
GFM Services acquires stake in Shapadu Energy
This acquisition builds on GFM's 2023 purchase of Highbase Strategic Sdn Bhd (Highbase), another O&G FM player.
Shapadu Energy, via its unit Shapadu CR Asia, holds a key turnaround maintenance contract (TA4MS) with Pengerang Refining Company Sdn Bhd and Pengerang Petrochemical Company Sdn Bhd (collectively known as PRefChem), a joint venture between Petroliam Nasional Bhd and Saudi Aramco at the Pengerang Integrated Complex.
With this deal, GFM will gain greater access to large-scale, complex projects at PIC, leveraging Shapadu Energy's resources and expertise.
The combined operations of Shapadu Energy and Highbase are expected to create operational synergies, enhance efficiency, and reduce costs.
Upon completion, GFM will own 60% of Shapadu Energy, with Shapadu Corp retaining 40%. The deal is expected to be completed in the second half of 2025, funded via internal resources and/or borrowings.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Malaysian Reserve
2 days ago
- Malaysian Reserve
O-RAN ALLIANCE Opens Call for Participation in its O-RAN Global PlugFest Fall 2025
Call for Participation for the O-RAN ALLIANCE Global PlugFest Fall 2025 is underway The PlugFest is hosted by 25 operators and independent institutions in 19 labs around the world The PlugFest will focus on 6 themes targeted to facilitate interoperability and deployment BONN, Germany, Aug. 14, 2025 /CNW/ — The O-RAN ALLIANCE has opened the Call for Participation for its O-RAN Global PlugFest Fall 2025. The PlugFest provides a global platform for Radio Access Network (RAN) equipment manufacturers, service providers, universities, and research institutions to test, integrate, and validate solutions in a collaborative, multi-vendor environment. The PlugFest is hosted by 25 operators and independent institutions in 19 labs in different regions around the world. PlugFest activities are planned from August through November 2025, followed by presentations and demonstrations of results to the O-RAN community. O-RAN ALLIANCE plans a public announcement of the PlugFest outcomes in December. PlugFest efforts will focus on six themes prioritized in the O-RAN ALLIANCE Testing and Integration Focus Group: O-RAN System Testing with Layer 1 Acceleration Demonstrate consistent and repeatable open fronthaul testing in multiple labs O-RAN Energy Consumption, Efficiency and Savings Testing O-RAN E2E Deployment Templates, DevOps, and Test Automation O-RAN White-box Hardware diversity ecosystem Open Fronthaul Transport Testing with multiple O-RUs Several of these areas utilize AI-powered intelligent components, including Service Management and Orchestration (SMO), RAN Intelligent Controllers (RICs) and related xApps/rApps, enabled by O-RAN specifications. Learn more about the PlugFest and register on our website. Details from previously completed O-RAN PlugFests are publicly available in the O-RAN PlugFest Virtual Showcase. Participation is free for O-RAN ALLIANCE members and participants. Non-member organizations are welcome to join the O-RAN ALLIANCE to gain membership benefits, including: Complimentary PlugFest participation Access to face-to-face meetings and technical work groups Collaboration with a diverse global O-RAN ecosystem Learn more and apply for O-RAN ALLIANCE membership through our website. 'The O-RAN Global PlugFest is more than just a testing event – it's where ideas become solutions and collaborations help enable future real-world deployments,' said Brian Daly, Co-chair of the O-RAN Technical Steering Committee and AVP at AT&T Services Inc. 'Participants will benefit from access to advance labs and cooperation with others on validation and integration of technology and solutions shaping the next generation of open, intelligent, and virtualized RAN.' About O-RAN ALLIANCEThe O-RAN ALLIANCE is a world-wide community of mobile operators, vendors, research & academic institutions as well as governmental agencies, operating or interested in Radio Access Networks (RAN). As the RAN is an essential part of any mobile network, the O-RAN ALLIANCE's mission is to re-shape the industry towards more intelligent, open, virtualized and fully interoperable mobile networks. The new O-RAN specifications enable a more competitive and vibrant RAN supplier ecosystem with faster innovation to improve user experience. O-RAN based mobile networks at the same time improve the efficiency of RAN deployments as well as operations by mobile operators. To achieve this, the O-RAN ALLIANCE publishes new RAN specifications, releases open software for the RAN, and supports its members in integration and testing of their implementations. For more information, please visit


The Star
6 days ago
- The Star
Sime UMW in the fast lane
Mustamir: Our operations are not only in Malaysia – they span Singapore, Vietnam and a bit of China. When Sime Darby Bhd (Sime) acquired UMW Holdings Bhd (now Sime UMW) for RM5.84bil in 2024, it was driven by a clear goal – to boost revenue growth and improve operational efficiency. Fast forward to 2025 and much of the heavy lifting has been done, with RM50mil in recurring annual savings taking shape. Datuk Mustamir Mohamad, the managing director of Sime UMW, shares that there were opportunities to streamline operations at the head office. About RM30mil in savings came from 'right-sizing' efforts, mainly focused on the head office rather than strategic business units.


The Star
06-08-2025
- The Star
BPMB commits RM367.2mil to back Penang Hill cable car project
(From left) BPMB managing director of group corporate and investment banking Mohamed Nazri Omar, Chief Minister Chow Kon Yeow, BPMB group head of coverage Gerald Goh, Hartasuma executive director Tan Sri Ravindran Menon and Jen (R) Tan Sri Zulkiple Kassim at the signing ceremony. GEORGE TOWN: A 10-minute ride through the air to Penang Hill is set to become a reality, with Bank Pembangunan Malaysia Berhad (BPMB) committing RM367.2mil to back the hill's cable car project. The financing deal with project concessionaire Hartasuma Sdn Bhd marks a major step forward for the much-discussed plan to improve access to Penang Hill. Once completed, the cable car system will have a carrying capacity of up to 1,400 passengers per hour in each direction, offering a quicker, more scenic journey from the Penang Botanic Gardens to the summit. The project also supports Penang's broader goals for sustainable tourism and long-term infrastructure development. Hartasuma, an established player in transport engineering, will develop, finance, operate and maintain the system. At the signing of the financing facility agreement here on Wednesday (Aug 6), BPMB managing director Mohamed Nazri Omar said the project reflects the bank's role in supporting national development with impact-driven capital. 'This is BPMB Group's first blended finance initiative, combining debt financing and equity investment,' he said. 'We are proud to support a project that builds on Penang Hill's longstanding appeal as a premier eco-tourism destination. "Visitor numbers are steadily rebounding with 1.8 million in 2024, up from 1.6 million the year before, and approaching pre-pandemic levels of 1.9 million. "With the cable car in place, annual visitation is expected to nearly double, reaching up to 3.96 million by 2035 — a clear sign of the project's potential to elevate Penang Hill's appeal on the global stage. 'More than just a transport solution, the cable car offers resilience and capacity. In doing so, it not only enhances the visitor experience but also unlocks new socio-economic opportunities with up to 300 jobs created during construction and over 100 more during operations,' he added. The equity portion of up to RM30mil is structured via Musharakah under BPMB Dana Sdn Bhd and supported by the National Energy Transition Facility (NETF), aligning the project with Malaysia's low-carbon transition agenda. Hartasuma Executive Director Tan Sri Ravindran Menon called the cable car a legacy project that will be remembered for generations. He said the system is expected to be ready by early 2027. "We are building more than a cable car. We are building a shared memory, one that will be passed down in stories of those who journey here," Ravindran added. Chief Minister Chow Kon Yeow said the cable car will complement—not replace—the funicular, helping manage the growing number of visitors. 'This project is no longer theoretical. It is urgent,' he said. As a long term plan, Chow told reporters later that the state was exploring the possibility of extending the cable car to Gurney Bay, 2.5km away, after it is up and running.