
Abu Dhabi's EWEC seeks bids for 140MW Al Sila Wind project to boost UAE renewable energy capacity
Emirates Water and Electricity Company (EWEC), announced issuing 'Requests for Proposals (RFPs) to qualified companies for the development of the Al Sila Wind Independent Power Project (IPP).
The bid for the project, in close proximity to the existing utility-scale wind farm in Al Sila, will involve the development, financing, construction, operation, maintenance and ownership of the wind farm and associated infrastructure.
The RFP is being issued to 16 companies and consortiums who qualified for the RFP stage after submitting 'Statements of Qualification', following the Expression of Interest (EOI) stage in October 2024.
The RFP provides detailed requirements and proposed technical parameters for the project to support companies and consortiums in developing their submissions.
The successful developer or developer consortium will own up to 40 per cent of the entity, while the remaining equity will be held indirectly by the Abu Dhabi Government.
The developer will enter into a long-term Power Purchase Agreement (PPA) with EWEC, the single buyer of power and water capacity and output in the Emirate of Abu Dhabi.
The PPA will be structured as an energy purchase agreement whereby EWEC will pay only for the net electrical energy supplied by the plant.
The deadline for submitting responses to the RFP is by Q2 2025.
Once fully operational, Al Sila Wind will generate up to 140 megawatts (MW) AC of renewable energy, providing enough generation capacity to power 36,000 homes, and displace 190,000 tonnes of carbon dioxide annually.
The project builds on Abu Dhabi's existing wind farms located at Sila, Sir Bani Yas Island and Delma Island, and will increase Abu Dhabi's wind generation capacity to approximately 240MW.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Gulf Today
2 days ago
- Gulf Today
DEWA adds 800MW of clean energy production capacity to its energy mix in 2025
Saeed Mohammed Al Tayer, MD & CEO of Dubai Electricity and Water Authority (DEWA), announced that the total production capacity of the Mohammed Bin Rashid Al Maktoum Solar Park has increased to 3,860 megawatts (MW), using photovoltaic (PV) solar panels and concentrated solar power (CSP) technologies. Since the beginning of this year, DEWA has added 800MW from the sixth phase of the solar park, bringing clean energy's share to approximately 21.5% of its total production capacity. 'Our strategies and action plans are inspired by the vision and directives of His Highness Sheikh Mohammed Bin Rashid Al Maktoum, Vice President, Prime Minister, and Ruler of Dubai, to accelerate the transition towards a sustainable green economy and enhance Dubai's position as a leading global hub for clean and renewable energy. The Mohammed Bin Rashid Al Maktoum Solar Park is our key project to realise this vision and achieve the Dubai Clean Energy Strategy 2050 and the Dubai Net Zero Carbon Emissions Strategy 2050, which aim to provide 100% of the emirate's energy production capacity from clean sources by 2050. By 2030, the solar park's production capacity will reach 7,260MW, with clean energy making up 34% of DEWA's energy mix. This will reduce approximately eight million tonnes of carbon emissions annually,' said Al Tayer. The first phase of the Mohammed Bin Rashid Al Maktoum Solar Park, with a capacity of 13MW using PV solar panels, was commissioned in October 2013. In March 2017, the second phase, with a capacity of 200MW, was inaugurated. It also uses PV technology and was the first solar energy project of its kind in the region based on the independent power producer (IPP) model. In November 2020, the third phase of the solar park was inaugurated with a capacity of 800MW. This phase, also using PV technology, was the first in the Middle East and North Africa to use single-axis solar tracking to enhance energy generation. In December 2023, the fourth phase of the solar park was inaugurated with a total capacity of 950MW, combining CSP and PV panels. It uses three hybrid technologies to produce clean energy: 600MW from a parabolic basin complex, 100MW from a solar power tower and 250MW from PV solar panels. In June 2023, the fifth phase, with a capacity of 900MW, was inaugurated using photovoltaic panels. DEWA is currently working to complete the sixth phase of the solar park, with a capacity of 1,800MW using PV panels. DEWA has invited international developers to participate in the implementation of the seventh phase of the Mohammed Bin Rashid Al Maktoum Solar Park, which will have a capacity of 1,600MW. This phase, which is expandable to 2,000MW, will utilise PV solar panels and a battery energy storage system with a capacity of 1,000MW for six hours, providing a total storage capacity of 6,000 megawatt-hours. This will make it one of the world's largest solar-plus-storage projects. The phase will be implemented under the IPP model. WAM


Hi Dubai
2 days ago
- Hi Dubai
DEWA Expands Mohammed bin Rashid Solar Park Capacity to 3,860MW
Dubai Electricity and Water Authority (DEWA) has ramped up the total production capacity of the Mohammed bin Rashid Al Maktoum Solar Park to 3,860 megawatts (MW), marking a major step forward in the emirate's clean energy transition. Announced by Saeed Mohammed Al Tayer, MD & CEO of DEWA, the increase includes 800MW added this year from the park's sixth phase. Clean energy now accounts for roughly 21.5% of DEWA's total production capacity. Al Tayer said the expansion supports Dubai's long-term strategies to reach net-zero carbon emissions by 2050. 'The Mohammed bin Rashid Al Maktoum Solar Park is our key project to realise this vision and achieve the Dubai Clean Energy Strategy 2050 and the Dubai Net Zero Carbon Emissions Strategy 2050,' he stated. Launched in 2013 with a modest 13MW capacity, the solar park has grown through multiple phases using photovoltaic (PV) and concentrated solar power (CSP) technologies. Notably, the fourth phase introduced hybrid solar systems, while the fifth and sixth phases continued expanding PV output. DEWA plans to raise the park's capacity to 7,260MW by 2030, which would supply 34% of the utility's total energy mix from clean sources. This transition is expected to cut carbon emissions by around eight million tonnes annually. Looking ahead, DEWA has invited global developers to participate in the seventh phase of the solar park. Set to feature a 1,600MW PV system and a 1,000MW battery storage system, the project will be one of the world's largest solar-plus-storage initiatives. The solar park is implemented under the Independent Power Producer (IPP) model, reinforcing Dubai's position as a regional leader in renewable energy innovation. News Source: Emirates News Agency


Web Release
2 days ago
- Web Release
Solana Partners with VARA to Accelerate Crypto Growth in Dubai
In a significant development for the blockchain sector, the Solana Foundation has entered into an official partnership with Dubai's Virtual Assets Regulatory Authority (VARA). On 2 June, both parties signed a Memorandum of Understanding (MoU), committing to foster a more integrated and robust cryptocurrency community in Dubai and beyond. The collaboration is expected to promote innovation, support skilled professionals, and enhance the regulation and success of virtual assets. Solana and Dubai Collaborate to Create Blockchain Startup Zone This partnership outlines concrete objectives and key areas of collaboration. These include initiatives focused on talent development, industry data sharing, and hosting workshops tailored for cryptocurrency project founders. As part of the agreement, the IDO will assist the Solana Foundation in establishing a dedicated 'Solana Economic Zone' in Dubai, which will serve as a hub for Solana-affiliated startups, developers, and entrepreneurs. Cryptocurrency remains a core focus of Dubai's forward-thinking initiatives. The city, already recognised globally as a leading digital asset hub, benefits from Solana's alignment with VARA. This collaboration strengthens Dubai's position by connecting international blockchain professionals with the emirate's regulatory framework, promoting both innovation and security.