logo
Theyab bin Mohamed bin Zayed visits 4th Make it in the Emirates

Theyab bin Mohamed bin Zayed visits 4th Make it in the Emirates

Al Etihad22-05-2025

22 May 2025 17:26
ABU DHABI (ALETIHAD)His Highness Sheikh Theyab bin Mohamed bin Zayed Al Nahyan, Chairman of the Office of Development and Martyrs' Families Affairs, visited the fourth and final day of Make it in the Emirates 2025.Organised for the first time by ADNEC Group and hosted by the Ministry of Industry and Advanced Technology, in collaboration with the Ministry of Culture, the Abu Dhabi Investment Office, and ADNOC, the fourth edition of the event serves as a national industrial platform.His Highness' visit reflects the strategic significance of the event both nationally and regionally, aligning with the vision of the UAE's wise leadership to cultivate a pioneering, advanced, and globally competitive Emirati industrial base.Make it in the Emirates 2025 is one of the UAE's flagship platforms to advance economic diversification, localise cutting-edge technologies, and foster strategic partnerships that support the shift towards a sustainable, innovation-led economy.
The event highlights investment opportunities across 12 priority sectors and empowers industrial leaders and investors to harness the UAE's enabling business environment.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

DEWA adds 800MW of clean energy production capacity to its energy mix in 2025
DEWA adds 800MW of clean energy production capacity to its energy mix in 2025

Gulf Today

time35 minutes ago

  • Gulf Today

DEWA adds 800MW of clean energy production capacity to its energy mix in 2025

Saeed Mohammed Al Tayer, MD & CEO of Dubai Electricity and Water Authority (DEWA), announced that the total production capacity of the Mohammed Bin Rashid Al Maktoum Solar Park has increased to 3,860 megawatts (MW), using photovoltaic (PV) solar panels and concentrated solar power (CSP) technologies. Since the beginning of this year, DEWA has added 800MW from the sixth phase of the solar park, bringing clean energy's share to approximately 21.5% of its total production capacity. 'Our strategies and action plans are inspired by the vision and directives of His Highness Sheikh Mohammed Bin Rashid Al Maktoum, Vice President, Prime Minister, and Ruler of Dubai, to accelerate the transition towards a sustainable green economy and enhance Dubai's position as a leading global hub for clean and renewable energy. The Mohammed Bin Rashid Al Maktoum Solar Park is our key project to realise this vision and achieve the Dubai Clean Energy Strategy 2050 and the Dubai Net Zero Carbon Emissions Strategy 2050, which aim to provide 100% of the emirate's energy production capacity from clean sources by 2050. By 2030, the solar park's production capacity will reach 7,260MW, with clean energy making up 34% of DEWA's energy mix. This will reduce approximately eight million tonnes of carbon emissions annually,' said Al Tayer. The first phase of the Mohammed Bin Rashid Al Maktoum Solar Park, with a capacity of 13MW using PV solar panels, was commissioned in October 2013. In March 2017, the second phase, with a capacity of 200MW, was inaugurated. It also uses PV technology and was the first solar energy project of its kind in the region based on the independent power producer (IPP) model. In November 2020, the third phase of the solar park was inaugurated with a capacity of 800MW. This phase, also using PV technology, was the first in the Middle East and North Africa to use single-axis solar tracking to enhance energy generation. In December 2023, the fourth phase of the solar park was inaugurated with a total capacity of 950MW, combining CSP and PV panels. It uses three hybrid technologies to produce clean energy: 600MW from a parabolic basin complex, 100MW from a solar power tower and 250MW from PV solar panels. In June 2023, the fifth phase, with a capacity of 900MW, was inaugurated using photovoltaic panels. DEWA is currently working to complete the sixth phase of the solar park, with a capacity of 1,800MW using PV panels. DEWA has invited international developers to participate in the implementation of the seventh phase of the Mohammed Bin Rashid Al Maktoum Solar Park, which will have a capacity of 1,600MW. This phase, which is expandable to 2,000MW, will utilise PV solar panels and a battery energy storage system with a capacity of 1,000MW for six hours, providing a total storage capacity of 6,000 megawatt-hours. This will make it one of the world's largest solar-plus-storage projects. The phase will be implemented under the IPP model. WAM

Mohammed bin Rashid Launches Dubai Metro Blue Line to Transform Urban Mobility
Mohammed bin Rashid Launches Dubai Metro Blue Line to Transform Urban Mobility

Hi Dubai

time36 minutes ago

  • Hi Dubai

Mohammed bin Rashid Launches Dubai Metro Blue Line to Transform Urban Mobility

His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, has officially laid the foundation stone for the Dubai Metro Blue Line, marking a major leap forward in the emirate's transportation infrastructure. Spanning 30 kilometres with 14 new stations, the Blue Line is set to connect nine key districts and serve over one million residents by 2040. Expanding Dubai's Rail Network The Blue Line will link the existing Green and Red Lines through interchange stations at Al Jaddaf, Al Rashidiya, and International City 1. It will stretch from Creek Station to Centrepoint Station, covering strategic areas including Mirdif, Al Warqa, Dubai Silicon Oasis, and Academic City. The project also features the first-ever metro viaduct crossing Dubai Creek and the largest underground interchange station in the network. Once complete, Dubai's rail system will extend to 131 kilometres, with 78 stations and 168 trains, cementing the metro's role as the backbone of the city's mass transit system. A Record-Breaking Iconic Station Among the Blue Line's standout features is the Emaar Properties Station in Dubai Creek Harbour. Designed by global architectural firm Skidmore, Owings & Merrill, the 74-metre-tall structure will be the world's highest metro station. Covering 11,000 square metres, it will accommodate up to 160,000 passengers daily and is expected to see 70,000 daily users by 2040. The station's design merges luxury and function, featuring materials like Jura limestone, bronze panels, and granite flooring. Natural light, elegant spatial design, and sustainable architecture embody Dubai's vision of future-ready infrastructure. Driving Sustainability and Economic Growth The Blue Line supports the Dubai 2040 Urban Master Plan and the Dubai Economic Agenda D33, reinforcing goals such as reduced traffic congestion, increased land value near stations, and enhanced public mobility. According to RTA projections, the line will generate over AED 56.5 billion in total economic, environmental, and social benefits by 2040, with a benefit-cost ratio of 2.60. It will also help reduce traffic congestion by 20% in areas it serves and support Dubai's "20-minute city" vision, ensuring that essential services are within a short commute for residents. The Blue Line is designed to serve rapidly growing communities and economic hubs. It will provide direct metro access to Dubai International Airport and nine major areas, including Dubai Festival City, International City, and Academic City—which is projected to accommodate over 50,000 university students by 2029. The project also ensures seamless multimodal connectivity with dedicated bus bays, bike and e-scooter parking, and facilities for people of determination. A New Era in Public Transport Since its inauguration in 2009, the Dubai Metro has transported over 2.5 billion passengers and currently averages 900,000 daily riders. With the addition of the Blue Line, the network's capacity will exceed 850,000 passengers per day. Daily ridership on the Blue Line alone is expected to hit 200,000 by 2030 and 320,000 by 2040. The Blue Line is the fifth strategic addition to Dubai's transit system, following the Red and Green Lines, the Dubai Tram, and Route 2020. It represents a critical step toward making Dubai the world's best city to live in—an ambition firmly rooted in sustainable development and smart urban planning. News Source: Dubai Media Office

H.H. Sheikh Mohammed lays foundation stone for Dubai Metro Blue Line
H.H. Sheikh Mohammed lays foundation stone for Dubai Metro Blue Line

TAG 91.1

timean hour ago

  • TAG 91.1

H.H. Sheikh Mohammed lays foundation stone for Dubai Metro Blue Line

His Highness Sheikh Mohammed bin Rashid Al Maktoum, Vice President and Prime Minister of the UAE and Ruler of Dubai, attended the foundation stone laying ceremony of the new Dubai Metro Blue Line. The 30 km project is set to reshape mobility across nine key districts of the city. Part of the Dubai 2040 Urban Master Plan, the line will connect areas expected to be home to more than one million residents. It features 14 stations, including a world-record-setting structure: the Emaar Properties Station — soon to be the highest metro station in the world at 74 metres tall. Designed by global architectural firm Skidmore, Owings & Merrill, the same team behind the Burj Khalifa, the station is inspired by the idea of a 'crossing gateway'. The iconic station will cover 11,000 square metres, accommodate up to 160,000 passengers daily, and become a new urban icon for the city. It will serve the estimated 40,000 residents of Dubai Creek Harbour, in addition to visitors. With the completion of the Blue Line project, Dubai's rail network will expand to a total of 131 km, comprising 78 stations and 168 trains. . @HHShkMohd attends the foundation stone laying ceremony of the Dubai Metro Blue Line, a key milestone in the expansion of the city's public transportation network. Spanning 30 km and comprising 14 stations, the new line is set to transform mobility across nine key districts,… — Dubai Media Office (@DXBMediaOffice) June 9, 2025 . @HHShkMohd attends the foundation stone laying ceremony of the Dubai Metro Blue Line, a key milestone in the expansion of the city's public transportation network. Spanning 30 km and comprising 14 stations, the new line is set to transform mobility across nine key districts,… — Dubai Media Office (@DXBMediaOffice) June 9, 2025 The Blue Line will link Dubai's existing Green Line at Creek Station and with the Red Line at Centrepoint Station, connecting residential areas, educational hubs and development zones. The first route runs from Creek Interchange Station on the Green Line, located in Al Jaddaf, passing through Dubai Festival City, Dubai Creek Harbour and Ras Al Khor, before reaching International City 1, which includes an underground interchange station. The route continues towards International City 2 and 3, extending to Dubai Silicon Oasis and up to Academic City. This section spans 21 km and connects 10 stations. The second route of the Blue Line starts from Centrepoint Interchange Station on the Red Line in Al Rashidiya, passing through Mirdif and Al Warqa, concluding at International City 1 Interchange Station. This route spans 9 km in length and links four stations. The project also includes the construction of a metro depot at Al Ruwayah 3. By 2040, the Blue Line is expected to reduce traffic congestion by 20 per cent on serviced roads and provide a 20-minute direct connection to Dubai International Airport. Emaar has secured naming rights for its flagship station for 10 years, starting from the station's planned opening in 2029. Announcements about additional naming rights across the line are expected soon.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store