues in road projects such as land acquisition challenges, urban traffic congestion, poor last-mile connectivity, and cost overruns.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

New rly under bridge to ease traffic at Darrah Nullah
New rly under bridge to ease traffic at Darrah Nullah

Time of India

time2 hours ago

  • Time of India

New rly under bridge to ease traffic at Darrah Nullah

Jaipur: Relief is finally in sight for commuters who endured years of traffic congestion at Darrah Nullah on the Kota–Jhalawar National Highway (NH-52). The Central govt granted administrative and financial approval for the construction of a new Railway Under Bridge (RUB) near Arch Bridge No. 148, between Kanwarpura and Darrah railway stations. The project, estimated to cost Rs 9.98 crore, will be executed by the West Central Railway as a deposit work. The RUB will be constructed at KM 297.7 on NH-52 and is expected to significantly ease traffic flow between Kota and Jhalawar. Construction is scheduled to begin shortly, with targeted completion within stipulated timeframe. The eight-km stretch through Darrah Nullah — a narrow, single-lane passage wedged between the broader four-lane highway — long posed a serious threat to commuters, with frequent accidents, prolonged traffic jams, and seasonal waterlogging. Rajesh Soni, a frequent traveller, said, "Traffic on this route increased as it connects Madhya Pradesh and Rajasthan. Heavy vehicle movement is common, and traffic jams lasting up to 12 hours have been reported here." Despite the commencement of toll collection at Mandana and Bheed Mandi (Rs 165 and Rs 85, respectively), no structural improvements were made. Agencies including the NHAI, PWD, and the forest department continued shifting responsibility. Since the stretch falls within the Mukundra Tiger Reserve, the forest department raised objections to any major construction without proper clearance. A four-lane elevated road was earlier proposed but failed to gain approval .

These 15 Gzb roads saw 50% crash deaths
These 15 Gzb roads saw 50% crash deaths

Time of India

timea day ago

  • Time of India

These 15 Gzb roads saw 50% crash deaths

Ghaziabad: Over 50% of road fatalities in Ghaziabad were reported on just 15 key roads, including Delhi-Meerut Expressway, Meerut Road and GT Road, in the last three years. A study, conducted between Jan 2022 and April 2025 by the traffic police and NGO Save Life Foundation, recorded 1,219 fatalities in 1,163 road crashes across the city. It also found that 305 people involved in these crashes were grievously injured, while 71 sustained minor injuries. Additional DCP (traffic) Sachchidanand said the highest number of road crash fatalities was reported from Delhi-Meerut Expressway, which saw 158 deaths in 143 crashes, followed by Meerut Road, where 109 died in 105 crashes, and GT Road that saw 105 deaths in 101 crashes. You Can Also Check: Noida AQI | Weather in Noida | Bank Holidays in Noida | Public Holidays in Noida Other accident-prone stretches included Loni-Bhopura Road (42), NH-9 (33 deaths), Delhi-Saharanpur Road (30), Madan Mohan Malviya Road (27), Eastern Peripheral Expressway (27), Raj Nagar Extension Road (25), Hapur Road (24), Upper Ganga Canal Road (19), Wazirabad-Loni Road (13), Raj Nagar Extension Elevated Road (11), Dr Burman Madan Mohan Marg (9) and Chirodi Road (9). Police officials earlier told TOI that two-wheelers or other banned vehicles, wrong-lane driving and illegal parking were among the major factors leading to accidents on the expressways. The report also highlighted that nine police station areas—Masoori, Indirapuram, Sahibabad, Kavi Nagar, Muradnagar, Loni, Bhojpur, Vijay Nagar and Nandgram—together accounted for 56% of the total fatalities in the district. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Buy Resmed AirSense 11 with flat 20% off ResMed Buy Now Undo A month-wise analysis found a spike in accidents and deaths in the winter months, especially between Jan and March and in Nov, which see foggy conditions. The study also showed that 82% of the crashes involved rear-end collisions or pedestrian hits, and 87% of the fatalities were linked to violations caused by speeding and negligent driving. The report recommends that the National Highways Authority of India (NHAI) and urban local bodies take immediate steps to fix flawed road designs. It suggests that NHAI should rectify 20 recurring road engineering faults and assess and treat 140 high-risk crash locations where head-on, rear-end, side-impact, pedestrian, and nighttime accidents frequently occur. Additionally, it has called for nine high-fatality police station areas to be equipped with better enforcement tools, including the installation of speed cameras or violation detection enforcement systems at 210 critical spots. A total of 537 road crashes, reported in the first six months of this year, left 189 dead and 414 injured, data shared by the traffic depatment showed. In comparison, 996 road accidents resulted in 381 deaths and 781 injuries last year, while 355 road accidents reported in 2023 left 373 dead and 110 injured.

Cracks develop on side slope of Bakhtiyarpur-Mokama road
Cracks develop on side slope of Bakhtiyarpur-Mokama road

Time of India

timea day ago

  • Time of India

Cracks develop on side slope of Bakhtiyarpur-Mokama road

1 2 Patna: The side slope of the newly inaugurated Bakhtiyarpur-Mokama four-lane in Patna district developed cracks on Monday. Use of substandard materials in the construction of the side slopes appears to be the reason behind cracks in a span of around 1km, alleged local residents. Sanjeevan Kumar, a local resident, while expressing concern over development of cracks in the side slope said the four-lane project was executed by the National Highways Authority of India (NHAI). He alleged that corruption in the construction agency that executed the project led to the damage. He said, "The situation could lead to major accidents, and an investigation into the damaged side slopes should be initiated immediately. The company was informed of these issues previously. The road, which was supposed to provide access to several villages, including Chanda and Mahmadpur, remains incomplete, affecting the daily commute of residents from 10 villages. Only one flank of the four-lane is operational. " Rajeshwar Rai, a resident of Ranisarai, said that the one-way of the four-lane road has already resulted in eight to 10 accidents recently. However, project director of the Bakhtiyarpur-Mokama four-lane, Arbinda Kumar, said: "Due to heavy rainfall, slope failure occurred in the Bakhtiyarpur-Mokama project, against which rectification measures were immediately taken at the site. Further, rectification is almost completed." Built over a stretch of 44.6km, the four-lane project started in 2017 and was to be completed in Dec 2019, but it was delayed due to land acquisition issues along the route. The project completion was later extended to Dec 2021, but two lanes of one flank of the four-lane were inaugurated by chief minister Nitish Kumar in March. After travelling approximately 45 km on the Patna-Bakhtiyarpur four-lane, earlier commuters used to travel on the old two-lane road to go from Bakhtiyarpur to Mokama. Built at an approximate cost of Rs 870 crore, commuters are now travelling through the two lanes of a single flank of the Bakhtiyarpur-Mokama four-lane. The work on the other flank is still ongoing at some places. It is expected to be completed soon.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store