
What each zodiac sign craves in a relationship
Every zodiac sign approaches love and relationships differently. Some crave emotional security, while others desire freedom, loyalty, or deep intellectual connection. Understanding what each sign truly needs in a relationship can help build deeper bonds and avoid misunderstandings.
Here's a look at what each zodiac sign longs for at the core of their romantic life:
Aries (March 21 - April 19): Aries seeks passion, excitement, and spontaneity. They crave a partner who can keep up with their adventurous spirit and challenge them without dulling their fire.
Taurus (April 20 - May 20): Taurus values stability and loyalty above all. They want a dependable partner who enjoys the little comforts of life and can build a future with them.
Gemini (May 21 - June 20): Geminis long for mental stimulation and fun. They crave engaging conversations, laughter, and a partner who embraces their playful and curious nature.
Cancer (June 21 - July 22): Cancer needs emotional depth and security. They desire a nurturing and understanding partner who makes them feel safe and valued.
Leo (July 23 - August 22): Leos crave attention, admiration, and loyalty. They want to be loved boldly and appreciated for who they are, while also showering their partner with warmth.
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
No annual fees for life
UnionBank Credit Card
Apply Now
Undo
Virgo (August 23 - September 22): Virgos seek reliability, honesty, and growth. They crave a partner who respects their need for order and supports their continuous self-improvement.
Libra (September 23 - October 22): Libra desires harmony, romance, and balance. They love the idea of true partnership and want someone who appreciates beauty, fairness, and connection.
Scorpio (October 23 - November 21): Scorpios crave intensity, loyalty, and deep emotional connection.
Trust is key—they seek a partner who can match their emotional depth.
Sagittarius (November 22 - December 21): Sagittarius values freedom and adventure. They crave a relationship that doesn't feel restrictive and allows room for exploration and growth.
Capricorn (December 22 - January 19): Capricorns long for commitment, respect, and ambition. They want a partner who shares their long-term goals and appreciates hard work.
Aquarius (January 20 - February 18): Aquarius craves individuality and understanding. They need a partner who respects their uniqueness and shares their vision for the future.
Pisces (February 19 - March 20): Pisces desires emotional connection, empathy, and unconditional love. They crave a soulful bond with someone who dreams as deeply as they do.
Discover everything about
astrology
at
Times of India
, including
daily horoscopes
for
Aries
,
Taurus
,
Gemini
,
Cancer
,
Leo
,
Virgo
,
Libra
,
Scorpio
,
Sagittarius
,
Capricorn
,
Aquarius
, and
Pisces
. Read your detailed
Horoscope Today
and
Horoscope Tomorrow
here.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
37 minutes ago
- Time of India
MBBS, BDS counselling delayed; admission on hold
Chennai: State selection committee said there will be delays in the start of counselling for MBBS/BDS admissions as Centre's medical counselling committee has put the process for the first round of admission on hold. On Monday, when the first round was already in progress, the committee announced that "choice filling and choice locking for round-1 has been put on hold." State selection committee officials said they were neither informed about this nor given a revised schedule until Tuesday. "We will not be able to start the counselling unless Centre completes round-1," said a senior official at the directorate. Central committee conducts counselling for 15% of all India quota seats in state-run medical colleges across the country, Central govt institutions, and deemed universities. "The students will take seats allotted to them in the round-1 of all India counselling if they get a seat of their choice. If they don't, they apply to the first round of state quota," the official said. "MCC releases a state schedule along with its own schedule in the beginning. When it makes changes, there is no information or instructions given to state," the official said. State committee admits students to 85% seats in govt colleges, and all seats in self-financing colleges and state private universities. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like I lost my IT job & thought I'd never be in tech again. Now I teach AI to students & adult learners CNA Read More Undo You Can Also Check: Chennai AQI | Weather in Chennai | Bank Holidays in Chennai | Public Holidays in Chennai On Tuesday, Central committee put out a notice that it has decided to extend the schedule of round-1 of UG counselling following requests from NRI/PwBD candidates and ongoing court cases. According to the revised schedule, round-1 registration deadline is 3pm on Wednesday, and payments must be made by 6pm. The choice filling and locking window will close by 8pm on Aug 7. MCC will process seats for round-1 until Aug 8 and declare results by Aug 9. Students have till Aug 18 to report to colleges. Officials say state committee will process seats and declare results this week to allow students to make informed decisions.


Time of India
an hour ago
- Time of India
NGT takes note of illegal jetty construction on Chilika banks
Cuttack: National Green Tribunal ( NGT ), East zone bench, in Kolkata has taken cognisance of a petition filed by Maa Kalijaee Motor Boat Workers Union, alleging illegal construction of a concrete jetty at Garadwar in Khurda district on the banks of Chilika lake. The bench comprising Justice B Amit Sthalekar (judicial member) and Dr Arun Kumar Verma (expert member) has issued notices to the Odisha State Coastal Zone Management Authority (SCZMA), Odisha State Pollution Control Board, Wetland Authority, and Chilika Development Authority, along with the private company behind the project. The matter was heard on Aug 1. The petitioners, represented by advocates Sankar Prasad Pani and Ashutosh Padhy, alleged that the jetty is being built without CRZ clearance and violates environmental norms. The petitioner society represents traditional boat workers and fisher folk who have relied on Chilika lake for generations. After fishing rights were suspended in 2017, many of them turned to tourism for livelihood. They have been demanding construction of a jetty to support their work, but claim their pleas have been ignored. The petitioners pointed out that the construction site falls under CRZ-III A and CRZ-IV B zones, where stringent restrictions are in place under the Coastal Regulation Zone Notification, 2019. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Online & Flexible degrees BITS Pilani Digital Apply Now They argued that while CRZ clearance was granted in 2022 for a floating jetty in Satapada (Puri district), no such permission exists for the ongoing construction in Garadwar. The petitioners had submitted a complaint to the Khordha district collector on April 11, 2025, demanding that work be stopped, but claimed that no action was taken. Protests were also reported at the site in May, followed by media coverage, but officials allegedly remained inactive. The bench noted that the issue merits serious consideration and directed all respondents of the notices to file their replies within four weeks. The matter has been listed for hearing on Sept 15. The petition has also sought directions for immediate halting of construction, demolition of the jetty, restoration of the site, and exemplary costs on the private firm for violation of CRZ norms and polluting the lake with untreated sewage. The disputed jetty is reportedly part of a Rs 14.67 crore luxury tourism project approved in principle by the Odisha govt in July 2024, featuring houseboats, cottages, a spa, and an adventure park.


Time of India
an hour ago
- Time of India
Blue Line ACs, ventilation system to undergo 500cr overhaul after 40 years
1 2 Kolkata: Metro Railway has decided to pump Rs 500 crore to revamp the four-decades old air-conditioning and ventilation system between Rabindra Sarobar and Belgachhia stations in the North-South or Blue Line. There are 15 underground stations in this line. Sources said the tendering for overhauling the environmental control system (ECS) or the air-conditioning system for 15 stations dotting the 16.9 km section from Rabindra Sarobar to Belgachhia that has been floated will also include replacing the AC and ventilation of the twin tunnels. "The work is mainly aimed at ensuring cooler stations and tunnels. It will also improve the fire safety system, making sure there is proper ventilation inside the tunnels when a fire breaks out and passengers need to be evacuated," a source said. He said the air-conditioning and ventilation will be upgraded in accordance with the current ambient temperature, which has risen considerably since metro first started operations around 40 years ago. The 15 underground Blue Line stations have centralised air-conditioning systems which include water-cooled chillers, towers, coils, and ducts through which cool air is released into the platform, concourse, and mezzanine levels. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Man Saves Pennies For 45 Years Despite Warning Undo "These are now considered primitive. They will have to be replaced with modern heating ventilation and air conditioning (HVAC) systems," an official said. You Can Also Check: Kolkata AQI | Weather in Kolkata | Bank Holidays in Kolkata | Public Holidays in Kolkata The Blue Line, currently running a 30 km underground and elevated corridor from Dakshineswar to Shaheed Khudiram, was India's first underground metro when its 3.4 km Esplanade-Bhowanipore stretch was launched on Oct 24, 1984. Over the years, it expanded north and southwards across the city's central axis. The southern terminal station at New Garia, Kavi Subhash, was shut down on July 28, when cracks were spotted on the columns supporting the Dakshineswar-bound or Up platform. Truncated operations are run till the second last southern station at Dhalai Bridge, Shaheed Khudiram. Metro Railway announced that the Kavi Subhash station will be rebuilt. The tender process is likely to end this month, following which the lowest bidder will start the work. Sources said the work will take at least four or five years to complete. "The work will be done while the commercial operations continue uninterrupted. Therefore, work will take time, unlike greenfield projects," a source said. Surface stations like Dum Dum, Noapara, and those between Mahanayak Uttam Kumar (Tollygunge), Shaheed Khudiram, and Kavi Subhash (New Garia) don't have cooling units. Officials said the basic design of North-South Metro, done by IIT-Kharagpur, was advanced, but the various equipment used in the metro system need upgradation and replacement due to the passage of time. Keeping this in mind, Metro Railway engaged RITES to conduct a health study.