logo
Inuvialuit gas plant gets $100M loan from Canada Infrastructure Bank

Inuvialuit gas plant gets $100M loan from Canada Infrastructure Bank

CBC20-02-2025

The Canada Infrastructure Bank is loaning the Inuvialuit Regional Corporation $100 million to develop a natural gas well that is expected to provide the region with fossil fuel and synthetic diesel for more than 50 years.
The Inuvialuit Regional Corporation (IRC) unveiled its plan to develop the M-18 well south of Tuktoyaktuk back in 2020. The well had been drilled by Devon Energy and Petro-Canada in 2002 and was part of gas reserves in the Beaufort-Delta region left stranded when Esso and its partners abandoned their Mackenzie Valley Gas Project.
According to an approval from the Canada Energy Regulator last spring, the Inuvialuit Energy Security Project will convert natural gas into compressed natural gas, propane and synthetic diesel for power and heating in the Inuvialuit Settlement Region.
Hillary Thatcher, who heads up Indigenous investments for the Canada Infrastructure Bank (CIB), told CBC News that the Crown corporation's mandate is to "unstick" major investment projects that may be struggling to move ahead because of economic risks that deter private investors.
"This one in particular, there wasn't a lot of private loans available at reasonable or affordable rates that could help move this project in a timely fashion," she said.
That fact that it's a critical piece of infrastructure, that the project is led by Inuvialuit, and that it'll provide reliable electricity and heat for homes also factored into the investment decision, she said.
Inuvik Mayor Peter Clarkson told CBC News the project is great for both his community and Tuktoyaktuk. It'll lead to more employment, and is touted for reducing greenhouse gas emissions as well.
It means the region won't need to ship fuel up from the south.
"Trucking propane up the Dempster Highway has caused a lot of problems with road closures and the cost of all that trucking," said Clarkson. "I think a local source will be a win for everyone."
CBC News reached out to Inuvialuit Regional Corporation chair Duane Smith multiple times for an interview about the investment. He did not make himself available.
A joint press release from the corporation and the CIB said the project is expected to cost $293 million in total, and is expected to reduce greenhouse gas emissions by 40,000 tonnes per year. Thatcher said the IRC is investing the rest of the money needed to make it happen.
Thatcher said the fuel is expected to be sold to local businesses and will be sold to the Northwest Territories Power Corporation as well — which delivers power in the region.
Early construction work — like building a 4.2-kilometre road and a bridge to the well — has already started. Thatcher said it'll take two years to build the plant, and that construction will start this summer.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Canada's hidden heat: why regulatory harmonization is key to a geothermal breakthrough
Canada's hidden heat: why regulatory harmonization is key to a geothermal breakthrough

National Observer

timean hour ago

  • National Observer

Canada's hidden heat: why regulatory harmonization is key to a geothermal breakthrough

As the world races toward a clean energy future, Canada stands on the brink of a geothermal breakthrough. Beneath our feet lies a vast, untapped resource — clean, renewable and secure baseload power. Yet, despite our geological riches and world-class drilling expertise, Canada's geothermal sector remains dormant. One reason is the patchwork of inconsistent and incomplete regulations across provinces and territories — 10 jurisdictions across the country have no regulations in place for geothermal power production. Geothermal energy, which harnesses heat deep within the Earth to generate renewable heat and electricity, offers a rare combination of benefits. It is clean, reliable and, unlike other renewable energies dependent on the wind or the sun, it is available 24/7. It can be developed in partnership with Indigenous communities, supports rural economic development and reduces our reliance on fossil fuels. It can also be co-produced with other subsurface resources like lithium or hydrogen, creating new revenue streams and accelerating the energy transition. The world is experiencing a geothermal breakthrough — new technologies are emerging, costs are falling and the International Energy Agency estimates US$1 trillion worth of investments by 2035. But technology doesn't exist in a vacuum. Regulations and policies must keep up or risk becoming bottlenecks. Canada has already learned this lesson. A new report from the Cascade Institute, Groundwork: Regulatory Guidelines for Making Canada a Geothermal Powerhouse, makes one thing clear: if Canada wants to lead in geothermal energy, we must first lead in regulatory coherence for geothermal energy. Currently, only three provinces — British Columbia, Alberta and Nova Scotia — have geothermal regulations in place. Even among these, the rules vary widely in scope, clarity and effectiveness. This inconsistency creates uncertainty for developers, delays project timelines and increases financial risk — barriers that Canada can no longer afford if it hopes to compete in the global clean-energy economy. The report draws on lessons from the world's top 10 geothermal producers, from the United States to Indonesia, New Zealand to Türkiye. The common thread? Success hinges on clear, consistent and technology-agnostic regulations that reduce risk and attract investment. In the US, for example, federal lands are governed by standardized geothermal leasing rules, providing developers with predictable pathways to project approval. In Mexico, mandated decision timelines ensure regulatory efficiency. In New Zealand, Indigenous rights are integrated into geothermal governance, offering a model for Canada's own reconciliation efforts. Geothermal energy offers not just clean power, but energy security, economic development and a path to decarbonization, writes Emily Smejkal. Canada's federal structure means provinces and territories control their subsurface resources. But that doesn't mean we must accept regulatory fragmentation across the federation. Instead, we should embrace a coordinated approach — one that respects jurisdictional autonomy while aligning on core principles: clear resource definitions, fair tenure systems, streamlined permitting and early public engagement. For example, the federal government could establish a voluntary national geothermal code of practice — developed in collaboration with provinces, Indigenous groups and industry — that outlines best practices and model regulations. This would provide a common reference point, while allowing provinces to tailor implementation to local needs. The Cascade Institute's report offers a starting point with practical guidelines that provinces can adopt or adapt to. It's a blueprint for harmonization without homogenization — tailored to Canada's unique legal, environmental and cultural landscape. The stakes are high. Geothermal energy offers not just clean power, but energy security, economic development and a path to decarbonization. The United States is already adding geothermal electricity to power grids and data centres. With the right regulatory foundation, Canada could do the same, starting today — unlocking our potential and becoming a global leader in geothermal innovation. But the window is closing. Other countries are moving fast. If we want to compete, we must act now — and we must act together. The good news is that we don't have to start from scratch. Canada knows how to move fast when it wants to: the oil and gas sector can issue a drilling permit in Alberta in just 15 days. Shouldn't geothermal projects be able to do the same? Canada has the geology, the technology, and the policy expertise. What we need now is alignment across provinces. As Natural Resources Minister Tim Hodgson has said, "It is a time for bold action, clear decisions, and a renewed spirit of building." Consistent regulations can set the stage for industry to deliver on geothermal power and make Canada a clean energy superpower — using conventional energy expertise. It's time to lay the groundwork for Canada's geothermal future. That starts with bringing in effective, consistent regulations, from coast to coast.

South Dakota eager for Trump's statue garden near Mount Rushmore despite local opposition
South Dakota eager for Trump's statue garden near Mount Rushmore despite local opposition

Winnipeg Free Press

time6 hours ago

  • Winnipeg Free Press

South Dakota eager for Trump's statue garden near Mount Rushmore despite local opposition

SIOUX FALLS, S.D. (AP) — Officials in South Dakota are pushing hard to build President Donald Trump 's proposed National Garden of American Heroes in the Black Hills near Mount Rushmore, but the effort has sparked a backlash from Indigenous groups who see the area as sacred. A mining company has offered to donate 40 acres (16 hectares) less than a mile from Mount Rushmore, where massive sculptures of four of the nation's most prominent presidents are carved out of granite. 'The Black Hills mark the perfect location to achieve your vision for the National Garden of American Heroes,' Republican Gov. Larry Rhoden wrote in a letter to Trump. 'Together, we will make this project happen in a way that honors America's heroes, takes advantage of South Dakota's natural beauty, and incorporates the most iconic monument to our greatest leaders: Mount Rushmore National Memorial.' But the Black Hills have long been the subject of disputes between South Dakota and its tribes. The 1868 Treaty of Fort Laramie recognized that the Black Hills belong to the Sioux people, but the U.S. government seized the land less than a decade later to mine for gold. A 1980 Supreme Court decision found that the U.S. violated the treaty, but the tribes refused the $1.3 billion in compensation they were offered and maintained their rights to the land. Indigenous groups also oppose drilling project The mining company, Pete Lien & Sons, also has had conflicts with Indigenous groups in the area, most recently because of an exploratory drilling project for graphite near the sacred Lakota site of Pe' Sla. The company also is working with theme park designer Storyland Studios to build an attraction in the Black Hills opposed by some Indigenous groups. 'It's absurd for Storyland Studios and Gov. Rhoden to claim they care about preserving history while they watch Lien & Sons attempt to destroy Pe' Sla, and do nothing,' said Taylor Gunhammer, an organizer with the Indigenous advocacy group NDN Collective. 'They are the ones erasing and paving over history, not preserving it,' Gunhammer said. Rhoden's press secretary, Josie Harms, wrote in a statement that the garden 'will have no disruption to either state or tribal land' because the tract of land is owned by Chuck Lien, owner of Lien & Sons, and his family. Pete Lien & Sons did not respond to multiple requests from The Associated Press for comment. Trump's garden to feature 250 statues of historical figures Trump signed an executive order earlier this year to build the garden, to feature 250 life-size statues of historical figures in honor of the country's 250th birthday on July 4, 2026. Applications for sculptors are due in early July, though the administration no longer seeks to have it completed by next summer. The U.S. House has approved $40 million for the project, which is being overseen by the Department of Interior and the National Endowment for the Humanities. The Senate hasn't yet approved the funding. Trump first announced the project in his first term in a July 3, 2020, speech at Mount Rushmore at a time during the Black Lives Matter movement when some protesters were tearing down statues depicting Confederate generals and others. 'Angry mobs are trying to tear down statues of our Founders, deface our most sacred memorials, and unleash a wave of violent crime in our cities,' Trump said in that speech. 'But no, the American people are strong and proud, and they will not allow our country, and all of its values, history, and culture, to be taken from them.' In a 2021 executive order, Trump called for statues depicting a range of prominent figures, from the likes of Amelia Earhart, Muhammad Ali and Steve Jobs to more controversial ones like Christopher Columbus and President Andrew Jackson. No site was selected, however, and the garden was never funded by Congress. The Department of Interior said the revived garden project is still in the 'planning and discussion phase' and declined to say which sites it is considering. It's unclear if any other states are seeking to host the statue garden. As governor, Noem offered land for the garden When Homeland Security Secretary Kristi Noem was the state's governor, she offered the mining company's 40 acres of land in the Black Hills. Her successor, Rhoden, doubled down on that offer in his letter, emphasizing the site would be 'in sight of Mount Rushmore.' South Dakota Republican U.S. Rep. Dusty Johnson also wrote a letter to Trump, and said he will 'keep advocating for this iconic landmark to make its home in the Black Hills' in a social media post. Darren Thompson, director of media relations for the Indigenous nonprofit Sacred Defense Fund, called for more discussions with Indigenous groups in the Black Hills. 'It's a very touchy and sensitive subject that I think requires input by the local Indigenous people who have claim to the land and cultural ties to the land,' Thompson said.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store