Helium One Global Ltd Announces Jackson-31 Well Drilled to TD & Free Gas Confirmed
The information contained within this announcement is deemed by the Company to constitute inside information as stipulated under the Market Abuse Regulation (EU) No. 596/2014 as amended by The Market Abuse (Amendment) (EU Exit) Regulations 2019.
Jackson-31 Well Drilled to TD and Free Gas Confirmed
LONDON, UNITED KINGDOM / / March 3, 2025 / Helium One Global (AIM:HE1), the primary helium explorer in Tanzania with a 50% working interest in the Galactica-Pegasus helium development project in Colorado, USA ("the Galactica Project"), provides an update following the Blue Star Helium (ASX: BNL, OTC:BSNLF) ("Blue Star") announcement issued today regarding the Galactica Project.
Summary
Jackson-31 well successfully drilled to total depth ("TD") of 1,210ft (368.8m) measured depth ("MD") with free gas confirmed by wireline logs
Well flowed naturally during drilling and at TD, demonstrating strong reservoir communication
The well encountered 57ft (17m) gross pay of high-quality (22-26% porosity based on petrophysics from offset wells JXSN-1,-2,-3,-4 and Sate-16), gas-saturated Upper Lyons Sandstone Formation
Samples sent to laboratory for analyses of helium and CO2 concentrations
Well head configuration being finalised ahead of surface pressure readings and rig-less flow testing
Rig now being mobilised to the Jackson-4 well location
Blue Star is pleased to announce that the Jackson-31 SENW 3054 development well at its Galactica helium project in Las Animas County, Colorado has been successfully drilled to TD.
Lorna Blaisse, Chief Executive Officer, Commented:
"It was a pleasure to be onsite with the Blue Star team for the start of this development drilling campaign. To have encountered free gas in the Upper Lyons Sandstone Formation of Jackson-31 is a very positive start indeed and we look forward to the well test results and completion as we advance towards helium production."
CEOs Lorna Blaisse (HE1) and Trent Spry (BNL) on site at Jackson-31
Jackson-31 Well Drilling and Initial Flow Test Results
The well encountered the Lyons Formation at a depth of 1,153 ft (351m) MD and was completed 57 feet (17m) into the Upper Lyons Sandstone Formation at 1,210 ft (368m) MD. No water was encountered whilst drilling the Upper Lyons Formation, as confirmed by wireline logs. Based on offset wells (JXSN-3 and Denton-B1), it is expected that the entire Upper Lyons Sandstone Formation will be gas saturated as will a significant portion of the Lower Lyons Sandstone Formation, suggesting more than 100ft of gas column above the expected gas-water contact.
This well targeted the highest quality sandstone at the top of the Upper Lyons Sandstone Formation and this appears to be well connected to the entire gas column. Petrophysics from offset wellsJXSN-1,-2,-3,-4 and Sate-16 indicate average porosity ranges 22-26% (Upper and Lower Lyons) and modelled permeabilities 300-750mD.
The Jackson-31 well flowed naturally during drilling and at TD, which has demonstrated strong reservoir communication. The well head installation is being completed ahead of surface pressure readings and flow testing.
Gas samples have been acquired and have been sent for laboratory analyses and measurement of helium and CO2 concentrations.
It is anticipated that, upon successful open hole testing at Jackson-31, the well will be completed, ready to be tied-in to production facilities.
The rig is now being mobilised to the Jackson-4 L4 3154 well location.
Galactica/Pegasus Development
The Galactica project forms part of the broader Galactica/Pegasus development, discovered by Blue Star in 2022. This large-scale project offers multiple potential product streams. Four existing discoveries at Galactica/Pegasus (JXSN-1 to JXSN-4) have delivered gas flows of 125 to 412 thousand cubic feet per day ("Mcfd") to 412 Mcfd with high helium concentrations of between 2.0% and 6.1%
Blue Star further appraised the discovery with the State-16 well which was drilled in June 2024. Independent engineering consultants advised that State-16 is capable of producing up to 441 Mcfd with more stabilised rates constrained for production optimisation, projected to be between 250 Mcfd and 350 Mcfd. The well tested 1.9% helium and logs identified 96+ feet of gas column in the Lyons Sandstone Formation.
The third-party owned Red Rocks helium project adjoins Blue Star's Galactica Project (see map below). Development of Red Rocks further supports the commercialisation of the Galactica Project.
Blue Star has been advancing engineering work on Galactica related to CO2 removal, purification and sale prior to helium processing via the IACX helium recovery unit. Engineering and market analysis continues to optimize development configurations, production forecasts, and cost estimates.
For further information please visit the Company's website:www.helium-one.com
Contact
Helium One Global LtdLorna Blaisse, CEOGraham Jacobs, Finance and Commercial Director
+44 20 7920 3150
Panmure LiberumLimited (Nominated Adviser and Joint Broker)Scott MathiesonNikhil Varghese
+44 20 3100 2000
Zeus Capital Limited (Joint Broker)Simon JohnsonLouisa Waddell
+44 20 3829 5000
Tavistock(Financial PR)Nick ElwesTara Vivian-Neal
+44 20 7920 3150
Notes to Editors
Helium One Global, the AIM-listed Tanzanian explorer, holds prospecting licences across two distinct project areas, with the potential to become a strategic player in resolving a supply-constrained helium market.
The Rukwa and Eyasi projects are located within rift basins on the margin of the Tanzanian Craton in the north and southwest of the country. These assets lie near surface seeps with helium concentrations ranging up to 10.4% helium by volume. All Helium One's licences are held on a 100% equity basis.
The Company's flagship southern Rukwa Project is located within the southern Rukwa Rift Basin covering 1,664km2 in south-west Tanzania. This project is considered to be entering an appraisal stage following the success of the 2023/24 exploration drilling campaign, which proved a helium discovery at Itumbula West-1 and, following an extended well test, successfully flowed 5.5% helium continually to surface in Q3 2024.
Following the success of the extended well test, the Company has now flowed significant quantities of helium to surface and has filed a Mining Licence application with the Mining Commission of the Tanzanian Government.
The Company also owns a 50% working interest in the Galactica-Pegasus helium development project in Las Animas County, Colorado, USA. This project is operated by Blue Star Helium Ltd (ASX: BNL).
Helium One is listed on the AIM market of the London Stock Exchange with the ticker of HE1 and on the OTCQB in the United States with the ticker HLOGF.
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
SOURCE: Helium One Global Ltd
View the original press release on ACCESS Newswire
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

Wall Street Journal
34 minutes ago
- Wall Street Journal
Europe's Exporters Feel the Chill From Trump Tariffs
Europe's exports dropped sharply in April as demand was squeezed by President Trump's tariff increases, leading to a fall in factory output that suggests economic growth has slowed after a strong start to the year. European Union exports fell by close to 10% compared with a month earlier, a dramatic reversal from the increase in March as American importers stocked up ahead of Trump's tariff announcement.
Yahoo
an hour ago
- Yahoo
Euro zone industry, trade take big hits in April amid tariff turmoil
FRANKFURT (Reuters) -Euro zone industry and trade took major hits in April, likely reflecting U.S. tariffs announcements, challenging the view of economists that the bloc is holding up well in the face of economic turmoil. Industrial production fell by 2.4% on the month in April, more than the already-weak expectations for a 1.7% fall in a Reuters poll of economists, as every segment within industry suffered a contraction, data from Eurostat showed on Friday. Trade also suffered, with the surplus of the 20 nations sharing the euro falling to just 9.9 billion euros compared with the previous month's 37.3 billion euros. The weak figures are not unexpected as U.S. firms frontloaded purchases in February and March in anticipation of the April 2 tariff announcement. But the April reversal is larger than many had anticipated, indicating downside risks to economic growth forecasts, which are already below 1% for the year. The euro zone's exports to nations outside the bloc fell by 8.2% on the month, while figures for the broader EU showed a 9.7% drop, Eurostat said. The EU's total exports to the U.S., its biggest trading partner, totalled 47.6 billion euros in the month, well down on the 71.1 billion reported a month earlier, which included the frontloading and was itself considered unusually high. The drop was mainly driven by sharply lower chemicals exports, likely relating mostly to pharmaceutical exports from Ireland, which hosts a number of international firms that are located there for tax reasons. Irish pharmaceutical exports to the U.S. surged in the months leading up to the tariffs, pushing up economic growth to exceptional levels. The figures also explain why Irish industry contracted by 15% on the month, leading euro zone production lower. The hit to industry was so large that it erased nearly all gains from the past year, and output in April was just 0.8% higher than a year earlier, with only non-durable consumer goods showing any annualised increase. Still, surveys conducted since the April turmoil indicate some modest optimism in manufacturing, suggesting that the sector is not going back into recession even if its recovery will be shallow.


Business Wire
an hour ago
- Business Wire
Tikehau Capital: Disclosure of Shares Repurchases from 06 June 2025 to 12 June 2025
PARIS--(BUSINESS WIRE)--Regulatory News: In accordance with Article 5 of EU Regulation n° 596/2014 (Market Abuse Regulation), detailed information is available on the website of Tikehau Capital (Paris:TKO): Name of the issuer Issuer Identity Code (LEI) Trading Day ISIN Aggregated volume per day (number of shares) Weighted average price per day Market (MIC Code) TIKEHAU CAPITAL 969500BY8TEU16U3SJ94 06/06/2025 FR0013230612 1,016 19.1754 XPAR TIKEHAU CAPITAL 969500BY8TEU16U3SJ94 09/06/2025 FR0013230612 463 19.1254 XPAR TIKEHAU CAPITAL 969500BY8TEU16U3SJ94 10/06/2025 FR0013230612 1,071 19.0114 XPAR TIKEHAU CAPITAL 969500BY8TEU16U3SJ94 11/06/2025 FR0013230612 892 19.0490 XPAR TIKEHAU CAPITAL 969500BY8TEU16U3SJ94 12/06/2025 FR0013230612 1,086 18.8606 XPAR TOTAL 4,528 19.0311 Expand