Meridian Appoints Ausenco Brazil as Lead Engineer for the Cabaçal Definitive Feasibility Study and Signs LOI with Aurubis AG
Highlights:
LONDON, UK / ACCESS Newswire / May 8, 2025 / Meridian Mining UK S (TSX:MNO)(Frankfurt/Tradegate:2MM)(OTCQX:MRRDF) ('Meridian' or the 'Company') is pleased to announce that it has appointed Ausenco do Brasil Engenharia Ltda ('Ausenco') to undertake the Definitive Feasibility Study ('the DFS') for its advanced Cabaçal Au-Cu project ('Cabaçal'), located in Mato Grosso, Brazil. Ausenco is an internationally respected engineering firm with extensive global and Brazilian experience in conducting feasibility studies on projects similar to the scale of Cabaçal. On completion of the DFS, Meridian will be positioned to make a final investment decision on the Cabaçal build in 2026.
Mr. Gilbert Clark, CEO, comments: 'Having completed the PEA and PFS on Cabaçal, the later delivering nearly a billion dollars in NPV for Cabaçal, I'm delighted to continue this long-term relationship with Ausenco by having them perform Cabaçal's DFS. With Ausenco's 'A' team on the DFS who are already familiar with Cabaçal means that we can kick off the study immediately, progress it rapidly, and after its potential successful reporting, focus on the build.
I'm very pleased to have established an important corporate relationship with Aurubis that will greatly help to grow the Company from being a resource developer to a mining and exporting company. With the Agreement, we can now start preparing the Company to be compliant with the import regulations of Germany and the European Union, look to access strategic European equity and project financing facilities while maintaining our schedule to be Brazil's next near-term copper-gold-silver concentrate exporter'.
Cabaçal Definitive Feasibility Study Launch
Cabaçal's Pre-Feasibility Study (effective date March 10, 2025) delivered strong economic results with a base case after-tax NPV5 of USD 984 million and 61.2% IRR from a pre-production capital cost of USD 248 million ('the PFS'). This provides a strong platform from which to launch Cabaçal's DFS and it is expected that the core elements of the PFS will be further developed to the DFS level with minimal change.
An updated resource and mine plan will be produced using drill results obtained after the PFS database was cut off. This will include such recent highlighted drill results1 of :
Cabaçal's process flowsheet is expected to remain similar to that devised for the PFS with a moderately finer primary grind to be adopted.
Ausenco has developed a schedule to complete Cabaçal's DFS and the time needed to generate the additional data required for the study's completion. This indicates that the study should be completed before the end of 1H 2026. The company has advanced on complementary contracts related to the DFS with groups such as Brazil's GE21 who were part of the PFS success.
Aurubis LOI
Meridian and Aurubis ('together the Parties') - a globally leading non-ferrous metals group - have signed a non-binding Letter of Intent to initiate a long-term corporate relationship and technical exchange to optimize Cabaçal's future high-quality copper-gold-silver sulphide concentrates ('the LOI'). The Parties will explore and exchange technical ideas to optimize future Cabaçal clean high-grade copper concentrate, with payable gold and silver credits, as outlined in Cabaçal's PFS, for Outotec flash smelter performance. Flash smelters are the most common type of copper smelters in Europe, where Aurubis operates two sites; Hamburg (Germany) and Zlatitsa-Pirdop (Bulgaria).
The Parties will also work together to advance Meridian's future compliance to the EU Supply Chain Due Diligence Act and the OECD Due Diligence Guidance. The result of this co-operation by the Parties is that the Company will be prepared for the future regulatory compliance to export Cabaçal's copper concentrates to the 3rd largest market for copper concentrates, the European Union.
Strategic Equity and Project Finance Process
Meridian is actively engaging with international and domestic project finance banks and funds to advance the project financing process alongside the progress of the DFS. The LOI presents an opportunity to potentially access both debt and equity capital from German and other European government-backed institutions. This includes debt guarantees under the UFK Untied Loan Guarantee scheme and equity from the KfW2-managed Raw Materials Fund. Meridian's management has over a decade of funds management and banking relationships with KfW. Such future arrangements would be associated with a copper concentrate off-take agreement, of a proportion of Cabaçal's production, that would benefit a smelter group such as Aurubis or European manufacturers requiring copper units.
About Meridian
Meridian Mining is focused on:
The Pre-feasibility Study technical report (the 'PFS Technical Report') dated March 31, 2025, entitled: 'Cabaçal Gold-Copper Project NI 43-101 Technical Report and Pre-feasibility Study' outlines a base case after-tax NPV5 of USD 984 million and 61.2% IRR from a pre-production capital cost of USD 248 million, leading to capital repayment in 17 months (assuming metals price scenario of USD 2,119 per ounces of gold, USD 4.16 per pound of copper, and USD 26.89 per ounce of silver). Cabaçal has a low All-in-Sustaining-Cost of USD 742 per ounce gold equivalent & production profile of 141,000-ounce gold equivalent life of mine, driven by high metallurgical recovery, a low life-of-mine strip ratio of 2.3:1, and the low operating cost environment of Brazil.
The Cabaçal Mineral Reserve estimate consists of Proven and Probable reserves of 41.7 million tonnes at 0.63g/t gold, 0.44% copper and 1.64g/t silver (at a 0.25 g/t gold equivalent cut-off grade).
Readers are encouraged to read the PFS Technical Report in its entirety. The PFS Technical Report may be found under the Company's profile on SEDAR+ at www.sedarplus.ca and on the Company's website at www.meridianmining.co
The PFS Technical Report was prepared for the Company by Tommaso Roberto Raponi (P. Eng), Principal Metallurgist with Ausenco Engineering Canada ULC; Scott Elfen (P. E.), Global Lead Geotechnical and Civil Services with Ausenco Engineering Canada ULC; John Anthony McCartney, C.Geol., Ausenco Chile Ltda.; Porfirio Cabaleiro Rodriguez (Engineer Geologist FAIG), of GE21 Consultoria Mineral; Leonardo Soares (PGeo, MAIG), Senior Geological Consultant of GE21 Consultoria Mineral; Norman Lotter (Mineral Processing Engineer; P.Eng.), of Flowsheets Metallurgical Consulting Inc.; and, Juliano Felix de Lima (Engineer Geologist MAIG), of GE21 Consultoria Mineral.
On behalf of the Board of Directors of Meridian Mining UK S
Mr. Gilbert Clark - CEO and Director
Meridian Mining UK S
8th Floor, 4 More London Riverside
London SE1 2AU
United Kingdom
Email: [email protected]
Ph: +1 778 715-6410 (BST)
Stay up to date by subscribing for news alerts here: https://meridianmining.co/contact/
Follow Meridian on Twitter: https://twitter.com/MeridianMining
Further information can be found at: www.meridianmining.co
Cautionary Statement on Forward-Looking Information
Some statements in this news release contain forward-looking information or forward-looking statements for the purposes of applicable securities laws. These statements address future events and conditions and so involve inherent risks and uncertainties, as disclosed under the heading 'Risk Factors' in Meridian's most recent Annual Information Form filed on www.sedarplus.ca. While these factors and assumptions are considered reasonable by Meridian, in light of management's experience and perception of current conditions and expected developments, Meridian can give no assurance that such expectations will prove to be correct. Any forward-looking statement speaks only as of the date on which it is made and, except as may be required by applicable securities laws, Meridian disclaims any intent or obligation to update any forward-looking statement, whether as a result of new information, future events, or results or otherwise.
1 Meridian Mining News Releases of February 24, 2025 and April 29, 2025.
2 KfW, 'Kreditanstalt fuer Wiederaufbau',is the German state-owned investment and development bank, based in FrankfurtSOURCE: Meridian Mining SE
press release
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
an hour ago
- Yahoo
NOVAGOLD and Paulson Advisers Complete $1 Billion Acquisition of Barrick Mining's 50% Interest in Donlin Gold
Paulson Advisers acquires a 40% ownership interest in Donlin Gold NOVAGOLD increases ownership interest in Donlin Gold from 50% to 60% Financial public offering and concurrent private placement raised sufficient funding for NOVAGOLD's acquisition and for the Donlin Gold Feasibility Study update All amounts are in U.S. dollars unless otherwise stated VANCOUVER, British Columbia, June 03, 2025 (GLOBE NEWSWIRE) -- NOVAGOLD RESOURCES INC. ('NOVAGOLD') (NYSE American, TSX: NG) and Paulson Advisers LLC ('Paulson') are pleased to announce the successful closing of their previously disclosed acquisition of Barrick Mining Corporation's ("Barrick's") 50% interest in the Donlin Gold project, establishing new ownership of Donlin Gold LLC to advance the Donlin Gold project in Alaska. At closing, NOVAGOLD acquired an additional 10% in Donlin Gold LLC for $200 million — increasing its stake to 60% — while Paulson secured a 40% interest in Donlin Gold LLC for $800 million. NOVAGOLD and Paulson entered into a new limited liability company agreement governing Donlin Gold with equal governance rights. 'Today we completed the successful and strategic Donlin Gold transaction through a strong collaborative effort between NOVAGOLD, Paulson, and Barrick since announcing the transaction on April 22, 2025,' said Greg Lang, NOVAGOLD's President and CEO. 'This constitutes a truly transformational transaction and an exciting new chapter for Donlin Gold as we advance one of the best and most jurisdictionally attractive gold development projects in the world. We look forward to providing updates on the key milestones in the coming months, starting with our revamped and determined efforts regarding the Feasibility Study workstream.' As of March 1, 2025, pro forma the upsized public offering and private placement which closed on May 9, 2025, NOVAGOLD had $327M to fund the acquisition of the additional 10% stake in Donlin Gold LLC and the Company's share of ongoing activities at Donlin. NOVAGOLD has opted not to prepay the outstanding debt owed to Barrick in connection with the Donlin Gold project for $90 million upon closing, but it retains the option to prepay the outstanding debt for $100 million within 18 months from closing, when the option expires. If that option is not exercised, the debt, currently valued at $158.9 million as of June 3, 2025, will remain outstanding, substantially in accordance with its existing terms (U.S. prime plus 2% compounded semi-annually). In coordination with Paulson, a strategic review of the Donlin Gold 2025 budget ($43 million on a 100% basis) will be completed while advancing the following activities: Commencing the workstream to update the Feasibility Study1, including assembling a specially dedicated team to advance these efforts; Executing the 2025 drill program focused on the conversion and expansion of reserves and resources, with both partners committed to exploring for new resources along strike and to depth in future campaigns; Advancing the technical work and engineering designs; Supporting state permitting efforts and maintaining existing federal and state permits in good standing, including government affairs engagement with federal and state representatives; and Collaborating on ongoing stakeholder outreach and investment initiatives in Alaska. About NOVAGOLD NOVAGOLD is a precious metals company focused on the development of the Donlin Gold project. Located in Alaska, one of the safest mining jurisdictions in the world, the Donlin Gold project is regarded as one of the largest, highest-grade, and most prospective known open-pit gold deposits in the world. About Paulson Paulson is a private global investment management advisory firm based in Palm Beach, Florida. NOVAGOLD Contacts: Mélanie HennesseyVice President, Corporate Communications 604-669-6227 or 1-866-669-6227 Frank GagnonManager, Investor Relations778-990-0299 or 1-866-669-6227 Paulson Contact: Michael McKeon mmckeon@ Cautionary Note Regarding Forward-Looking StatementsThis media release includes certain 'forward-looking information' and 'forward-looking statements' (collectively 'forward-looking statements') within the meaning of applicable securities legislation, including the United States Private Securities Litigation Reform Act of 1995. Forward-looking statements include future-oriented financial information or financial outlook within the meaning of securities laws, including information regarding the anticipated benefits of the transaction with Paulson, NOVAGOLD's anticipated expenditures and anticipated plans for the new partnership and Donlin following the completion of the transaction, statements regarding the permitting, potential development, exploration, construction and operation of Donlin Gold and statements relating to NOVAGOLD's future operating and financial performance and production estimates. Such information is intended to assist readers in understanding NOVAGOLD's current expectations and plans relating to the future. Such information may not be appropriate for other purposes. Forward-looking statements are frequently, but not always, identified by words such as 'expects', 'continue', 'ongoing', 'anticipates', 'believes', 'intends', 'estimates', 'potential', 'possible', and similar expressions, or statements that events, conditions, or results 'will', 'may', 'could', 'would' or 'should' occur or be achieved. Forward-looking statements are necessarily based on several opinions, estimates and assumptions that management of NOVAGOLD considered appropriate and reasonable as of the date such statements are made, are subject to known and unknown risks, uncertainties, assumptions, and other factors that may cause the actual results, activity, performance, or achievements to be materially different from those expressed or implied by such forward-looking statements. All statements, other than statements of historical fact, included herein are forward-looking statements. These forward-looking statements include statements regarding plans for and anticipated timing a new feasibility study on the Donlin Gold project; plans for and anticipated timing of a strategic review of Donlin Gold's 2025 budget our goals and planned activities for 2025; anticipated timing of milestone and project updates; ongoing support provided to key stakeholders including Native Corporation partners; Donlin Gold's continued support for the state and federal permitting process; sufficiency of working capital; the potential development and construction of the Donlin Gold project; the timing and ability for the Donlin Gold project to hit critical milestones; the ability for the Tier One gold development project to hit the anticipated projections; the sufficiency of funds to continue to advance development of Donlin Gold, including to a construction decision; perceived merit of properties; mineral reserve and mineral resource estimates; Donlin Gold's ability to secure the permits needed to construct and operate the Donlin Gold project in a timely manner, if at all; legal challenges to Donlin Gold's existing permits and the timing of decisions in those challenges; plans to continue to advance the Donlin Gold project safely, socially responsibly and to sustainably generate value for our stakeholders; continued cooperation between the owners of Donlin Gold LLC to advance the project; NOVAGOLD's ability to deliver on its strategy with the Donlin Gold project; the success of the strategic mine plan for the Donlin Gold project; the success of the Donlin Gold community relations plan; the anticipated outcome of exploration drilling at the Donlin Gold project and the timing thereof; the completion of test work and modeling and the timing thereof. In addition, any statements that refer to expectations, intentions, projections or other characterizations of future events or circumstances are forward-looking statements. Forward-looking statements are not historical facts but instead represent the expectations of NOVAGOLD management's estimates and projections regarding future events or circumstances on the date the statements are made. Important factors that could cause actual results to differ materially from expectations include failure to satisfy or waive the closing conditions to the transaction; the need to obtain additional permits and governmental approvals; the timing and likelihood of obtaining and maintaining permits necessary to construct and operate; the need for additional financing to complete an updated feasibility study and to explore and develop properties and availability of financing in the debt and capital markets; disease pandemics; uncertainties involved in the interpretation of drill results and geological tests and the estimation of reserves and resources; changes in mineral production performance, exploitation and exploration successes; changes in national and local government legislation, taxation, controls or regulations and/or changes in the administration of laws, policies and practices, expropriation or nationalization of property and political or economic developments in the United States or Canada; the need for continued cooperation between the owners of Donlin Gold LLC to advance the project; the need for cooperation of government agencies and Native groups in the development and operation of properties; risks of construction and mining projects such as accidents, equipment breakdowns, bad weather, disease pandemics, non-compliance with environmental and permit requirements, unanticipated variation in geological structures, ore grades or recovery rates; unexpected cost increases, which could include significant increases in estimated capital and operating costs; fluctuations in metal prices and currency exchange rates; whether or when a positive construction decision will be made regarding the Donlin Gold project; and other risks and uncertainties disclosed in NOVAGOLD's most recent reports on Forms 10-K and 10-Q, particularly the 'Risk Factors' sections of those reports and other documents filed by NOVAGOLD with applicable securities regulatory authorities from time to time. Copies of these filings may be obtained by visiting NOVAGOLD's website at or the SEC's website at or on SEDAR+ at The forward-looking statements contained herein reflect the beliefs, opinions and projections of NOVAGOLD on the date the statements are made. NOVAGOLD assumes no obligation to update the forward-looking statements of beliefs, opinions, projections, or other factors, should they change, except as required by law. ______________1 The updated Feasibility Study/Technical Report will be compliant with NI 43-101 and S-K in to access your portfolio


Washington Post
an hour ago
- Washington Post
Peru allows miners to seek permits in area removed from Nazca Lines protection
BOGOTA, Colombia — Peru announced Tuesday that miners who had been operating illegally in a large protected archaeological reserve around the famous Nazca Lines will now be able to start the process of obtaining mining permits, after the government reduced the protected area by 42%. Energy and Mines Minister Jorge Montero said those working in the area must now legalize their mining activities since the zone is no longer designated as archaeological heritage.

Associated Press
2 hours ago
- Associated Press
Peru allows miners to seek permits in area removed from Nazca Lines protection
BOGOTA, Colombia (AP) — Peru announced Tuesday that miners who had been operating illegally in a large protected archaeological reserve around the famous Nazca Lines will now be able to start the process of obtaining mining permits, after the government reduced the protected area by 42%. Energy and Mines Minister Jorge Montero said those working in the area must now legalize their mining activities since the zone is no longer designated as archaeological heritage. 'You're fully illegal when you operate in a place where mining is banned ... but since that cultural heritage restriction no longer exists, they're no longer in violation — they'll need to formalize their operations,' Montero said in a press conference in Lima on Tuesday for correspondents working for the international media. He added that the government does not yet know how many miners are currently active there. The area in question forms part of a UNESCO-recognized World Heritage Site, home to the Nazca Lines — massive geoglyphs etched into the desert thousands of years ago — and one of Peru's most fragile desert ecosystems. Last week, the Ministry of Culture issued a resolution reducing the protected area around the Nazca Lines by 2,397 square kilometers (925 square miles). The reserve, created in 1993, was set at 5,633 square kilometers (2,175 square miles) in 2004. 'It's incredible how the government is not even interested in the heritage of our ancestors that is unprotected, and will be destroyed without any control,' Peruvian environmental lawyer, Cesar Ipenza, told The Associated Press. Ipenza said once the miners enter, they will create huge environmental impacts, and will not assume responsibility. 'And now that the government has released the area from its protection, mining petitions have already started to appear,' he said. Culture Minister Fabricio Valencia said the reduction was based on 'over 20 years of rigorous studies' and that the true archaeological reserve is about 3,200 square kilometers (1,235 square miles). On Saturday, he acknowledged on local Peruvian media that mining was taking place within the reserve. Valencia said the UNESCO World Heritage site that contains the Nazca Lines themselves, covering about 450 square kilometers (174 square miles), was not affected by the change. The AP reviewed the resolution but found no details about the studies justifying the reduction. Requests for those studies went unanswered and UNESCO told AP it had not been notified by Peru of the change and that it will seek information from the government. In past years, Peru's Culture Ministry, prosecutors, and media reported illegal mining inside the protected reserve, including the destruction of mining machinery and camps. ___ The Associated Press' climate and environmental coverage receives financial support from multiple private foundations. AP is solely responsible for all content. Find AP's standards for working with philanthropies, a list of supporters and funded coverage areas at