
Tripura's Electric Locomotives: Historic Shift in Railway Connectivity, ET Infra
Advt
The Northeast Frontier Railway (NFR) is continuing its hectic efforts to start running the much-anticipated electric locomotive-powered trains from Tripura at the earliest, an official said on Friday.An NFR official said that a trial run of the passenger train with an electric locomotive was successfully conducted on Friday between Agartala railway station and southern Assam's Arunachal Junction railway station in Cachar district."Before regular running of electric passenger trains , such trial runs are mandatory. Few more trials of trains driven by electric locomotives are likely to be conducted before regular running of electric trains from Tripura," the official said.He said that the first goods train trial run with an electric locomotive was successfully conducted on February 6 between southern Assam's Badarpur station and Tripura's Jirania station, 15 km north of Agartala railway station.According to the NFR official, necessary infrastructural works including electrification were completed recently in southern Assam and Tripura."After the successful operation of some more passenger and goods trains with electric locomotives, the regular running of passenger trains with electric locomotives would start on the route. We are frantically trying to start running passenger trains with electric locomotives at the earliest," the official said.Tripura is now well connected with Delhi, Kolkata, Mumbai, Firozpur, Patna and other cities of the country by several express trains but passenger train services have been solely powered by diesel-powered engines.A ₹46 crore electrification project was launched in 2022 to connect Tripura with the national railway grid with electric trains.The Tripura State Electricity Corporation Ltd (TSECL) would supply power to the railway electric transmission lines. As the infrastructure with electric railway lines is getting ready, the iconic Vande Bharat Express trains will be extended up to Assam's Silchar and Agartala within the next few months, the NFR official said.Prime Minister Narendra Modi flagged off Assam's first Vande Bharat Express on May 29, 2023, connecting Guwahati with New Jalpaiguri (West Bengal).The Guwahati-New Jalpaiguri Vande Bharat Express train journey takes 5 hours and 30 minutes, as compared to the previous fastest train on the same route, which takes about 6 hours and 30 minutes.The Guwahati-New Jalpaiguri Vande Bharat Express train operates six days a week. The NFR operates in the northeastern states, seven districts of West Bengal, and five districts of north Bihar.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
17 minutes ago
- Time of India
PM Modi to launch yellow line metro, Vande Bharat Express in Bengaluru
Narendra Modi will inaugurate Bangalore Metro's Yellow Line and the Bengaluru-Belagavi Vande Bharat Express. He will also lay the foundation for Bangalore Metro Phase-3. The Yellow Line spans over 19 km with 16 stations. Metro Phase 3, also known as the Orange Line, will cover over 44 km with 31 stations. Tired of too many ads? Remove Ads Tired of too many ads? Remove Ads Prime Minister Narendra Modi will inaugurate the much-awaited Yellow Line of Bangalore Metro and the Vande Bharat Express train between Bengaluru and Belagavi here on will also lay the foundation stone for the Bangalore Metro Phase-3 project. As per the itinerary shared by the Chief Minister's Office, Modi will participate in three events during his nearly four-hour visit to the will be landing at the HAL Airport here at 10.30 am. He will then travel by helicopter and road to the KSR Bengaluru (city) railway station, where he will flag off Vande Bharat Express train between KSR will also virtually flag off two more Vande Bharat Express trains between Amritsar-Sri Mata Vaishno Devi Katri, and Ajni (Nagpur)- will then travel by road to the RV Road (Ragigudda) metro station on the Yellow Line. Between 11:45 am to 12:50 pm he will be flagging off Yellow Line (reach 5) and take a metro ride to the Electronic City there, Modi will travel to the International Institute of Information Technology (IIIT) Bengaluru, where he will be laying the foundation stone for Bangalore metro phase-3 and officially inaugurating the yellow line from RV Road (Ragigudda) to Bommasandra station, and address the will then travel by helicopter to the HAL Airport and fly back to Delhi at 2.45 to PM's office, the yellow line metro from RV Road (Ragigudda) to Bommasandra of Bangalore Metro Phase-2 project, having a route length of over 19 km and 16 stations, is worth around Rs 7,160 the opening of this yellow line, the operational metro network in Bengaluru will increase to over 96 km, serving a large population in the per officials, the yellow line is expected to ease traffic congestion in several heavily congested corridors like Hosur Road, Silk Board Junction, and Electronics City Metro Phase 3, also known as the Orange Line, for which the PM will be laying the foundation, will be built at an estimated cost of Rs 15,611 total route length of the project will be more than 44 km with 31 elevated stations. This infrastructure project will address the growing transportation needs of the city, catering to residential, industrial, commercial, and educational 3 will have two corridors or lines: JP Nagar 4th Phase to Kempapura (32.15 km) and Hosahalli to Kadabagere (12.5 km).
&w=3840&q=100)

Business Standard
17 minutes ago
- Business Standard
Karnataka gears up for PM Modi's visit to inaugurate development projects
Preparations are in full swing in Bengaluru ahead of Prime Minister Narendra Modi's visit on Sunday, during which he will inaugurate and lay foundation stones for several development projects. Preparations are ongoing near Ragigudda Metro Station, and Bellary Road has been decorated ahead of the event. Police personnel have been deployed at several locations to ensure security. Karnataka: Preparations underway ahead of PM Modi's visit to inaugurate development projects Read @ANI Story | #Karnataka #PMModi #Bengaluru — ANI Digital (@ani_digital) August 10, 2025 According to a statement from the Prime Minister's Office, PM Modi will flag off three Vande Bharat Express trains at KSR Railway Station in Bengaluru at around 11 am. Thereafter, he will flag off the Yellow line of Bangalore metro and undertake a metro ride from RV Road (Ragigudda) to Electronic City metro station. At around 1 pm, the Prime Minister will inaugurate and lay the foundation stone of urban connectivity projects in Bengaluru. He will also address a public function. The Prime Minister will inaugurate the Yellow line from RV Road (Ragigudda) to Bommasandra of the Bangalore Metro Phase-2 project, having a route length of over 19 km with 16 stations worth around Rs 7,160 crore. With the opening of this yellow line, the operational metro network in Bengaluru will increase to over 96 km, serving a large population in the region. The Prime Minister will also lay the foundation stone of the Bangalore Metro Phase-3 project worth over Rs 15,610 crore. The total route length of the project will be more than 44 km with 31 elevated stations. This infrastructure project will address the growing transportation needs of the city, catering to residential, industrial, commercial and educational areas. PM Modi will also flag off three Vande Bharat Express trains from Bengaluru. It includes trains from Bengaluru to Belagavi, Amritsar to Sri Mata Vaishno Devi Katra and Nagpur (Ajni) to Pune. These high-speed trains will significantly enhance regional connectivity, reduce travel time and provide a world-class travel experience to the passengers. The Bengaluru metro is currently operated and maintained by Bangalore Metro Rail Corporation Limited (BMRCL), a joint venture of the Government of India and the Government of Karnataka. (Only the headline and picture of this report may have been reworked by the Business Standard staff; the rest of the content is auto-generated from a syndicated feed.)


News18
25 minutes ago
- News18
PM Modi To Launch Metro's Yellow Line, Flag Off Three Vande Bharat Trains In Bengaluru Today
Last Updated: Prime Minister Narendra Modi is set to visit Bengaluru today to unveil a series of major transport initiatives aimed at transforming the city's connectivity Prime Minister Narendra Modi is set to visit Bengaluru today to unveil a series of major transport initiatives aimed at transforming the city's connectivity. PM Modi's itinerary includes the launch of three Vande Bharat Express trains, the inauguration of the Bengaluru Metro's Yellow Line, the groundbreaking for Phase-3 of the metro expansion, and an address to the public. 'Tomorrow, August 10, I look forward to being with the people of Bengaluru. Three Vande Bharat Express trains will be flagged off from KSR Railway Station to improve connectivity. To enhance Bengaluru city's infrastructure, the Yellow Line of Bengaluru Metro will be inaugurated. The foundation stone for the third phase of Bengaluru Metro will be laid. A public program in the city will be addressed," said PM Modi on X ahead of his visit. At 11 am, the Prime Minister is scheduled to flag off three Vande Bharat Express services from KSR Bengaluru Railway Station: the KSR Bengaluru–Belagavi route, the Shri Mata Vaishno Devi Katra–Amritsar route, and the Nagpur (Ajni)–Pune route. This will take the total count of Vande Bharat trains in India to 150. Karnataka will now have 11 such trains, while Maharashtra, Punjab, and Jammu and Kashmir will also see their high-speed rail networks expanded. Following the flag-off ceremony, PM Modi will inaugurate the 19-kilometre Yellow Line of the Bengaluru Metro, stretching from RV Road (Ragigudda) to Bommasandra. With its addition, Bengaluru's metro network will extend beyond 96 km, offering daily benefits to lakhs of commuters. The Prime Minister will also travel by metro from RV Road to Electronic City, one of the city's busiest IT hubs. Later, he will lay the foundation stone for the Rs 15,610 crore Phase-3 of the metro project, which will add more than 44 km of elevated tracks and 31 new stations. This expansion is expected to significantly bolster the city's public transport system and help reduce traffic congestion. PM Modi's visit will conclude with a public address at around 1 pm, where he is expected to highlight the government's vision for world-class transport infrastructure and improved quality of life for Bengaluru's residents. view comments First Published: August 10, 2025, 09:20 IST Disclaimer: Comments reflect users' views, not News18's. Please keep discussions respectful and constructive. Abusive, defamatory, or illegal comments will be removed. News18 may disable any comment at its discretion. By posting, you agree to our Terms of Use and Privacy Policy.