
Kiru hydropower corruption case: CBI files chargesheet against former J&K governor Satya Pal Malik
NEW DELHI: The Central Bureau of Investigation (CBI) on Thursday filed the chargesheet against former Jammu and Kashmir governor
Satya Pal Malik
and five others in connection with the
Kiru hydropower corruption case
, PTI reported quoting officials.
In 2024, the CBI had carried out searches at eight locations across Delhi and Jammu as part of a probe into alleged corruption involving the awarding of civil contracts worth Rs 2,200 crore for the Kiru Hydro Electric Power Project.
The investigation stems from a request made by the Jammu and Kashmir government in 2022, seeking a CBI inquiry into suspected irregularities in the awarding of two major contracts. These concerns were initially raised by Satya Pal Malik, who served as the governor of J&K from August 23, 2018, to October 30, 2019. Malik had publicly alleged that he was offered a Rs 300 crore bribe to approve two files, one of which related to the Kiru project.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
29 minutes ago
- Time of India
Over 6k fined for travelling without ticket
1 2 Patna: Samastipur division of the East Central Railway (ECR) on Wednesday conducted a massive ticket-checking drive, detaining a total of 6,383 passengers travelling without valid tickets across key stations. The drive resulted in a collection of Rs 52.47 lakh as fine from them, said Samastipur divisional railway manager (DRM) Vinay Srivastava. According to Srivastava, a total of 218 ticket-checking staff were deployed as part of the intensified drive, which aimed to ensure a smoother journey for passengers, especially travelling in reserved coaches of long-distance mail and express trains. "The campaign, led under the directive of the ECR headquarters in Hajipur, was described as one of the most comprehensive ticket-checking efforts in the recent years in the division," he said, adding that the drive was carried out from 6am to 9pm at Samastipur, Bapudham Motihari, Narkatiaganj, Saharsa, Banmankhi, Jaynagar, Raxaul, Darbhanga, Purnia Court, Supaul and Saraigarh stations.


India.com
30 minutes ago
- India.com
World's most expensive project is worth Rs...., it is not Dubai's Burj Khalifa, the project is...
World's most expensive project is worth Rs...., it is not Dubai's Burj Khalifa, the project is... From connecting biggest rivers to constructing modern Silk Route to setting up international space station – there are projects whose estimated cost take breath away from you. With an aim to connect some of the biggest rivers of the country and to curtail floods and droughts., Prime Minister Narendra Modi had begun ambitious plan to connect some of the biggest rivers of the country. The cost was pegged at $87 billion or Rs 8,700 crores. Belt and Road Initiative (BRI) aka One Belt One Road (OBOR) in China is estimated to be $900 billion or Rs 77,19,300 crores. It is Chinese President Xi Jinping's grand dream of a modern Silk Route. The plan, announced in 2013, aims to link several Asian countries and even parts of Europe with roads, railway and waterways. The idea is to facilitate free trade so that all countries benefit. International Space Station is being planned to be built at a cost of $150 billion or Rs 12,86,550 crores. It basically making a home for the scientists in the space. Scientists live there for months conducting research, experiments and increasingly, enjoying mundane earthly joys such as watching World Cup football. Bathroom facilities are still not great, though. When Peggy Whitson, who returned to earth recently after a record-breaking 665 days (not consecutive), said the two things she most missed were pizza and flush toilets. The project was launched in 1998. London Crossrail Project aka Elizabeth Line in United Kingdom at a cost of $23 billion. London is expanding its underground t rain system. New tunnels and tracks, which together are 73 miles long, have been built to connect 40 stations. The work started in 2012 and is proceeding smoothly, for the most part. The project was named after Queen Elizabeth in 2016. The California High-speed Rail is a train network in California, which will link San Francisco to the Los Angeles basin. The 560 km trip — which takes close to six hours by road — will be done in a less than three hours on the proposed high-speed train. The cost is pegged at $70 billion and is expected to end by 2029.


Time of India
35 minutes ago
- Time of India
Lokpal seeks CBI, ED officers to join its inquiry wing
The Lokpal has sought applications from officers with experience in working with the Central Bureau of Investigation (CBI) and Enforcement Directorate (ED) to join its inquiry wing on deputation. The applications have been invited for filling up of various posts i.e., deputy director (DD)/superintendent of police (SP), inquiry/investigation officer, assistant inquiry/investigation officer and personal assistant in the inquiry wing of Lokpal of India on a deputation basis, according to an official circular. The Lokpal and Lokayuktas Act, 2013, came into force on January 1, 2014, when it received the assent of the President. However, it began functioning only on March 27, 2019, following the appointment of its chairperson and members. To discharge its statutory functions, Section 11 of the Act obligates the Lokpal to constitute an inquiry wing to conduct a preliminary inquiry into any offence punishable under the Prevention of Corruption Act , 1988, alleged to have been committed by the public servants and functionaries. On August 30, 2024, a full bench of Lokpal met and decided to constitute such an inquiry wing. Live Events It has sought applications for posts of DD/SP, four posts each of inquiry/investigation officer and assistant inquiry/investigation officer, and two posts of personal assistant. Officers of different central government services, CBI, ED, Narcotics Control Bureau (NCB), Serious Fraud Investigation Office (SFIO) and those belonging to state or Union Territory police bodies are eligible to apply, said the vacancy circular dated June 10. It said officers with experience in conducting investigation in general/economic & banking/cyber matters are desirable. The pay & allowances, HRA, transport allowance, joining time, travelling allowances & transfer TA, children education allowance, LTC, dearness allowance, medical facilities, leave and the other terms & conditions of the officers selected for appointment on deputation basis will be governed by the extant guidelines/rules as admissible to the central government employees, till the time the Lokpal Officers and Staff (Conditions of Service) Regulations, 2024 are notified, the circular said. The DD and SP will be provided the facility of pick and drop from residence to office and vice versa, and other staff members can avail the facility of pick and drop between office and the nearest metro station/bus stand, it added. The last date for receiving applications is 60 days from the date of issuance of the vacancy circular. Economic Times WhatsApp channel )