logo
LRT maintenance, expansion work to disrupt service this summer

LRT maintenance, expansion work to disrupt service this summer

CBC30-05-2025
Ottawa's Confederation Line will be out of service for several days this summer as the east-west light rail track undergoes routine maintenance and other work related to its Stage 2 expansion.
In a memo to the mayor and council on Friday, Renée Amilcar, the city's general manager for transit services, said Line 1 will be close intermittently throughout June and July "for planned annual maintenance and required O-Train East Extension integration activities."
Replacement buses will be in service during any shutdowns.
June's maintenance work includes replacing rails in some locations, upgrades to the overhead catenary system and inspection of the tunnel at St-Laurent station.
Line 1 will be closed from Tunney's Pasture to Hurdman station after 9 p.m. on June 6. Trains will continue to run between uOttawa and Blair stations.
Service resumes the following day at Tunney's Pasture, but will end at uOttawa station after 10 p.m. Replacement buses will run between Rideau to Blair stations. The same is scheduled for June 8 after 7 p.m., and June 12 after 10 p.m.
There will be no Line 1 train service on the weekend of June 14 and 15, or on June 22 and 29 between 8 a.m. and noon.
In July, additional work on the Stage 2 extension will affect Line 1 service on the weekends of July 5 and July 26. Amilcar promised more detailed information on those service adjustments closer to those dates.
Amiclair warned additional disruptions are expected toward the end of summer and into the fall as the eastern extension undergoes testing.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Will Marine Atlantic's commercial rate not being cut impact people in N.L.? Not much, says this trucker
Will Marine Atlantic's commercial rate not being cut impact people in N.L.? Not much, says this trucker

CBC

time22 minutes ago

  • CBC

Will Marine Atlantic's commercial rate not being cut impact people in N.L.? Not much, says this trucker

While passengers riding the Marine Atlantic ferry will see a 50 per cent reduction in the cost of their ticket, commercial passengers and truckers won't see that same benefit. And while Newfoundland and Labrador's Minister of Jobs says it puts the province at a severe trade disadvantage, one trucker says it likely won't make much of a difference. "It was no big surprise, really. And it ain't going to impact the everyday lives of people here very much anyway, even if they're reduced," Tony Power, owner of operator of Power Trucking in Holyrood, told CBC News of the decision to not cut commercial rates for Marine Atlantic ferries. He pays $735 for a one way trip for his 75-foot truck. "If I reduce the rate to [merchants] for the ferry, they ain't going to take it off for the province anyway. There's just corporate greed across the board." Other ferries in Atlantic Canada and Quebec saw both commercial and passenger rates slashed in a decision by Prime Minister Mark Carney. Asked by CBC News why the change didn't apply to Marine Atlantic, St. John's East MP Joanne Thompson said rates needed to be frozen to protect other merchants in the industry. "Marine Atlantic is part of a broader chain of suppliers that bring commercial product in and out of the province. And we need to protect all players in the field, because we rely on the transfer of products from multiple sources," Thompson said. In response, Newfoundland and Labrador Jobs Minister Gerry Byrne said not lowering commercial rates goes against the announcement being a way to improve interprovincial trade efforts. "[Other Atlantic provinces] now have a very, very large competitive advantage over Newfoundland and Labrador in exports, in free trade, in competitiveness. Our economy now just took a blow," Byrne told CBC Radio Thursday. More passengers, delayed shipments? Power said he sided with Thompson's comments. He noted that if rates were to drop for travel on Marine Atlantic, other transporters would have to get the same cut and disrupt the overall market. But although he believes rates not being cut won't affect the price of food on the shelves, it could affect when it gets there — as a likely increase in passenger traffic could lead to less space being available for commercial trucks. "You're going to have less trucks per vessel," he said. "Those trucks that were there Tuesday for the [dangerous goods] crossing got to sit there 'till Wednesday. So, like, they got an extra two days on the wharf, which is delaying their products. It all got to come to the island, we got very few options to get to Newfoundland … that traffic got to come across that water." Power also expressed concerns with loosening interprovincial trade barriers, saying he believes it would impact the ability for local companies to prosper with business coming in from elsewhere.

Alberta minister threatens to axe bike lanes. Can he make his case?
Alberta minister threatens to axe bike lanes. Can he make his case?

CBC

timean hour ago

  • CBC

Alberta minister threatens to axe bike lanes. Can he make his case?

Social Sharing The provincial government that routinely demands Ottawa stay in its jurisdictional lane is keen to swerve into another jurisdiction's lanes. Bicycle lanes. Transportation Minister Devin Dreeshen has signalled he wants cities, particularly Edmonton and Calgary, to alter or remove any cycling lanes that impede automobile traffic — and avoid future bike lanes that do so. If they don't, Alberta might create the powers to do so itself. Alberta wouldn't be the first province to insert itself into the bike lane debate, following fellow conservative politicians in Ontario and, more recently, Nova Scotia. Whether it's dubbed ending the " war on cars" or fighting for " common sense," the fight over which road users get asphalt space has sounded similar across the country. But there are lessons in a new court ruling that struck down the largest province's bid to tear out bike lanes in Toronto, beyond the constitutional violations cited by the judge. Ontario launched its plan to dismantle Toronto bike-lane barriers by stating, repeatedly, that they worsen vehicle congestion by compromising vehicle space. It's the same logic Dreeshen applied last month, ahead of his meeting on the topic with Calgary Mayor Jyoti Gondek: "While we fund major infrastructure projects, like the Deerfoot [Trail], to improve traffic flow and reduce congestion, some local decisions are moving in the opposite direction, removing driving lanes." Cycle Toronto's court challenge of Ontario's "Reducing Gridlock, Saving You Time Act" got the courts to peel back the advice and research that underpinned Ontario's claims against bike lanes. Or, mainly, the lack thereof. "To the contrary, records produced by the government in this litigation show that the internal advice prior to passing Bill 212 was that protected bike lanes can have a positive impact on congestion and that removing them would do little, if anything, to alleviate gridlock, and may worsen congestion," Ontario Justice Paul Schabas' ruling states. Reaction pours in after Ontario judge blocks Ford's bike lane removal plan 3 days ago The decision refers to an engineering firm the province hired to study its car lane restoration. It reported: "While removing the bike lanes and replacing them with traffic lanes may increase the vehicle capacity along the immediate length of the roadway, the actual alleviation of congestion may be negligible or short-lived due to other confounding factors or induced demand." Induced demand refers to a well-travelled concept in transportation engineering that expanding road capacity will attract more automobiles, and therefore restore any congestion that briefly gets eliminated. (Meanwhile, Schabas also found that the health and safety risks to cyclists if they lost their barrier-protected routes through key parts of downtown Toronto was easily proven.) Would the rise and ebb in vehicle traffic behave any differently if the protective curbs for safer biking were removed in favour of an extra driving lane on 12th Avenue S. or Fifth Street S.W. in Calgary? Dreeshen emerged from his July 30 meeting with Calgary Mayor Jyoti Gondek pleased that she agreed with his interest in removing problematic bike lanes. "These bike lanes are not fixed," she told reporters after the sit-down. "If a bike lane is causing any concerns with congestion or parking, our traffic team is open to reviewing and making any necessary changes." The question, then, could come down to whether Calgary and Alberta could find a problem that Toronto and Ontario did not. In 2015, the city added its downtown network of temporary barrier-protected bike lanes on a few streets, as a pilot project. City officials measured the change in motorist travel times next to the bike-safety bollards. Along an eight-block stretch of Eighth Avenue S.W., there was no change in westbound traffic during the afternoon peak, and a 15-second decrease going the opposite way in the morning, according to a 2016 city report. What impact did the cycle lanes on Fifth Street have, for their 14 blocks? In the afternoon rush, commutes were up by 10 seconds. Morning travel times rose by 90 seconds along the downtown-spanning stretch of 12th Avenue S., including an added 13 seconds of delay at the intersection of two new bike lanes — but officials in that report pledged to review signal timing and road design before the lane would become permanent. Would these numbers justify the removal of bicycle lanes, having not persuaded council to do so back then? And what trade-offs are acceptable for creating a safe route for cyclists around the city's centre? The city also measures the number of cyclists (and other users) getting into and going through Calgary's business core. In that respect, the statistics show little before-and-after change, despite promoters' high hopes for a big boost to cyclist numbers. In 2014, before the protected bike lanes, the share of downtown commuters who came in or out on two wheels was 1.7 per cent. Rates rose before the pandemic to 2.7 per cent in 2017 — that still looks puny in relative numbers, but that's more than a 50 per cent jump in bike commutes. However, it dipped to 1.9 per cent in the 2024 transportation count. Dreeshen remarked on that figure after his meeting with Gondek. " So that means 98 per cent of people are commuting on a daily basis in their vehicles," he told CBC Radio's The Homestretch. "And obviously when you take away a driving lane for vehicles to put in a bike lane you're helping that small two per cent of commuters at the expense of drivers." Dreeshen is incorrect that it's two versus 98 per cent, as the non-cycling total also includes transit users and people walking into downtown; automobile drivers and passengers account for 59 per cent of downtown visits, according to city statistics. And there's another statistic that Gondek highlighted after seeing the minister: less than one per cent of Calgary's road surface is dedicated to bicycles. This certainly stands to become political fodder, coming into the fall's municipal votes. A conservative-aligned Edmonton mayoral candidate is echoing provincial rhetoric with a promise to halt any new bicycle lanes, and Calgary Coun. Dan McLean has said he wants the Eighth Avenue route axed and others reviewed. Meanwhile, the UCP issued a letter to members this week in Dreeshen's name, urging them to weigh in on a party survey's question about a potential bike lane crackdown — along with other questions inviting supporters to endorse existing UCP policies on taxes, school library content and private surgery clinics. "Of course, not everyone lives downtown. But many of us travel into the city for work, errands, or events, and we feel the impact too," Dreeshen's party email stated. This rhetoric gets at the heart of why provincial conservatives like to make hay about curbs and lane paint in a city's core, where voters tend to skew NDP or Liberal. Their own suburban and small-town base would likely be bothered by road space they can't drive on or park in, especially on a busy game night or lunch hour when they venture downtown. Just as planning the route for the Green Line LRT is supposed to be the city's jurisdiction, so is the addition and subtraction of bicycle lanes — though at least with the LRT, the Smith government can argue they're a funding partner. The Smith government's keen interest in downtown bicycle barriers comes alongside Municipal Affairs Minister Dan Williams' comments this week to Postmedia, about cities' business being provincial business. "Every single municipality in this province from the biggest cities to the smallest summer villages are creatures of legislation enacted by this legislature and this government has authority over those municipalities," he said. Technically, this is true, as it is in Ontario and elsewhere. It's not common, however, for provincial ministers or the premier to state this fact, given all its implications for interventions into the decisions of elected city or town councils. "I'd like to see the premier stay in his lane — and it's not a bike lane," a Halifax city councillor said about Nova Scotia Premier Tim Houston's threats to crack down on a cycling infrastructure proposal he has opposed.

Carney wants to spend an extra $9B on defence by April. Is that possible?
Carney wants to spend an extra $9B on defence by April. Is that possible?

CBC

timean hour ago

  • CBC

Carney wants to spend an extra $9B on defence by April. Is that possible?

Social Sharing Prime Minister Mark Carney's goal of hitting NATO's defence spending target of two per cent of gross domestic product this year will be an uphill — nearly impossible — battle, say experts and critics. An extra $8.7 billion is earmarked for defence spending by the Department of National Defence (DND) or other government departments, and $370 million for the Communications Security Establishment (CSE). Allies had been pushing Canada to meet NATO's goal for nearly 20 years — but actually actually doing so became imperative with Donald Trump in the White House. "Mark Carney's words are right, but he's gotta crack the whip here real quick," said John Ball, a former Canadian defence industry executive for nearly four decades and now consultant. NATO defines defence expenditures as payments made by a national government specifically to meet the needs of its armed forces, or those of allies and the alliance. Conservative MP and defence critic James Bezan warns it will be difficult for procurement officials inside government to reverse a long-standing culture of risk aversion, deferred decisions and allowing billions of dollars in lapsed spending. WATCH | Canadian defence spending expected to climb further: Canada, NATO allies agree to 5% defence spending target 1 month ago "By the time we get back into Parliament and a budget is passed, we're going to have half a year to spend money that the department won't be able to shovel out the door," Bezan said in an interview with CBC News. He wonders if the government will just engage in a "game of creative accounting" to meet its NATO commitments on paper. But some within the Canadian defence industry as well as DND and Public Services and Procurement Canada (PSPC) themselves point to existing mechanisms that can be leveraged to move quickly. Those include the use of standing offers, supply arrangements and pre-qualified vendor lists, as well as strategic partnerships with defence companies identified as centres of excellence, bilateral partnerships with other countries and the U.S. Foreign Military Sales (FMS) program. In situations that are truly time sensitive, the government can invoke a National Security Exception (NSE), Urgent Operational Requirements (UORs) or issue an Advance Contract Award Notice (ACAN). Although these have strict eligibility criteria and are not everyday tools. "If the government can demonstrate to us that this is in the interest of national security and there is a limited availability from a competitive factor, we would be open to those types of procurement," said Bezan. "But we can't make a habit of using NSEs as a way to … get the equipment that we require for the Canadian Armed Forces." Carney outlined on June 9 the general areas for increased investment, but gave no specifics. The list included better compensation; health care and infrastructure for personnel; new equipment such as aircraft, armed vehicles and ammunition; expanding the Canadian Coast Guard and moving it under DND; repairing and maintaining existing ships, aircraft and other assets; and developing new drones and sensors to monitor the sea floor and the Arctic. "We think it's largely going to be made up of items that are already identified or some that have been languishing in the procurement pipeline or projects that were underfunded," said Christyn Cianfarani, president and CEO of the Canadian Association of Defence and Security Industries (CADSI). Spending at home One way to spend faster would be to expand existing orders for armoured vehicles, ships and planes. For example, augmenting an existing contract for 360 light armoured vehicles from General Dynamics Land Systems in London, Ont. A company spokesperson says it would be able to quickly respond to contract amendment requests. But if the government intends to buy equipment not already on order or in the inventory, Cianfarani argues DND and PSPC have to change their approach. "There should not be a protracted procurement process," she said. "Probably a good portion of that $9 billion could be spent on Canadian firms." The prime minister has explicitly stated that part of the goal is to build up the Canadian defence industry, while acknowledging that continuing to do business with allies, including the U.S., will remain necessary. Cianfarani is far from alone in her concern over Canada's procurement process, one of the main reasons critics argue spending $9 billion in less than a year is doubtful. PSPC says its preference is for open, fair and competitive procurement. But many argue the process is overly long, and in some cases merely a box-ticking exercise where the winner is a foregone conclusion. "Why did they do it? They did it to appease," said Ball of those requests for proposals that already have a preferred candidate in mind. Cianfarani said it's frustrating for firms to spend millions on a bid for which they never had a real chance. She said it would be better to engage in "directed procurement" more often, as is done in other countries, where the government knows what it wants to invest in — and who the best suppliers are — and it then chooses them. But Bezan and others warn of the risk of boondoggles increases if the rush to spend money also means hurried oversight. "Talking about going to two per cent, and higher down the road, doesn't mean we give licence to spend money frivolously," said Bezan. 'Deliberate urgency' Those in the defence industry argue that they too want to make sure there's value for money. "I use the phrase 'deliberate urgency,' in that we need to think about how that money impacts the Canadian economic situation," said Chris Pogue, a former Royal Canadian Air Force pilot and now president of Calian Defence and Space. "I don't think we should let urgency overcome smart procurement, but things can move quickly if we have a sense of the direction we want to go and the kind of capability we need." Pogue said capabilities around sovereignty need to be homegrown, such as equipment and supplies needed for operations in the Arctic. An additional challenge is that most defence spending, at least on the capital side, is spent and accounted for over a number of years. But a senior government official says they truly plan to increase defence spending by $9 billion before April. That said, the government continues to describe both the amount and the deadline as targets, not certainties.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store