
BREAKING GROUND FOR A NEW TRANSITIONAL APARTMENT IN PRINCE ALBERT Français
Developed by YWCA Prince Albert, the multi-million-dollar project will add 20 one-bedroom units to the city, which will contain 10 bachelor units, eight one-bedroom units, two one-bedroom barrier-free units and a common area for services. The property will be located on 18 th Street West and the units are expected to be completed in early 2027.
YWCA Prince Albert is a non-profit organization providing shelter, supportive housing, and assistance to marginalized populations to help break the cycle of poverty. For this project, YWCA Prince Albert (YWCA) plans to give priority tenancy to women transitioning from YWCA programs, which includes women and youth at risk of violence and homelessness and young mothers. Tenants will receive support services through YWCA Prince Albert's various programs.
As we build a strong Canadian housing sector, purposeful collaboration will be essential. That means working hand-in-hand with the non-profit sector to bring down costs and build homes at a scale and speed not seen since the Second World War.
Quotes:
"These homes being built by YWCA Prince Albert will provide individuals in need a safe space and peace of mind. The federal government is committed to supporting communities across the country in ensuring every Canadian has a place to call home." – The Honourable Gregor Robertson, Minister of Housing and Infrastructure and Minister responsible for Pacific Economic Development Canada
"This investment will provide vulnerable women with a safe, supportive place to call home and hope for a brighter future. With strong support of community partners, we are happy to see construction begin on this new transitional housing development that will provide stability and life-changing support for women in need," – The Honourable Terry Jenson, Minister of Social Services and Minister Responsible for Saskatchewan Housing Corporation (SHC)
"We are glad to be starting construction on this much-needed project in partnership with the municipal, provincial, and federal governments. Between rising costs and low housing supply in Prince Albert, finding appropriate housing is challenging, particularly on limited or fixed incomes. Our new twenty-unit low-income housing build will help to address some of the gaps we're seeing for individuals and families living in the lower income brackets. We will be providing support as needed through our Community Connection Centre for things such as employment assistance, renter information, and more." -- Donna Brooks, YWCA Prince Albert CEO.
"We're pleased to support this important initiative. Affordable housing is a vital part of a healthy community, and this project is an important step toward ensuring everyone in Prince Albert has access to safe, stable housing," – Michael Nelson, Planning and Development Manager, City of Prince Albert.
Quick facts:
The National Housing Strategy (NHS) is a 10+ year, $115+ billion plan to give more Canadians a place to call home. Progress on programs and initiatives are updated quarterly on the Housing, Infrastructure and Communities Canada (HICC) website. The Housing and Infrastructure Project Map shows affordable housing projects that have been developed.
As of March 2025, the federal government has committed $65.84 billion to support the creation of over 166,000 units and the repair of over 322,000 units. These measures prioritize those in greatest need, including seniors, Indigenous Peoples, people experiencing or at risk of homelessness, and women and children fleeing violence.
NHS is built on strong partnerships between the federal, provincial, and territorial governments, and continuous engagement with others, including municipalities, Indigenous governments and organizations, and the social and private housing sectors. This includes consultations with Canadians from all walks of life, and people with lived experience of housing need.
All NHS investments delivered by the federal, provincial, and territorial governments will respect the key principles of NHS that support partnerships, people, and communities.
In 2019, the Government of Canada and the Government of Saskatchewan entered into an agreement through the National Housing Strategy. The Canada-Saskatchewan Bilateral Agreement will invest $585 million over 10 years, which is cost matched between the federal and provincial governments.
The Rental Development Program (RDP) provides one-time capital funding in the form of a forgivable loan to assist in the development of affordable rental housing units for households with low incomes. The RDP is funded by Canada Mortgage and Housing Corporation (CMHC) and Saskatchewan Housing Corporation (SHC).
YWCA Prince Albert provides shelter, supportive housing, and assistance to marginalized populations to help break the cycle of poverty. Operating since 1912, YWCA offers two crisis shelters, housing projects, housing case management, recovery services, settlement services, and comprehensive support programs.
Since 2007, Saskatchewan Housing Corporation (SHC) has worked with Prince Albert housing providers to develop 415 affordable rental units. In addition, through SHC's Shelter Enhancement Program, YWCA has completed multiple shelter improvements benefiting victims of family violence, with funding of $199,000.
Funding provided for this project is as follows:
$3,762,516 in cost-matched funding from the Government of Canada and the Government of Saskatchewan through the National Housing Strategy (NHS) – Saskatchewan Priorities Initiative (SPI)
$414,694 from YWCA Prince Albert
$30,000 from the City of Prince Albert
Associated Links:
Visit Canada.ca/housing for the most requested Government of Canada housing information.
CMHC plays a critical role as a national facilitator to promote stability and sustainability in Canada's housing finance system. Our mortgage insurance products support access to homeownership and the creation and maintenance of rental supply. We also actively support the Government of Canada in delivering on its commitment to make housing more affordable. Our research and data help inform housing policy. By facilitating cooperation between all levels of government, private and non-profit sectors, we contribute to advancing housing affordability, equity, and climate compatibility. Follow us on X, YouTube, LinkedIn, Facebook and Instagram.
Progress on programs and initiatives are updated quarterly on the Housing, Infrastructure and Communities Canada (HICC) website. The Housing and Infrastructure Project Map shows affordable housing projects that have been developed so far.
In November 2019, the Government of Saskatchewan released Saskatchewan's Growth Plan: the Next Decade of Growth 2020-2030, which sets out the Government's vision for a province of 1.4 million people by 2030. The Plan identifies principles, goals and actions to ensure Saskatchewan is capturing the opportunities and meeting the challenges of a growing province. To learn more, visit www.saskatchewan.ca
SOURCE Canada Mortgage and Housing Corporation (CMHC)
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

CBC
18 minutes ago
- CBC
Transport committee meeting to study B.C. Ferries' $1B loan for Chinese ships
Social Sharing Transport Minister Chrystia Freeland told MPs Friday she is "dismayed" by a $1 billion federal loan for B.C. Ferries' purchase of four new electric-diesel ships from a Chinese shipbuilder — but did not call for the contract's cancellation. The House of Commons transport committee launched a study of the Canada Infrastructure Bank loan today. B.C. Ferries announced in June that it had hired China Merchants Industry Weihai Shipyards to build the new ships after a five-year procurement process that did not include a Canadian bid. The Canada Infrastructure Bank contributed $1 billion to the deal and said in June that the new ferries "wouldn't likely be purchased" without this financing. In her opening remarks before the committee Friday, Freeland said she was troubled by the planned purchase and she believes in supporting Canadian jobs. She said she has sent 71 letters directing all organizations under the Transport Canada umbrella to prioritize Canadian content in their major procurements where feasible, particularly Canadian steel, aluminum, and lumber. When Canadian options aren't available, she said, the preferred option is to buy from countries with trade deals that include reciprocal procurement agreements. Freeland also said Transport Canada will be convening a meeting with provinces and territories, ferry owners and operators, shipyards, labour representatives and the steel industry. She said she's also assembling a second meeting with major rail operators. Freeland did not directly respond to questions from MPs about whether she would reject the loan. She said she agrees that this is a moment of crisis for the steel and aluminum sectors and they need the government's support. WATCH | Mayors say there's a pressing need for new ferries, no matter who builds them: Calls to cancel B.C. Ferries contract with China misguided, say some mayors 19 days ago Housing and Infrastructure Minister Gregor Robertson and the CEOs of B.C. Ferries and the Canada Infrastructure Bank are set to testify at the meeting later today. The Canada Infrastructure Bank is accountable to Parliament through Robertson. Jeff Groot, executive director of communications for B.C. Ferries, said the company signed the loan with the bank before the contract with the Chinese shipyard was finalized. Dan Albas, Conservative transport critic and committee co-chair, requested the study and has asked questions about why $1 billion in public funds was earmarked to finance overseas shipbuilding in the middle of a trade war with the U.S. Freeland sent her B.C. counterpart, Mike Farnworth, a letter in June saying she was disappointed that B.C. Ferries would choose a Chinese state-owned shipyard "in the current geopolitical context," and asking him to confirm that no federal funding would be diverted to purchase the ferries. Before Friday's meeting began, Bloc MP Xavier Barsalou-Duval said he'd like to see an apology from the government and from the Canada Infrastructure Bank. He said it's "unacceptable" and "problematic" that the government plans to invest in foreign infrastructure when Canada's steel industry is facing tariffs from the United States. The new vessels are expected to join the B.C. Ferries fleet between 2029 and 2031.


Toronto Star
29 minutes ago
- Toronto Star
CNL and Partners Identified Three Canadian Locations to Advance the Design of Renewable Diesel Production Facilities
CHALK RIVER, Ontario, Aug. 01, 2025 (GLOBE NEWSWIRE) — Canadian Nuclear Laboratories (CNL), Canada's premier nuclear science and technology laboratory, in partnership with Expander Energy Inc. (Expander), Fuel Cell Energy (FCE), St Marys Cement (SMC), and Nuclear Promise X (NPX), are pleased to announce that they have identified three Canadian locations as potential sites for the location of renewable diesel production facilities. These facilities would be capable of converting wood waste feedstock into 90 million litres of 'drop-in ready' renewable diesel fuel per year, transforming a waste product into a valuable, low-carbon fuel for the transportation sector. This milestone follows the successful completion of a feasibility study, funded through Natural Resources Canada's (NRCan) Clean Fuels Fund, which demonstrated the economic viability of synthetic diesel production using biomass through water electrolysis. The concept, known as 'e-Syn', encompasses the use of water and water electrolysis as part of an innovative, patented and patent pending process for making bio-synthetic fuels developed by CNL and Expander, called the Biomass Electrolysis to Liquids (BETL™) technology. The project leverages Expander's technology for biomass gasification and bio-synthetic fuel production, and electrolysis technology. The resulting fuel (either bio-synthetic diesel, known as Bio-SynDiesel®, or bio-synthetic aviation fuel, known as Bio-SynJet®) will be comprised entirely of carbon sourced from biogenic (atmospheric) sources, and is expected to have very low life cycle carbon intensity.


Winnipeg Free Press
29 minutes ago
- Winnipeg Free Press
Month-old pedestrian crossing at Winnipeg's Portage and Main gets mostly positive reviews
On a cool and overcast Monday afternoon, smartly dressed workers strode with purpose across Portage Avenue at Main Street, nearly rubbing shoulders with a pair of backpack-toting tourists whose gaze was fixed on an office tower's upper floors. As a pedestrian signal's countdown hit zero and drivers got a green light, Winnipeg's best-known intersection looked like any other in any Canadian city's downtown core, a month after reopening to foot traffic for the first time in 46 years. 'It's kind of funny our main intersection, our flagship intersection, was closed off,' office worker Brad Obirek told the Free Press after crossing the west side of Portage. 'It seems more vibrant now. I'm happy the city is being progressive.' The change has made it easier and quicker to get around on foot, said Obirek, who had a gym bag slung over his shoulder after working out on his lunch break. He stood where a visually imposing (and since-demolished) concrete barrier separated traffic lanes and a sidewalk when pedestrian crossings were forbidden in the heart of Winnipeg. There was support and opposition when Portage and Main became vehicle-only in 1979 as part of a commercial development deal. The hope, at that time, was new buildings would breathe new life into an area where revitalization is still an objective. Proponents of Portage and Main's new look had a similar hope when at-grade crossings resumed June 27, following decades of debate. Time will tell what happens. Early reviews from Winnipeggers interviewed by the Free Press were mostly positive. Some were indifferent or concerned about potential impacts on traffic or the future of the Portage and Main Circus, a circular concourse beneath the intersection. Initially tabbed for closure, the concourse connects to high-rise buildings and Winnipeg Square, a subterranean mall with stores, restaurants and services. The underground spaces offer shelter from cold or rainy weather. Obirek was in favour of reopening Portage and Main to foot traffic. He said he will continue to use the underground route, especially when he goes out for lunch, but he prefers to be above ground. 'It's a better walk. It's nice to get fresh air,' he said. His drive to and from work can take him through Portage and Main, but he hasn't noticed much of a difference to travel times. 'It seems more vibrant now. I'm happy the city is being progressive.'–Brad Obirek For downtown worker Ryan Holm, being able to cross at street level has provided a little bit more convenience. 'We'll see what happens when winter comes,' he said. Holm said he hasn't noticed anything negative while driving through the intersection. 'It's pretty much the same as before,' he said. 'I thought traffic might slow down, but it doesn't seem that way. I think it will be fine going forward. It's been less of an issue than I thought it would be.' Melissa Graham, executive director of the downtown-based Manitoba League of Persons with Disabilities, crosses Portage and Main about once a week. 'On the positive side, it makes downtown easier to access,' Graham said. 'A lot of people avoided the underground because it was complicated to access.' She said the only downside is the length of time per crossing. Existing crossing times could prove stressful for a person who uses a manual wheelchair or a senior who uses a walker, she said. 'They're very short,' said Graham, who uses a power wheelchair. 'Even I found they could be a little longer.' The signals play non-visual audible tones. The city recently introduced a five-second head start for pedestrians at intersections throughout downtown. There are signs that people are still adjusting to the change. Graham said a few drivers appeared to forget she had the right of way and came to a stop too close to her. The city has urged all road users to pay extra attention to each other, and to make note of a few specific changes. Northbound drivers cannot turn right from Main onto Portage East, a change designed to improve safety and give pedestrians more room on the sidewalk. There are now three left-turn lanes from eastbound Portage to northbound Main. One lane continues straight to Portage East. There is now only one right-turn lane to southbound Main. Raylene Stagg, who's worked downtown for 15 years, said she felt uneasy when she walked through Portage and Main for the first and only time as of Monday. While she was happy to see more pedestrians on the surface, she would rather use the underground network to get from one side to the other. 'I really hope they don't get rid of the underground,' Stagg said. 'I much prefer it, and feel more comfortable using it than Portage and Main.' Stagg, who avoids the intersection when driving, said pedestrians will prefer to be underground in winter. Seated on a bench in a courtyard just west of the intersection, she said traffic back-ups appear to be longer now that pedestrians are in the mix. In the same courtyard, Jeremy Magotiaux said he thinks Portage and Main will bring more vibrancy and benefits to downtown. 'Seeing more people out and being active is always a nice feeling,' he said. 'It will be fine as people get used to it.' 'We are still very hopeful that the underground can remain open.'–Kate Fenske Magotiaux, who still uses the 'bunker' beneath the intersection, said he hasn't noticed a change to travel times since Portage and Main was revamped. Critics suggested the reopening to pedestrians would be a waste of money, result in longer commutes or make the city's sixth-busiest intersection more dangerous. It's too soon for the city to have any data on commute times, the daily number of pedestrian crossings or collisions, spokeswoman Julie Dooley said. Manitoba Public Insurance had not received any claims for collisions involving pedestrians or cyclists as of Monday, according to preliminary data. Spokeswoman Tara Seel said nine vehicle collisions were reported at Portage and Main in the first four weeks of July, compared with four and 10 during the same periods in 2024 and 2023, respectively. Jino Distasio, a professor of urban geography at the University of Winnipeg, said he thinks most Winnipeggers have realized Portage and Main is no more or no less different than any other intersection. 'It's now just a simple street crossing that became mired in a long debate over politics and not common sense,' he said. Distasio was among the first pedestrians to cross June 27. He's also driven through the intersection a few times. For him, the novelty is over. 'I suspect anyone new to Winnipeg would not even notice the changes,' he said. 'I say this in a good way. The design was thoughtful and is now a functional crossing.' In his opinion, the more pressing issue is focusing on rebuilding retail in the area, and making it a true, walkable pedestrian space. MIKE DEAL / FREE PRESS FILES 'The intersection's opening will help, but now we must address the barriers that have prevented downtown recovery post-pandemic,' he said. 'But unlike Portage and Main, the wrecking ball will not help. What we need is a co-ordinated effort among many.' Portage and Main closed to foot traffic in a 40-year deal the city struck with a property developer that built offices and the underground mall. Pedestrians were forced underground or had to cross at different intersections at street level. A year before the deal expired in 2019, two-thirds of Winnipeggers who voted in a non-binding plebiscite opposed reopening Portage and Main to pedestrians. The catalyst for change was a City of Winnipeg staff report in 2024 that said it would cost $73 million and cause up to five years of traffic disruption to dig up the road and replace a waterproof membrane that protects the concourse — work that would have to be repeated decades later. City council voted 11-3 to end the ban on pedestrians. The city said the eight-month construction project came in under its $21.3-million budget and on schedule to coincide with Winnipeg Transit's network overhaul. Mayor Scott Gillingham, who previously opposed reopening Portage and Main to pedestrians, likes what he's seen so far. 'The traffic is flowing smoothly, the pedestrians are crossing the street seemingly with ease,' he said. 'There's been really no interruptions and no problems at this point. I think it's a better look to our key intersection in the heart of our city.' Kate Fenske, CEO of the Downtown Winnipeg Business Improvement Zone, hopes the reopening is a step toward bigger things. 'It was one of those moments, I think, in our history that marks a general change, saying people are important, that a vibrant downtown community is a priority and that accessibility matters,' she said. 'Sometimes it's risky to make a big move and make a change, but when the change happens and everything seems to be running fairly smoothly, that's a good sign. Hopefully, it shows we can make some more bold decisions downtown moving forward.' 'The intersection's opening will help, but now we must address the barriers that have prevented downtown recovery post-pandemic.'–Jino Distasio The underground concourse's fate has not yet been decided by council, which is awaiting a staff report that will outline its condition and potential steps forward. The 2024 staff report said it could cost up to $50 million to decommission the city's portion of the concourse. Downtown Winnipeg BIZ and several other organizations lobbied the city to keep it open for the benefit of residents, workers and visitors. 'I don't think it has to be an either-or. We understand there are financial reasons and decisions that were made, and I think right now the right decision has been made to open it to pedestrians and for people simply to cross,' Fenske said. 'We are still very hopeful that the underground can remain open because the most important thing is that no matter where you're trying to get to, or how you're travelling, that it is easy to get around downtown, and that we are a connected community.' Christine Neustaeter, who owns Eye GO Mobile Optical in Winnipeg Square, said the volume of foot traffic that passes by her store could drop if the concourse closes. 'It's not any different,' said Neustaeter, who opened the store in 2018, said of the uncertainty hanging over businesses. 'We've had so much uncertainty since COVID.' She said it's too soon to tell if Portage and Main's street-level changes will have an impact on her business. Fenske said Downtown Winnipeg BIZ members in the underground area are still seeing customers, and haven't reported any negative feedback. The Building Owners and Managers Association of Manitoba, which represents some buildings linked to the concourse, wants the space to stay open. RUTH BONNEVILLE / FREE PRESS Christine Neustaeter is the owner of EYEGO Mobile Optical store. 'Mayor and council insist that the (city-owned) underground circus is too expensive to repair and so it should be decommissioned. We disagree,' executive director Tom Thiessen wrote in an email. 'BOMA's position has been consistent on this matter: The underground concourse is a vital part of the downtown network, providing year-round, climate-controlled access for downtown workers and businesses. Weekday Mornings A quick glance at the news for the upcoming day. 'Our building owners at Portage and Main have all made significant investments in order to upgrade and maintain their respective sections of the concourse, and the City of Winnipeg should be expected to do the same.' For the most part, pedestrians seem to be crossing Portage and Main safely, and most drivers seem to be approaching the intersection with caution, Thiessen said. 'Hopefully, that continues to be the case,' he wrote. 'The at-grade crossing doesn't seem to be particularly busy during the business day. That leads us to believe that most downtown workers and many visitors are still crossing the intersection via the underground concourse.' — With files from Malak Abas Chris KitchingReporter Chris Kitching is a general assignment reporter at the Free Press. He began his newspaper career in 2001, with stops in Winnipeg, Toronto and London, England, along the way. After returning to Winnipeg, he joined the Free Press in 2021, and now covers a little bit of everything for the newspaper. Read more about Chris. Every piece of reporting Chris produces is reviewed by an editing team before it is posted online or published in print — part of the Free Press's tradition, since 1872, of producing reliable independent journalism. Read more about Free Press's history and mandate, and learn how our newsroom operates. Our newsroom depends on a growing audience of readers to power our journalism. If you are not a paid reader, please consider becoming a subscriber. Our newsroom depends on its audience of readers to power our journalism. Thank you for your support.