logo
PWD zeroes in on 11 road black spots in need for repair

PWD zeroes in on 11 road black spots in need for repair

Time of India7 hours ago

1
2
Lucknow: The public works department (PWD), in its latest survey, has identified 11 locations where road safety work is required to repair the black spots. While three accident spots are situated within the city, the remaining eight are on the national highways connecting the city with the neighbouring districts.
The road stretches where vulnerability was detected, owing to conflicts between motor vehicles, non-motorised vehicles and pedestrians are majorly situated over the Lucknow-Ayodhya road. Kamta crossing in Chinhat, which witnesses regular bottlenecks as city traffic merges with the highway-bound traffic, as well as motorists who ply via Shaheed path, is one of the key black spots.
"Road engineering needs to be improved around the intersection.
We have requested the local administration and police to get the encroachment and roadside vendors removed. Regular drives are also needed against the e-rickshaw and autorickshaw drivers, and bus drivers need to be sensitised," said an engineer deputed in the city.
However, the owner of a stationery shop in the Ismailganj locality along the highway, Vikas Chandra, added, "A lot of vehicle owners are caught unaware and take the mandatory U-turn that was constructed to facilitate movement towards the Allahabad high court building under the flyover.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
5 Books Warren Buffett Wants You to Read In 2025
Blinkist: Warren Buffett's Reading List
Undo
The concrete embankment created to funnel the vehicle into the U-turn lane is just one foot from the ground, and at night, a lot of vehicles collide into it unknowingly.
"
Similarly, near Adarsh dhabha on the Faizabad road in Chinhat, measures need to be taken to reduce conflicts. Kisan path intersection, further ahead on the route, is another point where multiple accidents have been reported. Also, near a fuel station situated close to the Barabanki border, the median needs to be strengthened to discourage two-wheelers from plying in the wrong direction.
The other locations where repair or improvements are needed include the Vibhuti Khand-Shaheed path intersection near Indira Gandhi Pratisthan, the stretch near Malhaur railway station, and Kumhrawan intersection on Sitapur road, among others. Officials said that a budget of close to Rs 52 lakh will be required for the improvement works.
In the past, the most vulnerable black spot was detected around the Gosainganj trisection on the Sultanpur road. However, measures were taken to reduce casualties. Over the years, more than 85 fatal accidents took place over the 500-mt road stretch owing to over-speeding, wrong-side driving and jumping the road signals, among other reasons.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Mercedes-Benz launches EQS 580 Celebration edition at Rs 1.3 crores: Limited to 50 Units
Mercedes-Benz launches EQS 580 Celebration edition at Rs 1.3 crores: Limited to 50 Units

Time of India

time16 minutes ago

  • Time of India

Mercedes-Benz launches EQS 580 Celebration edition at Rs 1.3 crores: Limited to 50 Units

Mercedes-Benz India has launched the Mercedes-Benz EQS 580 Celebration edition in the Indian market. The luxury electric sedan is priced at Rs 1.3 crores (ex-showroom) and will be limited to just 50 units. Interested customers can book the limited edition EV online or by visiting their nearest Mercedes-Benz dealership. deliveries are expected to begin soon. The 'Celebration Edition' has been launched to commemorate a remarkable 73% year-on-year growth in EV sales for Mercedes-Benz India compared to May 2024. Let's take a look at what's special. It comes with feature enhancements that elevate the rear seat experience to true luxury, despite being priced the same as the standard model. The exterior and interior design of the EQS 580 Celebration Edition remain unchanged. Inside, it comes with the Rear Seat Comfort Package , making the rear seat experience even more indulgent than the standard EQS 580, which is already renowned for its backseat luxury. The EQS 580 Celebration Edition features contoured rear seats with massage and lumbar support functions, rear seat reclining of up to 38 degrees, an electric boss mode with the Chauffeur Package, and premium Nappa leather upholstery . VinFast VF7, VF6 Review: Good for India or not?| TOI Auto by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Memperdagangkan CFD Emas dengan salah satu spread terendah? IC Markets Mendaftar Undo In terms of other features, it getstriple-screen layout, comprising a 12.3-inch digital instrument cluster, a 17.7-inch OLED central touchscreen, and an additional 12.3-inch display for the front passenger, rear seat dual 11.6-inch entertainment screens along with a 7-inch tablet that allows control over key in-car functions, colour-based augmented reality head-up display, power-adjustable front seats with both heating, ventilation, and memory settings, a four-zone climate control, a panoramic glass roof, wireless charging pads, ambient lighting with multiple colour options, Burmeister sound system and ventilated, massaging and heated rear seats. Safety-wise, it gets multiple airbags, a 360-degree surround camera, automatic parking assistance, steering assist, rear parking sensors, a tyre pressure monitoring system, ADAS features such as adaptive cruise control, lane keep assist, driver attention monitoring, and more. Talking about the battery and e-motor, the Mercedes-Benz EQS 580 is powered by a 107.8 kWh lithium-ion battery paired with two electric motors—one on each axle—that together deliver a combined output of 523 hp and 855Nm of torque. The EQS 580 4MATIC can accelerate from 0 to 100 km/h in just 4.3 seconds, while its top speed is electronically limited to 210 km/h. The battery supports fast charging of up to 200kW, and the EQS 580 comes with an ARAI-certified range of 857km on a single charge.

Leaked on GitHub: US government's entire AI plan, what the page website that has now disappeared revealed
Leaked on GitHub: US government's entire AI plan, what the page website that has now disappeared revealed

Time of India

timean hour ago

  • Time of India

Leaked on GitHub: US government's entire AI plan, what the page website that has now disappeared revealed

President Donald Trump speaks during an event to sign a bill blocking California's rule banning the sale of new gas-powered cars by 2035 in the East Room of the White House, Thursday, June 12, 2025, in Washington. (AP Photo/Evan Vucci) The Trump administration's plan to integrate artificial intelligence across all federal agencies was accidentally exposed through a GitHub repository before being hastily removed, revealing a July 4 launch date for a new platform designed to automate government operations. The GitHub repository vanished shortly after reporters began asking questions, though it was later found archived in GSA's project collection. The domain currently redirects to Tesla's former engineer to lead the AI platform The leaked repository, discovered by multiple observers and first reported by 404 Media, showed the General Services Administration (GSA) developing a "whole-of-government, AI-first strategy" under the leadership of Thomas Shedd , a former Tesla engineering manager now heading the Technology Transformation Services. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Free P2,000 GCash eGift UnionBank Credit Card Apply Now Undo The platform will feature three core components: an AI-powered chatbot, an "all-in-one API" connecting agencies to models from OpenAI, Google, and Anthropic, and a monitoring system called "CONSOLE" that tracks real-time AI usage across government departments. Trump administration seems to go in in full startup mode Shedd, described as an Elon Musk ally, reportedly wants GSA to "operate like a software startup" and has pushed for AI tools that other agencies will be required to use. The staging site revealed integration plans with Amazon Bedrock, Meta's LLaMA, and various FedRAMP-certified vendors, though some listed models appear to lack proper government certification. Internal government reaction to the AI push has been "pretty unanimously negative," according to federal employees who expressed concerns about security vulnerabilities and the potential for AI to introduce bugs into critical systems or recommend terminating essential contracts. Experts worried about security concerns The leaked documentation shows CONSOLE will monitor how employees use AI tools and track their preferences, raising questions about workplace surveillance. Experts warn that widespread AI adoption could create significant security risks as these systems process confidential data and personally identifiable citizen information. The July 4 launch date, as seen on the website, suggests that the Trump administration plans to accelerate AI integration as part of broader government efficiency initiatives championed by Musk's Department of Government Efficiency. AI Masterclass for Students. Upskill Young Ones Today!– Join Now

Negligence in R&B works exposed in Devanakonda
Negligence in R&B works exposed in Devanakonda

Hans India

time2 hours ago

  • Hans India

Negligence in R&B works exposed in Devanakonda

Devanakonda: The bridge connecting Alarudinne and Valigonda villages in Devanakonda mandal of Kurnool district has once again turned perilous for commuters, as large potholes have reappeared on its surface—barely six months after the Roads and Buildings (R&B) department undertook repair works. This bridge, situated on the crucial Kurnool-Ballari main road, spans across the Handri river and plays a vital role in inter-state transport between Andhra Pradesh and Karnataka. Constructed in 1940 during the British era at an estimated cost of Rs 1.2 lakh, the structure was originally designed to withstand vehicular loads up to 40 tonnes. An indicatordisplaying the load limit still stands as a relic of its historic significance. For the past 85 years, this bridge has served as a lifeline for transportation, facilitating uninterrupted movement of goods and passengers. However, time and lack of proper maintenance seem to be taking a toll on the ageing structure. In a recent attempt to address safety concerns, the R&B department had spent Rs 2 lakh to fill the major potholes using hydraulic powder-based materials. While this repair temporarily halted vehicular movement for a month, the relief was short-lived. Within just six months, the same craters have reappeared, subjecting daily commuters to severe inconvenience and raising alarming safety concerns. Adding to the danger, the protective sidewalls of the bridge have also sustained significant damage, increasing the risk of accidents. According to local estimates, over 400 vehicles, includingpassenger and goods carriers, use this bridge every day. Locals express deep concern over the deteriorating condition of the bridge and the potential for tragic incidents. 'We're constantly worried—each time we cross the bridge, we wonder if an accident is just waiting to happen,' said a frequent traveler. The resurfacing of potholes so soon after repair clearly indicates substandard work and lack of accountability. Citizens urge the government and the R&B department to take immediate and permanent measures—not only to ensure the bridge's safety but also to consider the long-overdue construction of a new bridge to support the growing vehicular load. The crumbling bridge has become a symbol of administrative negligence, and unless urgent steps are taken, it may soon lead to a catastrophe that could havebeen prevented.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store