logo
Oman's OQAE plans green hydrogen pilot in Duqm

Oman's OQAE plans green hydrogen pilot in Duqm

Observer13-05-2025
MUSCAT: OQ Alternative Energy (OQAE), a subsidiary of OQ Group, is developing a pilot-scale green hydrogen project designed to equip the company with practical experience essential to fulfilling its role as Oman's National Champion for Alternative Energy.
The state-owned entity said the pilot, featuring an electrolyser capacity of 10 – 15 MW, is proposed to be established in the Special Economic Zone at Duqm (SEZAD).
'This initiative will provide hands-on experience in executing and operating green hydrogen projects, testing real-world applications, and generating insights for future large-scale hydrogen developments,' OQAE revealed in the newly published 2024 Sustainability Report of parent holding company OQ Group.
The announcement comes as OQAE presses ahead with the delivery of a substantive pipeline of green hydrogen projects, renewable solar and wind energy schemes, and a plethora of other clean energy initiatives entailing several billions of dollars in investments over the coming years.
On Monday, May 12, 2025, the company signed pacts to progress, finance and collaborate on an array of renewable and clean energy initiatives involving investments totalling around $2 billion. The list includes the 100 MW North Solar plant in Saih Nihaydah in northern Oman, and two 100 MW wind farms—Riyah-1 and Riyah-2—located in the Amin and West Nimr fields in the south; a 700 MW renewable energy project to power United Solar's polysilicon plant in Suhar, a 500 MW renewables scheme for Jindal; a 140MW renewable energy project with Oxy Zero in Block 9, and a 105 MW renewable energy project with Vale. They are part of a renewable energy pipeline of up to 7 GW across Oman.
Furthermore, OQAE has secured a commitment from Nama Power and Water Procurement Company (Nama PWP), the sole procurer and offtaker of electricity generation and desalinated water capacity, to obtain up to a 25 per cent stake in future Independent Power Projects (IPPs).
'This has significantly expanded OQAE's customer base, which now includes oil and gas operators, industrial clients, and direct power demand through NPWP projects,' parent company OQ Group noted in its Sustainability Report.
Importantly, OQAE is positioned to play a leading role in the delivery of Oman's long-term green hydrogen strategy. The company continues to work with key stakeholders in advancing three large-scale green hydrogen schemes, which will account for a significant share of the country's target to produce at least 1 million tonnes per annum of green hydrogen molecules by 2030.
Key projects backed by OQAE thus far are: HYPORT Duqm, a joint venture with DEME & BP featuring 1.3 GW of renewable capacity in SEZAD; Green Energy Oman (GEO), a collaboration with InterContinental Energy, Enertech Holding Company, and Shell to supply approximately 4 GW of green power, with proposed downstream and export facilities in the SEZ at Duqm; and SalalaH2, a joint venture with Marubeni, Samsung C&T, and Dutco, bringing 3.8 GW of renewable energy capacity to Dhofar.
'Beyond production, OQAE is also diversifying market opportunities by exploring alternative vectors and downstream applications to drive demand. This includes positioning Oman as a global hub for low-carbon bunkering, piloting e-fuel projects such as e-Gasoline and e-SAF, leveraging biogenic CO2 for e-Methanol, and developing an e-NG facility utilising green hydrogen and CO2 through methanation,' the company added in the report.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

bp Oman appoints Najla al Jamali as president
bp Oman appoints Najla al Jamali as president

Muscat Daily

time4 days ago

  • Muscat Daily

bp Oman appoints Najla al Jamali as president

Muscat – Global energy giantbp announced that Najla Zuhair al Jamali has been appointed as President of bp Oman. She joins bp from OQ where she served as Chief Executive of OQ Alternative Energy. Najla started her global career as a reservoir engineer in Oman and brings over two decades of energy sector experience to bp. Her career spans upstream, downstream and commercial roles across companies including Shell, Schlumberger and Takamul Investment Company (as subsidiary of what was Oman Oil Company). Najla will be the first woman to serve as the President of bp Oman. In a press statement, Nader Zaki, bp's regional president Middle East and North Africa said, 'I am very pleased to welcome Najla to our team as President of bp Oman. Her wealth of experience will greatly benefit us as we continue to support the growth of the energy sector in Oman. This is a historic milestone for bp as Najla is the first female Omani country manager for bp in the country. I would also like to thank Yousuf al Ojaili for his leadership and congratulate him on his retirement after a decade of excellence with our company and 39 years in the energy sector.' Commenting on her appointment as President of bp Oman, Najla said, 'I'm excited to join bp Oman working with the team to continue supply one-third of Oman's gas and working with the Omani government and partners to explore potential for growing our operations in country.' Najla will join bp in September where she will assume full roles and responsibilities after a transition period with Yousuf al Ojaili who retires at the end of 2025.

Oman advances CO₂, green hydrogen pipeline studies
Oman advances CO₂, green hydrogen pipeline studies

Observer

time05-08-2025

  • Observer

Oman advances CO₂, green hydrogen pipeline studies

MUSCAT: OQ Gas Networks (OQGN), the majority state-owned natural gas pipeline operator, has announced significant progress in its mandate to roll out dedicated pipelines for green hydrogen and carbon dioxide (CO₂), in support of Oman's energy transition strategy. Publicly traded OQGN — part of Oman's integrated energy group OQ — stated in its newly issued 2024 Sustainability Report that its initiatives are aligned with national strategies to develop new low-carbon industries focused on green hydrogen production and Carbon Capture, Utilisation and Storage (CCUS) technologies, both of which are key to Oman's Net-Zero 2050 targets. This commitment aligns with OQGN's designation as a National Champion for Green Hydrogen and CO₂ Transportation, conferred by Hydrom, the state-run architect of Oman's green hydrogen industry. 'We are (...) actively exploring opportunities in hydrogen and carbon capture infrastructure, aligning with global energy trends shaping the future of our industry', said Mansoor al Abdali, CEO of OQGN. 'Looking ahead, we are poised to play a central role in Oman's energy future. As we invest in network expansion, digitalisation and decarbonisation initiatives, we remain aligned with Oman Vision 2040 and its sustainability goals', he added in the CEO's Message. In 2024, OQGN began working closely with key industry stakeholders to establish itself as 'the partner of choice for hydrogen and CO₂ pipeline transportation'. As part of this ambition, the company initiated collaborations with CCUS developers to create commercial-scale projects that address CO₂ transportation needs. 'We also launched detailed feasibility studies focused on establishing the technical, commercial and regulatory aspects of the pipeline networks', the company stated. Furthermore, in collaboration with Hydrom, OQGN has been leveraging its extensive pipeline expertise in the development of Oman's hydrogen and CO₂ transportation infrastructure. Central to this initiative is a vision for an open-access pipeline connecting green hydrogen production blocks (powered by wind and solar) with derivative plants located along the coast for efficient processing and export. 'This hydrogen pipeline network is being developed in coordination with Hydrom's planned projects in Al Duqm, Salalah and Al Jazir. As domestic demand for low-carbon hydrogen grows, the network will expand to serve industrial clusters in northern and eastern Oman', OQGN noted. 'In an additional step, an open-access CO₂ pipeline network will also link emission sources to sinks. As natural gas demand declines, stranded natural gas pipelines may be repurposed and recommissioned as part of the green hydrogen transportation network', the company added. According to OQGN, a comprehensive long-term Decarbonisation Strategy is currently in place to accelerate the reduction of greenhouse gas (GHG) emissions across the company. 'The strategy drives us towards the goal of Net-Zero by 2050, with ambitious interim targets: a 42% reduction in GHG emissions by 2030 and 82% by 2040. These milestones have been set with consideration for emerging technologies, evolving regulations, shifting stakeholder expectations and our investment strategy — while also balancing urgency with feasibility', it stated.

EOR share of PDO's crude oil output to spike to 28% by 2031
EOR share of PDO's crude oil output to spike to 28% by 2031

Observer

time04-08-2025

  • Observer

EOR share of PDO's crude oil output to spike to 28% by 2031

MUSCAT: Crude oil output based on Enhanced Oil Recovery (EOR) technologies is projected to account for a significant 28% of Petroleum Development Oman's (PDO) total annual crude oil production by 2031, up from 19% currently, according to the majority state-owned energy company. The projected increase underscores the growing importance of EOR—a set of advanced techniques used to boost oil recovery from reservoirs after primary and secondary methods become less effective—in PDO's long-term production strategy. EOR methods typically help maximize recovery by 30–50% from some of Oman's maturing oilfields. Notably, the contribution of EOR to PDO's overall crude production has been steadily rising over the past decade, climbing from 5% in 2014 to 12% in 2020, and further to 19% in 2025. 'In 2024, PDO continued its efforts to boost the future contribution of Enhanced Oil Recovery (EOR) to oil production. It is projected that by 2031, EOR projects will account for approximately 28% of our total output. We currently operate a variety of commercial-scale EOR schemes, including thermal applications, miscible gas injection (MGI), and chemical EOR. Additionally, further portfolio optimisation and the introduction of new opportunities into the hydrocarbon maturation funnel have increased production contributions from primary and secondary processes,' the company stated in its 2024 Sustainability Report. In 2024, PDO advanced the rollout of EOR technologies across a number of assets in its Oil South portfolio. A Final Investment Decision (FID) was taken on a polymer flooding project in the Haima West field (Mahwis reservoir) within the Marmul cluster. The project is expected to recover an additional 36 million barrels of oil by 2045, with an on-stream date set for 2026. Also targeted for extensive polymer flooding is Nimr, which hosts oilfields deemed 'well-suited' for this type of EOR technology. Last year, PDO approved two FIDs for polymer flood projects in the Nimr-A and Nimr-E oil fields—forming Wave 1 of polymer projects. 'The Nimr-A project is projected to recover 20 million barrels, while Nimr-E is expected to add 22 million barrels, both slated to be onstream by 2026. These projects will require the construction of new injection facilities and polymer injector wells. A new chemical EOR (cEOR) Category Management framework will be applied to expedite contract awards and reduce costs,' PDO stated. In other updates during the year, the Harweel 2AB Project (Zalzala Field) increased its gas injection rate from 3 million to 4 million cubic metres per day (m³/d), improving cumulative incremental oil recovery to 54 million barrels to date. Similarly, under the RHIP Tranche 1 Projects, the SAK A2C produced 43 million barrels of additional oil—up from previous estimates of 29 million barrels. Incremental recovery from SAK A3C also rose, from 8.7 million barrels to 12.6 million barrels. However, the Al Noor Phase 3A MGI Project saw a downward revision in its incremental recovery estimate, with only 3 million barrels expected—significantly lower than the earlier projection of 12.1 million barrels, the company noted. Production from steam-based EOR projects also dipped in 2024. The Amal Steam Project reported an average oil production of 2,285 m³/d (13,400 bpd) in 2024, down from 2,626 m³/d (16,500 bpd) in 2023. Likewise, Qarn Alam Steam production declined to 3,302 m³/d (20,768 bpd) in 2024, compared to 3,703 m³/d (23,291 bpd) the previous year.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store