
Two CSE rankers from Scheduled Castes study circle
Two students of Telangana Scheduled Castes study circle (TGSCSC) achieved ranks in the Civil Services Examinations 2024, results of which were announced on April 22 (Tuesday).
Commissioner and Vice President (TGSCSC) N. Kshitija said both Gokamalla Anjaneyulu (AIR 934) and Ramtenki Sudhakar (AIR 949) are expected to get Indian Revenue Service (IRS).
In the Civil Services (Preliminary) held in June 2024, 27 students from TGSCSC had qualified for the mains examination and three of them appeared at the interview stage.
The study circle located at Banjara Hills offers 10-month residential IAS coaching for candidates hailing from poor SC, ST and BC communities. The students are enrolled based on a State-level entrance test, notified every year during May/June.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

The Hindu
11 hours ago
- The Hindu
Authorities refute tribals claim over forest land in Nagarahole Tiger Reserve
The Forest Department has refuted the claims over ancestral land by tribals from 'Attur Kolli Haadi' in Nagarahole Tiger Reserve on the grounds that no such hamlet is on official records. The issue came to the fore when about 150 tribals from nearby villages and working in local estates, asserted their rights over the land on May 5 and 6, and have refused to vacate the place pending settlement of their claims under the Forest Rights Act (FRA). Speaking to reporters, Ananya Kumar, Assistant Conservator of Forests of Nagarahole Wildlife Division, said on Saturday that around 150 tribals, including FRA applicants and other tribal leaders, 'illegally' entered the Attur Kolli forest area of Nagarahole range and constructed three sheds after clearing the vegetation. Though the Forest Department personnel tried to convince the tribals to vacate the area, they refused to do so stating that they would stay inside the forest until their forest rights are recognised. But Mr. Kumar said their claims are not supported by either historical or legal records and hence was not admissible. The Forest Department officials stated that the applications have undergone extensive scrutiny and multiple rounds of verification by the Sub-Divisional and District Level Committees (SDLC/DLC) since 2020. It has been concluded that there is no record of a tribal hamlet named 'Attur Kolli Haadi' within the Nagarahole Tiger Reserve, said Mr. Kumar. The proceedings of the subdivisional level forest rights committee meeting held on May 22, 2025, conducted by Assistant Commissioner of Madikeri, records the statements of the Forest Department that there is no record of Attur Kolli Haadi. The department provided supporting evidence that Attur Kolli forest area is a natural forest and no historical occupation, habitation, or cultivation has ever taken place in the patch of forest as claimed by applicants, Mr. Kumar said. The authorities cited the Nagarahole National Park Management Plan (2000-2010) and pointed out that it mentions the names of 43 hamlets but there was no record of the Attur Kolli Haadi. Satellite imagery from 1985 to 2025, historical management plans, and demographic surveys from the University of Mysore were also cited to claim that no habitation or cultivation has occurred in the area. Prior to that, on May 15, the SDLC meeting was held in Madikeri and officials submitted their petition with records, while the officials from the Integrated Tribal Development Project stated that there was no mention of 'Attur Kolli Haadi' in their departmental records, the authorities added. The SDLC of FRA has also deemed that the evidence presented by the claimants was insufficient to prove historical habitation and cultivation and hence has rejected the forest rights claims pertaining to Attur Kolli forest area, according to Mr. Kumar. Meanwhile, tribal leaders and NGOs supportive of the cause have sharply criticised the State's response and have accused the authorities of violating the spirit and letter of FRA. The Karnataka State Human Rights Commission, which booked a suo moto case, directed the Kodagu Deputy Commissioner to conduct an inquiry which is in process and the next hearing will be held on June 10, 2025.


NDTV
a day ago
- NDTV
UPSC Civil Services Preliminary Exam Result Expected Soon, Details Here
Quick Read Summary is AI generated, newsroom reviewed. Students can expect the result to be announced in the third week of June, 2025. The UPSC CSE Prelims 2025 was conducted on May 25 in two shifts. Candidates who clear the UPSC prelims will advance to the UPSC Mains exam. UPSC CSE Prelims Result 2025: The Union Public Service Commission (UPSC) is expected to release the result for Civil Services (Preliminary) Examination 2025 soon. Once released, candidates will be able to check their result on the official website of UPSC, While the commission is yet to make any official announcement, students can expect the result to be announced in the second week of June, 2025. UPSC CSE exam is conducted annually to recruit individuals for various civil services in the Indian government, including the Indian Administrative Service (IAS), Indian Police Service (IPS), and other important services. UPSC CSE Prelims Result 2025: How To Download Your Result? Visit the official website, On the homepage, look for the "What's New" or "Examinations" section Click on the link titled "UPSC Civil Services (Preliminary) Examination 2025 Result" A PDF file will open containing the roll numbers of qualified candidates Use Ctrl + F to search your roll number in the list Download and save the result PDF for future reference. UPSC CSE Prelims Result 2025: Exam Structure The UPSC Prelims are held in Multiple Choice Questions (MCQ) based format, carrying a total weight of 400 marks for both the examinations. For each incorrect answer, one-third (0.33) of the marks will be deducted. No marks are deducted for questions not answered. The UPSC CSE Prelims 2025 was conducted on May 25 in two shifts for General Studies Paper I and General Studies Paper II (CSAT). Candidates who clear the UPSC prelims will advance to the UPSC Mains exam which is expected to be scheduled for August 2025.


Time of India
2 days ago
- Time of India
Chandigarh pollution control committee issues notices to government bodies to curb air pollution
1 2 Chandigarh: In a first, the Chandigarh Pollution Control Committee (CPCC), to mitigate air pollution in the city, issued notices to different govt bodies, including the UT engineering department, municipal corporation, Panjab University, and Indian Railways, delineating steps to be taken to curb air pollution. CPCC gave 15 days to the different govt agencies to respond to the notices. Saurabh Kumar, member secretary, CPCC, said, "Chandigarh comes under non-attainment cities because of not meeting prescribed ambient air quality standards, especially in the winter season, and the level of pollutants of particulate matter concentration (PM2.5 & PM10) goes beyond the prescribed standards for ambient air quality. Dust pollution is one of the major sources of air pollution, contributing high levels of PM concentration, i.e. , PM10 & PM2.5." Notices were issued as the whole of the Union Territory of Chandigarh was declared an Air Pollution Control area under the Air (Prevention & Control of Pollution) Act, 1981. Under Section 17(1) of the Air Act, 1981, the Chandigarh Pollution Control Committee is to plan a comprehensive programme for the prevention, control, and abatement of air pollution and to secure execution thereof. The Committee is of the view that to tackle the problems of road dust resulting from road construction, re-modeling, repair, unpaved roads, and the open land from where soil is easily blown into the air because of traffic or winds, such activities are required to be monitored and regulated. The govt bodies like the municipal corporation and UT engineering department have been asked to take proactive steps in this direction as the owning/maintaining and road construction agencies have to play a greater role in the effective monitoring and implementation of dust control measures. Meanwhile, the Railways were issued notices as the loading and unloading area under its control in the Daria area of Chandigarh is causing a lot of air pollution in contravention of the provisions of the Air (Prevention and Control of Pollution) Act, 1981. Kumar said, "To curb air pollution, particularly during the winters, collective institutional effort is required." **BOX1: SOME OF THE MEASURES OUTLINED** **UT Engineering Department** - Shall cover the central verge with eco-friendly honeycomb paver blocks or with other aggregates. - Shall explore the possibility of washing roads at night time with tertiary treated wastewater. - Shall also explore the possibility of laying pipelines for the transportation of tertiary water on each main road and sub-road so that a mechanism can be worked out for spraying water at fixed intervals. - Shall use the by-products generated out of the Construction and Demolition Waste Processing Plant as rejects to use on the exposed soil wherever required. - Dust mitigation plan shall be incorporated in all construction projects. - Thick vegetation cover or pebbles, whichever is feasible, on vacant exposed ground. **Addition to Above for Municipal Corporation** - The municipal corporation shall purchase an adequate number of vehicles (preferably e-Vehicles) to cover the entire city to sprinkle water during the morning hours on the roads before manual sweeping. - Shall work out the mechanism for proper collection of fallen leaves and their disposal as it further leads to air pollution. **Railways** - To make arrangements to sweep the entire jurisdiction of the railway, including the loading and unloading area, and shall identify potential dust hotspots and make arrangements for spraying water in all such areas to suppress the dust. - To provide provisions for the washing of wheels of the vehicles entering and exiting from the loading/unloading/weighing area. - To take measures to ensure that there should be no exposed ground in railway premises and cover the exposed soil either with thick vegetation or pebbles, whichever is feasible. - To cover all the loading and unloading areas, including the roads and weighing bridge area, with eco-friendly honeycomb paver blocks or any other suitable material to restrict dust suspension. **BOX2: WINTER AIR POLLUTION** In the past few years, the Chandigarh winters witnessed severe air pollution. At one point in November last year, it was reported to have the worst air quality in the country. On several occasions in the last couple of years, it was among the top three worst air-polluted cities in the country. On average, though, spanning the year-long period, the air quality hovers around moderate air quality. MSID:: 121653902 413 |