logo
Standard Uranium Announces Results of High-Resolution TDEM Survey at the Corvo Uranium Project, Northern Saskatchewan

Standard Uranium Announces Results of High-Resolution TDEM Survey at the Corvo Uranium Project, Northern Saskatchewan

Twenty-Nine Kilometres of Prospective Conductor Strike Length Confirmed
Vancouver, British Columbia--(Newsfile Corp. - July 23, 2025) - Standard Uranium Ltd. (TSXV: STND) (OTCQB: STTDF) (FSE: 9SU0) ('Standard Uranium' or the 'Company') is pleased to provide a summary of positive results from an airborne Time Domain Electromagnetic ('TDEM') survey completed on its 12,265-hectare Corvo Uranium Project ('Corvo', or the 'Project') earlier this year. The Project is currently under a three-year earn-in option agreement with Aventis Energy Inc. ('Aventis') (CSE: AVE).
Highlights:
'Upgrading and confirming the presence of conductive corridors across the Project is an ideal first step in our exploration efforts at Corvo. Along with the recently completed prospecting and sampling program this month, we've confirmed the presence of at least 29 kilometres of conductive stratigraphy as well as multiple radioactive occurrences at surface,' commented Sean Hillacre, President & VP Exploration of Standard Uranium, 'We look forward to receiving our prospecting assay results as we complete the first NI 43-101 report on the Project and plan our next phase of geophysical surveys building towards targets for the 2026 drill program.'
[ This image cannot be displayed. Please visit the source: https://images.newsfilecorp.com/files/10633/259717_efa2eaf104202b79_001.jpg ]
Figure 1. Regional map of the Corvo Project. The Project is located 45 km northeast of Atha Energy's Gemini Mineralized Zone ('GMZ') and 60 km due east of Cameco's McArthur River mine.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10633/259717_efa2eaf104202b79_001full.jpg
Corvo - 2025 Exploration Summary
From February 22 to March 16, 2025, the Company contracted Axiom Exploration Group Ltd. in partnership with New Resolution Geophysics to carry out a helicopter-borne Xcite™ TDEM and total field magnetic survey over the 12,265-hectare Corvo Project. The survey covered all 13 mineral claims of the Project, totalling 1,670.5 line-kms with a traverse line spacing of 100 m and tie-line spacing of 1,000 m over a ~122.65 km 2 area.
The helicopter-assisted survey was flown using the 30Hz Xcite™ TDEM system that simultaneously collects time domain electromagnetic, and magnetic data. The extensive survey was aimed to detect, locate, and characterize anomalous conductive and magnetic responses across the Corvo Property to aid in future exploration drill hole targeting.
The survey was completed on schedule, on budget, and successfully gathered high-resolution data to depth that will be key to identifying exploration targets under glacial cover through the delineation of conductive trends possibly related to packages of graphite and/or sulphide-bearing metasedimentary rocks commonly associated with uranium mineralization. Subsequent inversion, interpretation, and modeling of the recently acquired data in 3D software will allow the Company to prioritize newly identified exploration targets for follow-up diamond drilling programs.
The survey results confirm and improve upon the previously defined conductive corridors on the Project that overlap with historical geophysical and geochemical anomalies, in addition to drill holes with known uranium intercepts. The magnetic survey component of the TDEM survey contributes to definition of potential fault systems and structural trends not previously identified across the Project.
Supplementary geophysical surveys are being designed to further refine drill targets for an inaugural drill program. The Company plans to complete a high-resolution ground gravity survey across the main conductive trends on the Project, aiming to identify potential hydrothermal alteration halos which could be related to basement-hosted uranium mineralization.
From July 4 to July 16, 2025, the Company's technical team completed a detailed mapping, prospecting, and sampling program to ground-truth historical uranium showings at surface. Collected grab samples have been transported to Saskatchewan Research Council Geoanalytical Laboratories in Saskatoon, SK for geochemical analysis. Results will be released and incorporated into the first NI 43-101 technical report on the Project.
The Company believes the Project is highly prospective for the discovery of shallow, high-grade basement-hosted uranium mineralization akin to the Rabbit Lake deposit and the recently discovered Gemini Mineralized Zone. Located just outside the current margin of the Athabasca Basin, Corvo boasts shallow drill targets with bedrock under minimal cover of glacial till. Several outcrop showings of mineralized veins and fractures are present on the Project, notably the Manhattan Showing that returned historical sample results up to 59,800 ppm U at surface1 and has never been drill tested.
[ This image cannot be displayed. Please visit the source: https://images.newsfilecorp.com/files/10633/259717_efa2eaf104202b79_002.jpg ]
Figure 2. Summary map showing modern TDEM conductor traces on the Corvo project with Reduced to Pole (RTP) Total Magnetic Intensity (TMI) in the background.
To view an enhanced version of this graphic, please visit:
https://images.newsfilecorp.com/files/10633/259717_efa2eaf104202b79_002full.jpg
*The Company considers uranium mineralization with concentrations greater than 1.0 wt% U3O8to be 'high-grade'.
**The Company considers radioactivity readings greater than 300 counts per second (cps) to be 'anomalous'.
Qualified Person Statement
The scientific and technical information contained in this news release has been reviewed, verified, and approved by Sean Hillacre, P.Geo., President and VP Exploration of the Company and a 'qualified person' as defined in NI 43-101.
Historical data disclosed in this news release relating to sampling results from previous operators are historical in nature. Neither the Company nor a qualified person has yet verified this data and therefore investors should not place undue reliance on such data. The Company's future exploration work may include verification of the data. The Company considers historical results to be relevant as an exploration guide and to assess the mineralization as well as economic potential of exploration projects. Any historical grab samples disclosed are selected samples and may not represent true underlying mineralization.
References
1 SMDI# 2052: https://mineraldeposits.saskatchewan.ca/Home/Viewdetails/2052 & Mineral Assessment Report MAW00047: Eagle Plains Resources Inc., 2011-2012
About Standard Uranium (TSXV: STND)
We find the fuel to power a clean energy future
Standard Uranium is a uranium exploration company and emerging project generator poised for discovery in the world's richest uranium district. The Company holds interest in over 233,455 acres (94,476 hectares) in the world-class Athabasca Basin in Saskatchewan, Canada. Since its establishment, Standard Uranium has focused on the identification, acquisition, and exploration of Athabasca-style uranium targets with a view to discovery and future development.
Standard Uranium's Davidson River Project, in the southwest part of the Athabasca Basin, Saskatchewan, comprises ten mineral claims over 30,737 hectares. Davidson River is highly prospective for basement-hosted uranium deposits due to its location along trend from recent high-grade uranium discoveries. However, owing to the large project size with multiple targets, it remains broadly under-tested by drilling. Recent intersections of wide, structurally deformed and strongly altered shear zones provide significant confidence in the exploration model and future success is expected.
Standard Uranium's eastern Athabasca projects comprise over 42,384 hectares of prospective land holdings. The eastern basin projects are highly prospective for unconformity related and/or basement hosted uranium deposits based on historical uranium occurrences, recently identified geophysical anomalies, and location along trend from several high-grade uranium discoveries.
Standard Uranium's Sun Dog project, in the northwest part of the Athabasca Basin, Saskatchewan, is comprised of nine mineral claims over 19,603 hectares. The Sun Dog project is highly prospective for basement and unconformity hosted uranium deposits yet remains largely untested by sufficient drilling despite its location proximal to uranium discoveries in the area.
For further information contact:
Jon Bey, Chief Executive Officer, and Chairman
Suite 3123, 595 Burrard Street
Vancouver, British Columbia, V7X 1J1
Tel: 1 (306) 850-6699
E-mail: [email protected]
Cautionary Statement Regarding Forward-Looking Statements
This news release contains 'forward-looking statements' or 'forward-looking information' (collectively, 'forward-looking statements') within the meaning of applicable securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as of the date of this news release. Forward-looking statements include, but are not limited to, statements regarding: the timing and content of upcoming work programs; geological interpretations; timing of the Company's exploration programs; and estimates of market conditions.
Forward-looking statements are subject to a variety of known and unknown risks, uncertainties and other factors that could cause actual events or results to differ from those expressed or implied by forward-looking statements contained herein. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Certain important factors that could cause actual results, performance or achievements to differ materially from those in the forward-looking statements are highlighted in the 'Risks and Uncertainties' in the Company's management discussion and analysis for the fiscal year ended April 30, 2024.
Forward-looking statements are based upon a number of estimates and assumptions that, while considered reasonable by the Company at this time, are inherently subject to significant business, economic and competitive uncertainties and contingencies that may cause the Company's actual financial results, performance, or achievements to be materially different from those expressed or implied herein. Some of the material factors or assumptions used to develop forward-looking statements include, without limitation: that the transaction with the Optionee will proceed as planned; the future price of uranium; anticipated costs and the Company's ability to raise additional capital if and when necessary; volatility in the market price of the Company's securities; future sales of the Company's securities; the Company's ability to carry on exploration and development activities; the success of exploration, development and operations activities; the timing and results of drilling programs; the discovery of mineral resources on the Company's mineral properties; the costs of operating and exploration expenditures; the presence of laws and regulations that may impose restrictions on mining; employee relations; relationships with and claims by local communities and indigenous populations; availability of increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); uncertainties related to title to mineral properties; assessments by taxation authorities; fluctuations in general macroeconomic conditions.
The forward-looking statements contained in this news release are expressly qualified by this cautionary statement. Any forward-looking statements and the assumptions made with respect thereto are made as of the date of this news release and, accordingly, are subject to change after such date. The Company disclaims any obligation to update any forward-looking statements, whether as a result of new information, future events or otherwise, except as may be required by applicable securities laws. There can be no assurance that forward-looking statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements.
Neither the TSX-V nor its Regulation Services Provider (as that term is defined in the policies of the TSX-V) accepts responsibility for the adequacy or accuracy of this release.
To view the source version of this press release, please visit https://www.newsfilecorp.com/release/259717
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Trump Will Slow, but May Not Stop, the Rise of Electric Vehicles
Trump Will Slow, but May Not Stop, the Rise of Electric Vehicles

New York Times

time29 minutes ago

  • New York Times

Trump Will Slow, but May Not Stop, the Rise of Electric Vehicles

Sales of Teslas are plunging. General Motors and other automakers are increasing production of big pickups and sport utility vehicles. Republicans have killed incentives for electric vehicle purchases. Electric vehicles have clearly lost momentum in the United States. And combustion engine cars and trucks are enjoying a renaissance to the dismay of environmentalists who worry about air pollution and greenhouse gases. But there's reason to believe that electric vehicles will remain a significant part of the U.S. car market and that sales of these models will eventually grow again in the coming months. Electric vehicles from Tesla and some other automakers are less vulnerable to President Trump's tariffs than many conventional cars because more of their parts are made in the United States. Advocacy groups are conducting marketing campaigns to emphasize the lower fuel costs and other advantages of electric vehicles. And automakers appear to realize that they cannot give up on electric cars if they hope to remain competitive globally. Washington has become hostile to electric cars. Government policy on electric vehicles has reversed since Mr. Trump was elected. For consumers, the most visible change is the elimination of tax credits of up to $7,500 for electric vehicle purchases and leases. The credits, which Democrats put in place when Joseph R. Biden Jr. was president, will now expire at the end of September under the big policy and tax law that Mr. Trump signed in July. Want all of The Times? Subscribe.

Trump Tariffs Stun Swiss Investors Ahead of Monday's Market Open
Trump Tariffs Stun Swiss Investors Ahead of Monday's Market Open

Bloomberg

time29 minutes ago

  • Bloomberg

Trump Tariffs Stun Swiss Investors Ahead of Monday's Market Open

Swiss stock investors are bracing for Monday's market reopening after US President Donald Trump slapped a punitive 39% export tariff on the country, among the highest in the world. Trump's tariff rollout landed on a holiday, Swiss National Day, which means any market fallout will only be felt once trading resumes on Monday. While Trump's fresh tariff salvo left baseline rates unchanged for many of the US's trading partners, some like Canada and Switzerland got hit with significantly higher duties.

Carney wants to spend an extra $9B on defence by April. Is that possible?
Carney wants to spend an extra $9B on defence by April. Is that possible?

Yahoo

timean hour ago

  • Yahoo

Carney wants to spend an extra $9B on defence by April. Is that possible?

Prime Minister Mark Carney's goal of hitting NATO's defence spending target of two per cent of gross domestic product this year will be an uphill — nearly impossible — battle, say experts and critics. An extra $8.7 billion is earmarked for defence spending by the Department of National Defence (DND) or other government departments, and $370 million for the Communications Security Establishment (CSE). Allies had been pushing Canada to meet NATO's goal for nearly 20 years — but actually actually doing so became imperative with Donald Trump in the White House. "Mark Carney's words are right, but he's gotta crack the whip here real quick," said John Ball, a former Canadian defence industry executive for nearly four decades and now consultant. NATO defines defence expenditures as payments made by a national government specifically to meet the needs of its armed forces, or those of allies and the alliance. Conservative MP and defence critic James Bezan warns it will be difficult for procurement officials inside government to reverse a long-standing culture of risk aversion, deferred decisions and allowing billions of dollars in lapsed spending."By the time we get back into Parliament and a budget is passed, we're going to have half a year to spend money that the department won't be able to shovel out the door," Bezan said in an interview with CBC News. He wonders if the government will just engage in a "game of creative accounting" to meet its NATO commitments on paper. But some within the Canadian defence industry as well as DND and Public Services and Procurement Canada (PSPC) themselves point to existing mechanisms that can be leveraged to move quickly. Those include the use of standing offers, supply arrangements and pre-qualified vendor lists, as well as strategic partnerships with defence companies identified as centres of excellence, bilateral partnerships with other countries and the U.S. Foreign Military Sales (FMS) program. In situations that are truly time sensitive, the government can invoke a National Security Exception (NSE), Urgent Operational Requirements (UORs) or issue an Advance Contract Award Notice (ACAN). Although these have strict eligibility criteria and are not everyday tools. "If the government can demonstrate to us that this is in the interest of national security and there is a limited availability from a competitive factor, we would be open to those types of procurement," said Bezan. "But we can't make a habit of using NSEs as a way to … get the equipment that we require for the Canadian Armed Forces." Carney outlined on June 9 the general areas for increased investment, but gave no specifics. The list included better compensation; health care and infrastructure for personnel; new equipment such as aircraft, armed vehicles and ammunition; expanding the Canadian Coast Guard and moving it under DND; repairing and maintaining existing ships, aircraft and other assets; and developing new drones and sensors to monitor the sea floor and the Arctic. "We think it's largely going to be made up of items that are already identified or some that have been languishing in the procurement pipeline or projects that were underfunded," said Christyn Cianfarani, president and CEO of the Canadian Association of Defence and Security Industries (CADSI). Spending at home One way to spend faster would be to expand existing orders for armoured vehicles, ships and planes. For example, augmenting an existing contract for 360 light armoured vehicles from General Dynamics Land Systems in London, Ont. A company spokesperson says it would be able to quickly respond to contract amendment requests. But if the government intends to buy equipment not already on order or in the inventory, Cianfarani argues DND and PSPC have to change their approach. "There should not be a protracted procurement process," she said. "Probably a good portion of that $9 billion could be spent on Canadian firms." The prime minister has explicitly stated that part of the goal is to build up the Canadian defence industry, while acknowledging that continuing to do business with allies, including the U.S., will remain necessary. Cianfarani is far from alone in her concern over Canada's procurement process, one of the main reasons critics argue spending $9 billion in less than a year is doubtful. PSPC says its preference is for open, fair and competitive procurement. But many argue the process is overly long, and in some cases merely a box-ticking exercise where the winner is a foregone conclusion. "Why did they do it? They did it to appease," said Ball of those requests for proposals that already have a preferred candidate in mind. Cianfarani said it's frustrating for firms to spend millions on a bid for which they never had a real chance. She said it would be better to engage in "directed procurement" more often, as is done in other countries, where the government knows what it wants to invest in — and who the best suppliers are — and it then chooses them. But Bezan and others warn of the risk of boondoggles increases if the rush to spend money also means hurried oversight. "Talking about going to two per cent, and higher down the road, doesn't mean we give licence to spend money frivolously," said Bezan. 'Deliberate urgency' Those in the defence industry argue that they too want to make sure there's value for money. "I use the phrase 'deliberate urgency,' in that we need to think about how that money impacts the Canadian economic situation," said Chris Pogue, a former Royal Canadian Air Force pilot and now president of Calian Defence and Space. "I don't think we should let urgency overcome smart procurement, but things can move quickly if we have a sense of the direction we want to go and the kind of capability we need." Pogue said capabilities around sovereignty need to be homegrown, such as equipment and supplies needed for operations in the Arctic. An additional challenge is that most defence spending, at least on the capital side, is spent and accounted for over a number of years. But a senior government official says they truly plan to increase defence spending by $9 billion before April. That said, the government continues to describe both the amount and the deadline as targets, not certainties.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store