logo
SP Sambhal MP fined Rs 1.35 lakh over building construction

SP Sambhal MP fined Rs 1.35 lakh over building construction

The Print7 hours ago
An official said a notice was issued to the MP by the Sub-Divisional Magistrate (SDM) on December 5 last year, followed by several reminders.
The construction took place in the Deepa Sarai locality of the city.
Sambhal (UP), Aug 12 (PTI) Samajwadi Party Sambhal MP Zia-ur-Rehman Barq was fined Rs 1.35 lakh for allegedly carrying out construction without getting the building plan approved, authorities said on Tuesday.
Barq, however, told PTI Videos he had not received any notice for demolition.
'It is being said that there is an order to bulldoze my property, but I have not received any copy of the order. However, if our constitutional rights are being bulldozed, then these properties mean nothing,' he said.
Barq said he has faith in the police and judiciary, but if that goes, there will be no hope.
'But I still believe the judiciary has some integrity,' he said.
SDM Vikas Chandra told reporters that the matter was under consideration, and an order in relation to it was issued on Monday.
'The MP had sought an opportunity to submit a revised map, which was accepted. The compoundable portion of the construction was regularised upon payment of Rs 5,707. However, a penalty of Rs 1.35 lakh has been imposed for carrying out construction without approval or prior intimation,' he said.
Chandra said that a portion measuring one metre in length and 14 metres in width that falls in the setback area will not be compounded and must be removed within 30 days.
'If the construction is not removed within the stipulated time, action will be taken as per the rules to demolish it,' he added. PTI COR ABN VN VN
This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Four new semiconductor units worth Rs 4,594 crore to come up in Odisha, AP, Punjab: Union minister Ashwini Vaishnaw
Four new semiconductor units worth Rs 4,594 crore to come up in Odisha, AP, Punjab: Union minister Ashwini Vaishnaw

Time of India

time6 minutes ago

  • Time of India

Four new semiconductor units worth Rs 4,594 crore to come up in Odisha, AP, Punjab: Union minister Ashwini Vaishnaw

Academy Empower your mind, elevate your skills ETtech The Union Cabinet on Tuesday approved four semiconductor projects worth Rs 4,594 crore under the India Semiconductor Mission , taking the total number of approved chip manufacturing facilities in India to ten. The latest approvals push up the projected investments in semiconductor projects to about Rs 1.6 lakh crore across six newly approved proposals are from SiCSem Pvt Ltd , Heterogeneous Integrated Packaging Solutions Pvt Ltd (HIPSPL), Continental Device India Pvt Ltd and Advanced System in Package (ASIP) Technologies. While SiCSem and HIPSPL will set up units at Bhubaneshwar in Odisha, CDIL will expand its existing facility in Punjab's Mohali and ASIP will build a plant in Andhra Pradesh. The proposals are expected to generate 2,034 skilled jobs cumulatively."The complete ecosystem of design, wafer fabrication, packaging, manufacturing of components, assembly, testing, and high-volume final production, is in the works. This will help every sector and dimension of electronics manufacturing," union minister for electronics and information technology Ashwini Vaishnaw government hopes to give the semiconductor ecosystem a significant boost with the latest approvals, given that it will include the country's first commercial compound fab, as well as a highly advanced glass-based substrate semiconductor packaging products from these new plants will have applications in missiles, defence equipment, electric vehicles, railway, fast chargers, data centre racks, consumer appliances and solar power inverters, among others, Vaishnaw said. The new plants are expected to be ready for production in 2-3 years given that all government bodies have promised to provide expeditious permissions, he said, while pointing to previous such plants breaking ground in 6 terms of investment figures, the new plants are smaller than each of the six projects that are already coming up. Tata Electronics is investing Rs 91,000 crore in a fab facility in Gujarat's Dholera and Rs 27,000 crore for an semiconductor assembly and test facility at Morigaon, Assam, both announced in February last year. US-based Micron Technology is investing Rs 23,000 crore in an assembly, testing, marking and packaging (ATMP) plant at Sanand in Gujarat, announced in June SicSem is collaborating with Scotland's Clas-SiC Wafer Fab to establish a Rs 2,066 crore facility for silicon carbide-based compound semiconductors in Bhubaneswar. Set to be the first commercial compound fab in India, it will have an annual capacity of 60,000 wafers and a packaging capacity of 96 million chips."There is a world-wide movement from silicon to silicon carbide. It is a robust material and can sustain high voltage and temperatures. It is used in missiles, space equipment, satellites, rockets, railway engines and telecom tower equipment. Silicon carbide is a strategic necessity for our country,' the minister said. The Bhubaneshwar plant will also do research. 'At IIT-Bhubaneswar, a Rs 45 crore R&D unit has been set up," he will also be home to HIPSPL's vertically integrated advanced packaging and embedded glass substrate unit. A subsidiary of Albuquerque, New Mexico-based high-tech manufacturing firm 3D Glass Solutions Inc, HIPSPL will put in Rs 1,943 crore into the unit. It will be the first in the world to provide 3D packaging on a glass substrate on a commercial scale, Vaishnaw plant will have 11-13% equity investments each from US majors Intel, Lockheed Martin and Applied Materials, as well as venture capital funds, an official planned capacity of this unit will be nearly 70,000 glass panel substrates, 50 million assembled units and 13,200 3D heterogeneous integration modules every ASIP will set up a unit in Andhra Pradesh with an investment of Rs 468 crore, through a technology tie-up with South Korea's APACT, with an annual capacity of 96 million units. The manufactured products will find applications in mobile phones, set-top boxes, automobile applications and other electronic products. Venkata Simhadri, chief executive, ASIP Technologies, told ET: "Our OSAT/ATMP is focused on advanced (2.5D/3.0D) packaging of semiconductors, targeting data centres, high-speed communications and AI applications."New Delhi-based Continental Device will expand its discrete semiconductor manufacturing facility at Mohali with an investment of Rs 117 crore. It will manufacture high-power discrete semiconductor devices such as MOSFETs, IGBTs, schottky bypass diodes and transistors, both in silicon and silicon carbide. The annual capacity of this brownfield expansion will be 158.38 million general manager Prithvideep Singh told ET: "With this investment, we would expand our installed capacity of 600 million units to over 760 million units annually and sharpen our focus on silicon and silicon carbide chips."With a capacity of producing 24 billion chips, the six semiconductor projects that have already got approvals are in various stages of first-ever made in India chip will become available in the next 2-3 months, with three of the projects competing with each other, Vaishnaw a result of domestic chip production, the government expects the average value addition for electronics in India to rise to 30% in the future from 22% now, he said.

About 1.48 cr enrolled in govt schools: Min debunks Oppn claim of falling count
About 1.48 cr enrolled in govt schools: Min debunks Oppn claim of falling count

Time of India

time14 minutes ago

  • Time of India

About 1.48 cr enrolled in govt schools: Min debunks Oppn claim of falling count

1 2 Lucknow: Basic education minister Sandeep Singh on Tuesday hit back at the Opposition for claims that enrolments at govt schools were dipping and said about 1.48 crore students were enrolled in council schools as of now. "A staggering 1,04,93,389 children are currently enrolled in primary schools, supported by a dedicated workforce of 3,38,590 teachers and 1,43,450 Shiksha Mitras. The govt is committed to maintaining an optimal student-teacher ratio of 30:1 in primary education and 35:1 in upper primary education," he said in the Legislative Assembly. Accusing the opposition of politicizing educational reforms and misleading the public, he said in upper primary schools, 43,01,483 students are being educated by 1,20,860 teachers and 25,223 instructors. Overall, council schools boast an impressive enrollment of approximately 1.48 crore students, guided by over 6.28 lakh educators, including teachers, Shiksha Mitras and instructors. Addressing concerns about school mergers, Singh said institutions with fewer than 50 students within a 1Km radius have been paired with resource-rich schools to enhance facilities and accessibility. "These mergers have not led to any school closures, as all council schools remain operational under the basic education department. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Villas For Sale in Dubai Might Surprise You Dubai villas | search ads Get Deals Undo The vacant school premises are being repurposed in collaboration with the ICDS department to host pre-primary, play school and nursery classes, with over 3,000 schools already partnering with ICDS and 19,484 ACCEs appointed on a contractual basis," he said. On the issue of raising the admission age to four years, Singh said such a move was not feasible under the current Right to Education Act, which mandates a uniform system nationwide. He highlighted that education and nutrition for children aged 3 to 6 are already being effectively provided through anganwadi centres. Singh also took the opportunity to highlight the Yogi govt's achievements since 2017, noting that over 27 lakh new students have been enrolled this year alone. He contrasted this with the previous Samajwadi Party administration, during which 3.45 crore children reportedly dropped out of school. The current govt, he said, has launched successful campaigns to bring these children back into the educational fold. In a bid to further elevate educational standards, Singh announced the construction of model composite schools at a cost of Rs 30 crore each, with two such schools planned for every district. He reaffirmed the Yogi govt's commitment to taking education quality to unprecedented heights, ensuring that every child in UP has access to a world-class education. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.

The wait ends: Lucknow gets new Metro corridor, will ease traffic in Old City area
The wait ends: Lucknow gets new Metro corridor, will ease traffic in Old City area

Indian Express

timean hour ago

  • Indian Express

The wait ends: Lucknow gets new Metro corridor, will ease traffic in Old City area

The Union Cabinet, chaired by Prime Minister Narendra Modi, on Tuesday approved Rs 5,801 crore for a new 11-km corridor of Lucknow Metro, which has been pending for over six years. The East-West Corridor with 12 stations – 7 underground and 5 elevated – will connect Charbagh to Vasant Kunj and cover the most densely populated Old City area of the state Capital. This metro network will not only ease traffic congestion on the narrow roads of the Old City of Lucknow, but will also provide smooth connectivity to places like Chowk and Aminabad and historical tourist destinations such as Bada and Chhota Imambaras, Rumi Darwaza, Clock Tower, and Moosa Bagh. Thanking the Prime Minister for approving the project, Uttar Pradesh Chief Minister Yogi Adityanath said the decision will not only streamline the Capital's traffic system, but also open new avenues for employment, tourism, and investment. 'The project will elevate Lucknow to new heights by expanding its economic, social, and business infrastructure,' he added. The project will be implemented by the Uttar Pradesh Metro Rail Corporation (UPMRC), which is a joint venture of the Union government and the Uttar Pradesh government. The estimated time for completion of the new corridor is five years. Once operational, the new corridor, also called Phase-1B, will extend Lucknow's active Metro network to 34 km, linking key commercial hubs such as Aminabad, Yahiyaganj, Pandeyganj, and Chowk. It will also improve access to major healthcare institutions like King George Medical University and old city areas known for their rich heritage and culinary culture. By easing congestion on the busiest routes of old Lucknow, the Metro will reduce travel time with improved connectivity to the Amausi airport, Charbagh railway station, and bus terminals. The 11.165-km corridor will comprise 4.286 km of elevated and 6.879 km of underground sections. It will integrate with the existing North-South Corridor (Phase 1-A) at Charbagh, which will function as an interchange station, facilitating seamless transfers for commuters between the two corridors. The stations on the new corridor are Charbagh (underground), Gautam Budh Road (underground), Aminabad (underground), Pandeyganj (underground), City Railway Station (underground), Medical Chauraha (underground), Chowk (underground), Thakurganj (elevated), Balaganj (elevated), Sarfarazganj (elevated), Moosabagh (elevated), and Vasant Kunj (elevated). 'This new corridor will strengthen access to Old Lucknow's rich cultural heritage, cuisine, tourism destinations, and employment hubs for those living in newer parts of the city,' said Sushil Kumar, the Managing Director of UPMRC Limited. A senior UPMRC official said the process of floating tenders will begin very soon. 'The UPMRC has already undertaken significant groundwork and compiled essential research data for the corridor,' the official said. The Detailed Project Report (DPR) for the East-West Corridor was approved by the Uttar Pradesh government in March 2024, while the clearance from the Network Planning was granted on July 9, 2024. It was recommended by the Public Investment Board in May 2025. As of now, the Phase 1-A or North-South Corridor of the Lucknow Metro is operational, connecting the CCS Airport to Munshi Pulia, a distance of 22.87km. The corridor started in 2019 and has a total of 21 stations.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store