
HC orders authority to issue NOC for Aussie couple to take adopted son home
New Delhi:
Delhi High Court
recently came to the rescue of an Australia-based couple who were not allowed to take their adopted son back to the country for over four years due to the inaction of Central Adoption Resource Authority (CARA).
A single-judge bench of Justice Sachin Datta on May 30 observed that the adoption deed was executed in 2020 and directed CARA to immediately issue a no-objection certificate enabling the couple to take the child with them. The bench said the adoption was concluded in accordance with the law and there was no reason for CARA not to grant the NOC.
CARA objected to the registration of the adoption deed by the adoptive father's mother, on the basis of a general power of attorney.
It contended that a GPA was not a legally valid instrument under Queensland Powers of Attorney Act 1998 for the purpose of adoption. It stated that in cases where children adopted under Hindu Adoptions and Maintenance Act (HAMA) are sought to be relocated abroad by the adoptive parents, Adoption Regulations 2022 required necessary documentation/certification from the authority concerned of the receiving country as contemplated under Hague Convention 1993.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
Värmepump inkl. installation
Värmepump.se
Få erbjudande
Undo
You Can Also Check:
Delhi AQI
|
Weather in Delhi
|
Bank Holidays in Delhi
|
Public Holidays in Delhi
Referring to a Supreme Court verdict in which CARA was directed to issue an NOC to expedite the process for the inter-country adoption of two children by a 49-year-old single Indian woman residing in the UK, the judge observed that Article 37 of Hague Convention itself implied that concluded adoptions under HAMA were required to comply with the requirements set out in the Act itself and couldn't be retrospectively subject to any other extraneous requirement or precondition.
The court also noted that the Australian authorities concerned had issued a communication seeking a CARA support letter to validate the adoption for inter-country movement. "Admittedly, requisite certificates have also already been issued by the district magistrate (Bathinda, Punjab). There is no ground for withholding the grant of a support letter/NOC by CARA," it noted.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
2 hours ago
- Time of India
Satpula Lake Gets New Lease Of Life
New Delhi: Satpula Lake, a 700-year-old waterbody in south Delhi, which remained highly polluted and drew the National Green Tribunal 's (NGT) attention after TOI raised the issue of pollution in it, has finally got a new life. The lake, virtually dead for years, was revived under an initiative by Rotary Club of Delhi, South Central. The lake, which had long dried up due to urban sprawl and neglect, now glistens with fresh, treated water, signalling the powerful impact of civic action and sustainable innovation. You Can Also Check: Delhi AQI | Weather in Delhi | Bank Holidays in Delhi | Public Holidays in Delhi Stressing its historic importance, the officials at Rotary said that the transformation was not just about the water but also "about reclaiming our heritage, healing our environment, and inspiring communities." The lake was revived by Rotary in partnership with the Indian National Trust for Art and Cultural Heritage (Intach) after an NOC was granted by DDA, enabling the project to proceed. Ashok Kantoor, district governor (2022-23), and NK Lamba, Rotary district chair for water, said that the lake was revived as it "deserved a second chance, and Rotary was determined to make it happen." "For decades, the Satpula Lake, once fed by rainwater flowing from the nearby Jahanpanah forest, lay dry, its source cut off by roads and construction. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 40세 넘고 PC만 있으면? 이 게임 완전 내 거임! Hero Wars 플레이하기 Undo Today, thanks to the installation of an eco-engineered Aranya Dwip system, drain water is filtered and biologically treated before being channelled into the lake. This not only replenishes the water body but ensures it stays alive all year round. What was once barren land has been reshaped into a serene, vibrant ecosystem where birds chirp, aquatic plants thrive, and heritage whispers through rippling waters," a statement from Rotary said. It stated that a 200 KLD Aranya Dwip remediation system now treats wastewater through a multi-layered sequence of filtration, bioremediation, constructed wetlands and natural aeration. "This is proof that low-cost, low-energy solutions can transform urban decay into ecological gold. Satpula Lake is just the beginning," Lamba said. "Satpula, meaning seven bridges, was built during the reign of Sultan Muhammad bin Tughlaq. It functioned as both a water reservoir and part of the city's medieval defence structure," Rotary said. According to Manu Bhatnagar, director of Intach, the 14th century lake was a dry and dead area, and the only source of water was an adjacent drain. The water table was 60 feet deep, and the bed extremely porous. "Water was picked from the drain and treated using a settling system and then using Aranya Dwip, which is based on microbial culture, and also using a constructed wetland that uses grasses like Typha. Gradually, the lake formed although the bed was extremely porous and the water table was 60 m below the surface. Now the water quality has recently been tested as showing a BOD level of around 12 mg/l and DO level of 5.5 mg/l. To ensure the water quality is good, further measures such as the introduction of fish was done, including Indian Carps and Garai. These were introduced when they were fingerlings, and now they have grown up to 16-17 inches. We weighed one fish at 3.4 kg," Bhatnagar said. He added that several birds like spot-billed duck, water hens, grebes, kingfisher and pond egrets have also been seen. "Now we are ready for the rain, and having surfaced the aquifer, we are hoping to spread from 6,500 sqm to 8,000 sqm. Beyond this, there is an overflow arrangement that will take excess water to the drain," said Bhatnagar.


Time of India
2 hours ago
- Time of India
CBSE's 2-exam plan ‘rooted in compassion': Principals
Mumbai: From 2026, CBSE class 10 students will sit not for one board exam, but two sets of board exams, if they choose to. The first, in February, will cover all subjects and will be compulsory. The second, in May, will offer students the option to reappear for up to three papers to improve their scores. For many, it's a quiet revolution. A policy rooted in empathy, said school heads, and one that allows students to breathe—perhaps for the first time in board season. "This is a policy that gives students dignity and space," says Avnita Bir, director-principal of RN Podar School. "It reduces the stress of a make-or-break exam and offers flexibility of a second chance. But let's not ignore logistical hurdles—it will be challenging to conduct and evaluate two exams back-to-back..." You Can Also Check: Mumbai AQI | Weather in Mumbai | Bank Holidays in Mumbai | Public Holidays in Mumbai Overall, the move has found support among educators. Educationist Francis Joseph calls it a "well-being" move. "This kind of flexibility was needed yesterday. We must allow our children to experience assessment with less fear and more fairness. I hope state and national boards take note. But I urge parents, especially, to avoid turning both attempts into battlegrounds. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo Let this be a cushion, not a crucible." Anjali Bowen, principal of Ryan International School, Kandivli, said: "This change acknowledges what we've always known — that stress erodes learning. By allowing students to retake exams, CBSE is not diluting the rigour—it's deepening the compassion. It gives students more than one moment to shine." As educators, she added, "we were aware of this potential shift, and now that it's officially being implemented, our school and teachers are actively working on integrating this new structure into our academic planning. .." But on ground, teachers already anticipate the ripple effects. A Powai-based teacher said, "We are yet to understand how students will navigate the academic calendar between the two phases. We're waiting for the standard operating procedures to see how feasible it really is." Others said the model isn't entirely new. "It's like old wine in a new bottle," said a principal. "Earlier, students who failed could reappear a few months later. Now, the language has changed—we've taken away the word 'compartment', which carried shame, and replaced it with choice. That matters."


Time of India
2 hours ago
- Time of India
Barapullah Elevated Rd May Open By Dec
New Delhi: With the central empowered committee (CEC) having conducted an inspection recently, Public Works Department minister Parvesh Verma on Wednesday said the remaining civil work of phase III of the Barapullah elevated road project may start soon and the corridor might be opened by Dec. In making for 10 years now, the project was initially stuck due to two land parcels on the Yamuna floodplain that govt had to acquire from private individuals. Officials said there was a final hurdle in the form of 274 trees that fell in the way of the 3.5km elevated road between Sarai Kale Khan on the west of the Yamuna and Mayur Vihar on its east. The permission to fell the trees has been pending with the forest department for over two years now. Verma said the Supreme Court-appointed CEC inspected the project and the trees on June 21. The hearing of the committee is scheduled to take place on June 27 when PWD is hopeful of getting the permission to cut and translocate the trees. You Can Also Check: Delhi AQI | Weather in Delhi | Bank Holidays in Delhi | Public Holidays in Delhi "Once we get the permission, the remaining portion of the elevated road will be built within five months or so. We hope to complete it and open for traffic by Dec this year," Verma said, adding that 690-metre stretches — one measuring 400 metres and another 290 metres — currently remain unbuilt. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Free P2,000 GCash eGift UnionBank Credit Card Apply Now Undo The work on the 3.5km-long road, which promised to cut the driving time between east and south Delhi to just 20 minutes, started in 2015. It was initially planned to be built in 30 months, but missed several deadlines due to two small land parcels of 709.9 and 459.2 square metres that took years to be acquired to allow the construction on the 690 metres of the missing link. It was in July last year that the revenue department of Delhi govt announced a land acquisition award to take over 1,169 square metres of land in Nangli Razapur village, paving the way for the construction. However, govt then realised that there was yet another hurdle to be cleared before the construction can begin—felling and transplantation of 274 fully grown trees. While the project was initially estimated to cost Rs 964 crore, it has now reached Rs 1,330 crore. Verma blamed the previous govt for the cost and time escalation of the project. "Delhi paid the price—in both time and taxpayers' money," he said.