logo
Elan Group awards Rs 1,100 crore construction contract to Leighton Asia for Gurugram luxury project

Elan Group awards Rs 1,100 crore construction contract to Leighton Asia for Gurugram luxury project

Time of India15-05-2025
Realty developer
Elan Group
has awarded
construction contract
worth Rs 1100 crore to
Leighton Asia
, part of the Australian
CIMIC Group
, for its ultra-luxury residential development,
Elan The Emperor
in Sector 106,
Dwarka Expressway
, Gurugram.
Elan The Emperor is part of Elan Group's 50 acre – integrated township, designed to be a future forward ecosystem of luxury living.
The Construction contract for Elan The Emperor covers nearly 5 million sq. ft. of built-up area.
'Partnering with Leighton Asia once again reinforces our commitment to collaborate with the finest global expertise in delivering excellence at every level,' said Rakesh Kapoor, Chairman, Elan Group.
The group has already tied up with architects, urban designers and construction experts including UHA London, SWA Group, WET Design, HBA (Hirsch Bedner Associates), CD+M Lighting Design Group, Mero Contractors, DSA Engineering, LERA and Thornton Tomasetti.
Leighton Asia has been awarded significant Civil and MEP contracts by Elan Group for its ongoing projects which includes Elan The Presidential, Elan The Imperial and now Elan The Emperor. The total value of these contracts is approximately Rs 3000 crore. These contracts cover a total built-up area of approximately 12.5 million square feet.
'With more than two decades of on-the-ground experience in India, Leighton Asia takes pride in setting new benchmarks for quality and sustainability in large-scale residential projects,' said Brad Davey, Managing Director, Leighton Asia.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

1,240 National Highway Projects Worth Rs 7.8 Lakh Crore Underway: Nitin Gadkari
1,240 National Highway Projects Worth Rs 7.8 Lakh Crore Underway: Nitin Gadkari

NDTV

time42 minutes ago

  • NDTV

1,240 National Highway Projects Worth Rs 7.8 Lakh Crore Underway: Nitin Gadkari

New Delhi: Union Minister Nitin Gadkari on Wednesday said 1,240 national highways projects in 29,406 km, costing Rs 7.80 lakh crore, are currently under construction in the country, of which 15,674 km have been completed. These projects are under various stages of construction and are scheduled for completion in a phased manner by the financial year 2028-29, Gadkari said in a written reply to Rajya Sabha. The ministry of road transport and highways is primarily responsible for the development and maintenance of National Highways (NHs) and Expressways. Responding to a separate question, the minister said that during the current Financial Year 2025-26, the government has prepared the annual plan for the development of about 19,555 km of NHs, including about 548 km in the State of West Bengal. He also said a total of 4,557 electric vehicle Public Charging Stations (PCSs) have been installed on the State/National Highways and Expressways in the country. The minister said the government has prioritised the maintenance of the existing national highways network and has evolved a mechanism to ensure maintenance and repair (M&R), including timely repair of potholes on all NHs, through accountable maintenance agencies. NHs' development projects are executed mainly in three modes-- Build-Operate and Transfer (BOT), Hybrid Annuity Model (HAM) and Engineering Procurement and Construction (EPC). Concession period, including maintenance for projects on Build-Operate and Transfer (BOT), is 15 to 20 years, and on Hybrid Annuity Model (HAM) is generally 15 years. The Concessionaire is responsible for the maintenance of the respective NH stretches within the concession period of the project. Only in the case of EPC projects, the Defect Liability period (DLP) is 5 years for the bituminous pavement works and 10 years for concrete pavement works.

Women get pension ahead of festive week
Women get pension ahead of festive week

Time of India

time44 minutes ago

  • Time of India

Women get pension ahead of festive week

Lucknow: In view of Rakshabandhan and Janmashtami, to be celebrated next week, the state govt released pensions for destitute women ahead of time. The department of women and child development said that Rs 1,115.64 crore for the second quarter of the year (July to Sept) was released into the accounts of 36,75,623 beneficiaries in the first week of Aug. Usually, pensions of all kinds are issued only at the end of the quarter. Under the destitute pension scheme, govt provides Rs 1,000 per month to women over the age of 18 years who are permanent residents of UP and whose husbands have passed away. Their annual family income should not exceed Rs 2 lakh. "In view of the festivals, govt decided to release the pension amount ahead of time. In the first quarter from April to June, 2025, Rs 1,062.15 crore was provided to 35,78,111 beneficiaries under this scheme. In the second quarter, govt transferred Rs 1,115.64 crore to 36,75,623 women in the first week of Aug itself. This step is a significant initiative to ensure financial assistance for women before festivals like Rakshabandhan and Janmashtami, allowing them to celebrate with their families with full enthusiasm," said a govt spokesperson.

Lucknow-based Takyon Networks lists on BSE
Lucknow-based Takyon Networks lists on BSE

Time of India

time44 minutes ago

  • Time of India

Lucknow-based Takyon Networks lists on BSE

Lucknow: Lucknow-based IT solutions company Takyon Networks Limited on Wednesday got listed on the SME platform of the Bombay Stock Exchange (BSE). Headquartered in Gomtinagar, Takyon Networks Limited's listing on the BSE SME (small and medium enterprises) platform signals the growth story UP-based entrepreneurs are achieving. The initial public offering (IPO) valued Rs 20 crore was oversubscribed by 20.35 times backed by strong investor interest. Chairman and managing director of the company Manish Kumar Sharma, described the listing as a triumph of collective effort. "This listing is not just an achievement. It is a celebration of the trust and commitment shared by our employees, customers, and partners over the years. Our journey from Lucknow to BSE proves that world-class technology companies can emerge from tier-II cities." The most anticipated moment of the event, the gong bell ceremony, added a memorable moment to the proceedings. As the clock struck 10 am, a countdown was announced from the stage, culminating in Sharma striking the ceremonial gong. The resonating chime was more than a sound — it was a declaration of over a decade of perseverance, vision and trust. Following the listing, the company's estimated market capitalisation stands at Rs 78 crore. The company caters to clients across sectors from govt agencies to corporate enterprises. Its offerings include networking infrastructure, data centre solutions, cloud and managed services, IT security, surveillance, maintenance, and onsite technical support.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store