Liberals believe the government will impose a gag order on Quebec energy bill
Everything suggests that the government will force the adoption of Bill 69 on energy by gag order, says the Quebec Liberal Party (PLQ).
The parliamentary session ends on Friday.
'With François Legault, gagging equals sloppiness, and we denounce it,' said interim Liberal leader Marc Tanguay at a news conference Monday morning in Montreal.
Liberal MNA Monsef Derraji accused the government of dragging its feet on Bill 69.
'As of today, we have lost 250 hours of detailed study. (...) This shows you how unprepared this government was to have a meaningful discussion about Quebec's energy future, and unfortunately, we are witnessing the politicization of energy rates by François Legault,' he said alongside his leader.
Tanguay also criticized the bill.
'François Legault has decided to pass on the bill of 15 per cent and more over the last three years to our SMEs and businesses. In that sense, it's a bad bill,' he said.
The Parti Québécois (PQ) also believes that the government will use gag orders and reiterates its request that the bill be withdrawn 'so that the minister can go back and do her homework.'
'The CAQ government has achieved a remarkable feat: it has managed to unite everyone against it. Neither civil society organizations, SMEs nor industries agree with the pile of amendments it tabled at the last minute. The CAQ government, which itself does not seem to understand the impact of these amendments, is creating even more confusion in a bill that was already a hodgepodge,' said PQ MNA Pascal Paradis in a written statement sent to The Canadian Press.
Two weeks ago, Minister of Economy, Innovation and Energy Christine Fréchette tabled 52 amendments to modify the legislative text.
'We are calling on the opposition to study the bill'
Last week, Fréchette refused to commit to not passing her bill under closure.
Her office told The Canadian Press that the bill had been studied for more than 100 hours, that there had been four briefings for the opposition parties, and that the amendments had been provided in advance.
'We are not using closure. We are calling on the opposition to study the bill,' the minister's communications director, Maxime Roy, said in a text message on Monday.
A laborious process
Introduced in June 2024, Bill 69 aims to give Hydro-Québec free rein to increase its electricity production.
It was introduced by former super-minister Pierre Fitzgibbon before he resigned in September 2024. Fréchette took over, but the legislative process for the bill has been arduous.
In December 2024, Fréchette cited Donald Trump and his threats of tariffs to justify the delays in moving the bill forward.
Last February, it was the turn of the official Liberal opposition to delay consideration of the bill, also citing the American president.
This report by The Canadian Press was first published in French on June 2, 2025.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CTV News
18 minutes ago
- CTV News
Elizabeth May won't lead Green Party in next federal election
Green Party co-Leader Elizabeth May thanks all who supported her and her campaign after being re-elected while at the Church and State Winery in Brentwood Bay, B.C., Monday, April 28, 2025. THE CANADIAN PRESS/Chad Hipolito OTTAWA — Green Party Leader Elizabeth May says she won't lead the party into the next election. In an email to members, May says she intends to stay on as an MP and as party leader until a new leader is elected. May says she wants to grow the party's parliamentary caucus before stepping down, while focusing on the climate crisis, affordability and justice and peace in conflict-ridden areas. She says members will soon receive details about a leadership review and how to participate in a vote. May says she plans to step down once the new leader, or co-leaders, are elected. May is the lone Green MP in the House of Commons after the party secured only one seat in the federal election. This report by The Canadian Press was first published Aug. 19, 2025. Catherine Morrison, The Canadian Press


CTV News
18 minutes ago
- CTV News
N.B. industry to resume some operations on crown land
Some businesses will be permitted to re-enter New Brunswick's Crown lands to resume operations under strict conditions. Earlier this month the government implemented a burn ban for the entire province and closed all Crown lands. As of Tuesday afternoon, there are 28 active wildfires burning in the province, five of which are deemed out of control. Each business will now require a permit to operate, and must follow all rules regarding location of work, operating hours and conditions, as well as enhance fire safety measures. One example provided by the province in a news release says tree cutting will only be allowed between the hours of 8 p.m. and 10 a.m. No activity will be allowed in any active fire zone. 'While our top priority continues to be safety, we recognize the need to support the return of operations by industry on Crown lands,' said Natural Resources Minister John Herron in the news release. 'Many New Brunswick businesses rely on our Crown forests. These firms employ many New Brunswickers. We have struck the right balance between assisting these companies and protecting our forests. Starting today, specific industry activities – with appropriate conditions to mitigate fire and safety risks – will be permitted to operate. This will ensure certain industries will not face a full shutdown.' While industry will resume some operations, restrictions on all other activities remain on Crown lands. That includes all recreational activities such as campfires and the use of all-terrain vehicles. Speaking to reporters Monday, Herron said roughly 2,500 hectares of land have been lost, or are at risk, which translates to about $4 million in royalty revenue. He said timber would represent about $10.5 million in direct and indirect tax revenue to the government from the forest sector value chain. 'That timber would represent roughly $42.5 million in lumber revenue to sawmills and overall, from a GDP perspective, it would be about $77.5 million,' said Herron, noting those figures are on the higher end as they assume every hectare is comprised of merchantable wood. The news to resume activities is welcomed by woodlot owners in the province. President of the New Brunswick Federation of Woodlot Owners Rick Doucett says the past few weeks have been very challenging for the forestry sector. 'We just sort of got up off the floor from a punch in the face with the new anti-dumping fees,' says Doucett. 'And we got punched in the face again with our weather conditions that are making things that are inoperable for us.' 'Basically we live in a world where no production, no pay, and there's no provision to try to help people bridge that gap.' He notes some private woodlots owners did sustain damage to their property from recent fires in the province. With the allowed resumption of work in the woods, woodlot owners will once again be able to supply mills with timber. Some mills in the province were running low on wood according to Herron. While the shutdown was challenging, Doucett says those who own woodlots understand and support the decision for a brief halt of operations. 'I own 500 acres of woodland in this province, and it's not insured,' he notes. 'That's like having your bank account out there and then having somebody set it on fire. So, it's a big financial risk to woodland owners to have anything happen and there are no provisions for forest fires.' Once the fires fizzle out in the province, Doucett would like to see the province reevaluate its forest plan. He says the last time the plan was looked at was back in 2014. With files from CTV's Andrea Jerrett. For more New Brunswick news, visit our dedicated provincial page.


CTV News
18 minutes ago
- CTV News
Goh Ballet Academy proposes 25-storey student accommodation tower for Vancouver
Goh Ballet have proposed a new 25-storey tower to the City of Vancouver. (Courtesy: Goh Ballet Academy rezoning application) Vancouver's prestigious Goh Ballet Academy might soon have an even more prominent presence on Vancouver's urban landscape and arts and culture scene, if a request for expansion is given the green light. The arts organization has submitted a rezoning application to the City of Vancouver for a 25-storey, mixed-use highrise building that will expand upon its current site at 2345 Main Street. The current building has been occupied by the dance company since 1985. 'As Goh Ballet looks to the future, it is clear that its current home requires redevelopment, not only to grow but also to stay in place,' Goh Ballet says in the application. Goh Ballet proposes building expansion in Vancouver The building will expand on Goh Ballet's current Main Street location. (Courtesy: Goh Ballet Academy rezoning application) The expansion will allow the academy to essentially double its operations, raising the number of students it would be capable of serving annually from 450 to 890, and increasing the number of performances it can host at the site. The vast majority of those students, 85 per cent, are from Canada, with most of those from the Vancouver area. Chan Hon Goh, general and artistic director of the Goh Ballet, says the intake of international students averages between 20 to 30 students a year. The amount of international and out of town students that enroll typically depends on what accommodation opportunities are available, with students often battling it out for rental properties or already minimally available homestays, he says. 'Cities along the west coast of North America and Vancouver, in particular, suffer from an acute shortage of student housing that has broader implications for their housing markets,' says Hon Goh. 'In Vancouver, there is currently no dance academy offering accredited vocational studies that also provides residences for students. Goh Ballet will be the first, though most other major Canadian cities - Montreal, Toronto, Winnipeg, Calgary - already have this.' Goh Ballet proposes building expansion in Vancouver The upgrade will preserve heritage elements of the building alongside incorporating contemporary design and seismic upgrades. (Courtesy: Goh Ballet Academy rezoning application) According to the application, the proposed student housing will be entirely rental, available at market rates to students, staff, and faculty, for the duration of their studies. Alongside over 300 units of student housing, the building will also include a fitness centre, amenity lounge, an outdoor rooftop terrace and street level retail, alongside additional dance rehearsal studios and performance spaces. The arts organization promises to conserve the building's historic facades, specifically the decorative pilasters and the matte, terracotta panels that have fronted both Main Street and East 8th Avenue since the building was first built, as a branch of the Royal Bank of Canada in 1912. The new tower, however, has been designed to 'clearly distinguish itself' from the restored heritage facade that will sit below it, the application says. Led by Align Architecture, the building will incorporate elements of Chinese design that pay homage to the faculty's founders, principal dancers with the National Ballet of China, Choo Chiat Goh and Lin Yee Goh. Circular portal windows and moongate door entries, also inspired by the soft movements of ballet, will feature alongside local artworks in the form of two, large scale murals. 'Because the design integrates the existing heritage building at grade that has already been part of its neighbourhood for many years, the project effortlessly blends with the current and future condition of Mount Pleasant,' says Hon Goh. 'The design further incorporates murals as a way of building on Mount Pleasant's tradition of transforming blank walls into vibrant public art, contributing to the neighbourhood's established mural culture.' Located approximately 100 metres from the planned Mount Pleasant SkyTrain station, expected to open late 2027 after a push back last year, the proposed building will fall within the city's Broadway Plan. While its expected height of 223 feet is greater than the limit permitted in the plan, the proposal is in keeping with it as far as everything else is concerned, the academy assures in the application. It notes how the redevelopment of the building will aid in the retention and growth of the arts and culture sector, will address housing concerns, provide heritage value, and will provide jobs. 'Goh Ballet has been an important cultural institution in Vancouver for almost 50 years and this redevelopment will help us continue to contribute to arts and culture and education in our city for many more years,' says Hon Goh.