
Another indigenous warship joins Navy
The 6,670-tonne Himgiri has been built by the Kolkata-based Garden Reach Shipbuilders & Engineers (GRSE), while her predecessor Udaygiri was handed over by the Mumbai-based Mazagon Docks (MDL) on July 1. Both the warships are slated to be commissioned together towards end-August.
The 149-metre long Himgiri is the third of the seven frigates being constructed under Project-17A, four at MDL in Mumbai and three at GRSE in Kolkata, at an overall cost of Rs 45,000 crore.
The first was commissioned as INS Nilgiri in Jan, while the remaining four are to be progressively delivered by end-2026.
All these multi-mission frigates are packed with advanced sensors and weapons, including the BrahMos supersonic precision-strike cruise missiles whose range has been extended to 450-km from the original 290-km, and "designed to address current and future challenges in the maritime domain", an officer said.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
No annual fees for life
UnionBank Credit Card
Apply Now
Undo
For air defence, the frigates are equipped with Israeli-origin Barak-8 surface-to-air missile system, with an interception range of 70km against fighters, helicopters, drones and cruise missiles, among other weapons.
"These frigates reflect a quantum leap in naval design, stealth, firepower, automation and survivability, and are an admirable symbol of aatmanirbharta (self-reliance) in warship building," the officer said.
Overall, the 140-warship Navy has 58 ships and vessels under construction in Indian shipyards for over Rs 1.2 lakh crore, while another 31 warships are in the planning stage. This naval expansion is crucial to tackle the maritime collusiveness between Pakistan and China, which is making major strategic inroads into the Indian Ocean Region with the world's largest naval force of 370 warships.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


New Indian Express
26 minutes ago
- New Indian Express
Three nominations received for Vice President election on day one; rejected
NEW DELHI: Three persons submitted nominations for the September 9 vice presidential election on Thursday but all of them were rejected on technical grounds. The nominations were received from K Padmarajan of Salem in Tamil Nadu, Jeevan Kumar Mittal of Moti Nagar, Delhi and Naidugari Rajasekhar of Srimukhalingam Village in Andhra Pradesh. Their nominations were rejected under sub-section (4) of section 5B of the Presidential and Vice-Presidential Elections Act, which deals with the presentation of nomination papers and requirements for a valid nomination. Padmarajan and Mittal attached certified copies of the electoral roll of their respective Parliamentary Constituencies containing their names as registered voters, but these were dated prior to the issue of the election notification. Rajasekhar's copy was not certified by the Electoral Registration Officer (ERO), and he also failed to submit the mandatory security deposit of Rs 15,000.


Economic Times
26 minutes ago
- Economic Times
Elon Musk's Starlink to store Indian data locally: Govt
Synopsis Starlink's India operations will store network data and traffic locally, ensuring domestic user traffic isn't mirrored on foreign servers, according to Minister Pemmasani. Having secured necessary clearances, Starlink, along with Eutelsat OneWeb and Reliance Jio-SES JV, is poised to tap into India's rapidly growing satcom market. The sector is expected to generate employment through network installation, operation, and maintenance. TNN & Agencies The network data, traffic and other details accumulated by Elon Musk's Starlink satellite internet service from its operations in India will be locally stored, minister of state for communications Chandra Sekhar Pemmasani said in Parliament on user traffic will also not be mirrored to any system or server located abroad, Pemmasani said in a written reply in the Rajya Sabha. "Security conditions, inter-alia, include the establishment of earth station gateway(s) in India for providing satellite-based communication services with no user traffic originating from or destined for India to be routed through any gateway located outside India, no copying and decryption of the Indian data outside the country, and the Indian user traffic is not to be mirrored to any system/server located abroad," Pemmasani said. US-based Starlink is the third satcom operator after Bharti-backed Eutelsat OneWeb and Reliance Jio-SES JV to secure all clearances for offering commercial broadband from space services in India, a market expected to grow exponentially in the coming received its Global Mobile Personal Communication by Satellite (GMPCS) permit last month. The Indian National Space Promotion and Authorization Centre (IN-SPACe) authorised Starlink's Gen 1 constellation to provide satellite communication services in India. Gen 1 is Starlink's low-earth orbit (LEO) network of 4,408 satellites, which can offer 600 Gbps throughput in minister, meanwhile, said the satcom sector is expected to generate employment as it is an emerging area."Satellite-based communication services is an upcoming area and, as any new economic activity would do, it is also expected to generate employment in the country, as it involves, inter alia, the installation, operation and maintenance of the telecom network including user terminal equipment," Pemmasani said in his now needs to acquire spectrum from the government and establish ground infrastructure for its other global satcom majors-Jeff Bezos-owned Amazon Kuiper and Apple's satcom partner Globalstar-are also awaiting approvals from Indian authorities.
&w=3840&q=100)

Business Standard
35 minutes ago
- Business Standard
RBI to conduct two VRRR auctions to absorb ₹3 trillion from system
The Reserve Bank of India (RBI) plans to conduct two Variable Rate Reverse Repo (VRRR) auctions on Friday—of six-day and three-day tenures—to withdraw a total of Rs 3 trillion from the banking system. Market participants said the central bank aims to absorb the maturing amount of over Rs 2.8 trillion, while system liquidity remains in surplus at around Rs 4 trillion. 'They are trying to absorb the maturing amount,' said Gaura Sen Gupta, chief economist, IDFC FIRST Bank. 'We have around Rs 4 trillion of surplus liquidity and around Rs 1.6 trillion in the Standing Deposit Facility (SDF), and the tax payments are scheduled around 20 August, hence they want to absorb the excess funds over six and three days,' she added. The RBI's VRRR operations are aimed at absorbing surplus liquidity from the system and anchoring short-term rates closer to the policy repo rate.