logo
DRDO develops minefield marking system for Indian Army to enable faster, semi-automated deployment

DRDO develops minefield marking system for Indian Army to enable faster, semi-automated deployment

Time of Indiaa day ago
The
Indian Army
uses minefield marking as a critical activity to provide immediate warnings and visual signs near hazardous areas. This process, which involves placing pickets and tying ropes between them, establishes a physical barrier that distinguishes known danger zones from cleared areas. The task is currently supported by the Minefield Marking Equipment Mk-I, developed by R&DE (E).
To enhance the speed and reduce human effort in this process, the
Minefield Marking Equipment Mk-II
has been developed. The upgraded system is designed for semi-automatic operation with minimal manual intervention. It is capable of marking minefields more efficiently and is suitable for deployment in the plains of Punjab, as well as the semi-desert and desert regions of Rajasthan.
Minefield marking: System capabilities and operation
The Mk-II equipment is mounted on a
TATRA 6x6 vehicle
platform and can erect pickets at adjustable distances ranging from 10 to 35 metres in 5-metre intervals. While the system automatically rolls out nylon (polypropylene) ropes from its onboard spools, manual effort is still required to tie the ropes to the pickets at two height levels.
The equipment can continuously place up to 500 pickets in one operation. Depending on soil conditions and spacing, it can cover a perimeter of at least 1.2 kilometres per hour using 15-metre intervals. Ten spools are installed onboard, each carrying 1.5 kilometres of rope, enabling the system to support up to 15 kilometres of fencing in a single run.
Live Events
Also Read:
Watch: Indian Army deploy a three-tiered robotic counter-infiltration grid along the LoC against Pakistan
Technical specifications
The system comprises mechanical, electrical, electronic, and pneumatic sub-systems. Its mechanical elements include one
picket storage unit
, one Picket Holder Assembly (PHA), a pneumatic system, buffer assembly, ten rope spools with braking mechanisms, a container, a platform, one linear motor guide, and seating for two operators.
The electrical sub-system includes a power pack, Power Distribution Unit (PDU), linear motor, lighting, and ventilation. A linear motor is used to hammer the pickets into the ground, resting on a stopper when not in use. This stopper is actuated by an electrical actuator. A diesel generator (DG-set) supplies the required power, which is regulated by the
PDU
based on the equipment's demands.
The electronic sub-system features an auto/manual control panel, main and field junction boxes, a Distance Measuring Device (DMD), a driver's display panel, linear motor controller, and various sensors. These components support automatic operation of both electrical and pneumatic actuators.
All sub-systems are integrated within a box-type container welded to the platform, which is secured to the vehicle chassis using U-bolts.
Deployment and production plans
The system is capable of operating within a temperature range of 0 to 45°C and requires a crew of four, including one driver and three operators.
The Research & Development Establishment (Engineers), Pune, a premier
DRDO
laboratory, has invited Expressions of Interest (EOI) from Indian industries with the technical and financial capability to manufacture and supply the Minefield Marking Equipment Mk-II with the requisite quality standards.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

'It's not enough': Satya Nadella says Bill Gates' idea that made him world's richest person is now obsolete
'It's not enough': Satya Nadella says Bill Gates' idea that made him world's richest person is now obsolete

Time of India

time4 hours ago

  • Time of India

'It's not enough': Satya Nadella says Bill Gates' idea that made him world's richest person is now obsolete

Microsoft CEO Satya Nadella has reflected on the company's 50-year evolution, stating that Microsoft must once again fundamentally reinvent itself. In an internal memo, Nadella noted that even Bill Gates' revolutionary 'software factory' vision, which created the world's largest software company, is now outdated in the era of artificial intelligence. Independence Day 2025 Op Sindoor to water cutoff: PM Modi slams Pak in I-Day speech GST reforms by Diwali to cut daily-use taxes: PM Modi Terrorism, tech, more: PM's I-Day speech highlights The timing of Nadella's message is notable, coming as Microsoft celebrates record financial results while simultaneously implementing workforce reductions—a paradox the CEO termed 'the enigma of success in an industry that has no franchise.' Satya Nadella says Microsoft can no more be a software factory, must become an intelligence engine 'When Bill founded Microsoft, he envisioned not just a software company, but a software factory, unconstrained by any single product or category. That idea has guided us for decades. But today, it's no longer enough,' Nadella wrote. He outlined Microsoft's new mission: empowering all 8 billion people worldwide to create their own tools through AI, rather than merely building tools for specific roles. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like He is our only child, we cannot see him suffer. Help us! Donate For Health Donate Now Undo Nadella highlighted the paradox Microsoft faces—achieving success by every measure while reducing its workforce. 'This is the enigma of success in an industry that has no franchise value,' he explained, noting that technological progress is 'dynamic, sometimes dissonant, and always demanding.' AI transformation becomes core priority for Microsoft The company is now restructuring around three key priorities: security, quality, and AI transformation. Nadella stressed that Microsoft will 'reimagine every layer of the tech stack for AI,' spanning infrastructure, applications, and agents. He likened the current moment to the PC revolution of the early 1990s, when personal computers became household and workplace staples. Live Events 'Just imagine if all 8 billion people could summon a researcher, an analyst, or a coding agent at their fingertips,' Nadella wrote, emphasizing the transformative potential of AI. He noted that Microsoft's differentiation will come from integrating these technological layers to deliver seamless end-to-end experiences, while maintaining a platform-focused strategy that creates ecosystem opportunities for partners and developers globally. [With TOI inputs]

Maruti Suzuki e-Vitara first production unit to be produced on 26 August
Maruti Suzuki e-Vitara first production unit to be produced on 26 August

Hindustan Times

time4 hours ago

  • Hindustan Times

Maruti Suzuki e-Vitara first production unit to be produced on 26 August

Maruti Suzuki India Limited is preparing to launch its first electric vehicle in the Indian market. We saw the e-Vitara back at the Bharat Mobility Global Expo 2025. The manufacturer will start the production of the e-Vitara on 26 August and soon after that the launch should also happen. What are the rivals of the Maruti Suzuki e-Vitara? Maruti Suzuki e-Vitara will go against the Hyundai Creta Electric, Tata Curvv EV, Mahindra BE 6 and the MG Windsor EV. How is the design of the Maruti Suzuki e-Vitara? The Maruti Suzuki e-Vitara showcases a contemporary and high-end design, featuring LED projector headlights, Y-shaped LED daytime running lights (DRL), and front fog lamps. As an electric vehicle, it does away with the necessity for a conventional radiator grille. The side profile is highlighted by black cladding and 18-inch aerodynamically optimized alloy wheels. At the back, it displays a black bumper and three-piece LED taillights linked by a glossy black strip. Also watch: E-Vitara, Maruti's first EV, debuts at Auto Expo | Over 500 km range | Bharat Mobility Global Expo How is the interior and features of the Maruti Suzuki e-Vitara? The interior of the e-Vitara features a dual-spoke steering wheel along with a dual-screen dashboard configuration. This setup comprises a 10.1-inch touchscreen infotainment system and a 10.25-inch digital instrument cluster. Additional interior elements include rectangular air conditioning vents, an auto-dimming interior rearview mirror (IRVM), semi-leatherette seating, an electronic parking brake, and a wireless phone charging station. Furthermore, the vehicle is equipped with a panoramic sunroof, a driver's seat that can be adjusted in 10 ways, and ventilated front seats. Standard safety features include seven airbags, a 360-degree surround view camera, and Advanced Driver Assistance Systems (ADAS) technology. Also Read : Maruti Suzuki Ertiga & Baleno updated with six airbags as standard, prices hiked What is the battery, range and specs of the Maruti Suzuki e-Vitara? The UK market model indicates battery options with capacities of 49 kWh and 61 kWh. The smaller 49 kWh battery provides a WLTP range of up to 344 km and is equipped with a front-wheel drive configuration that generates 142 bhp and 193 Nm of torque. In contrast, the larger 61 kWh battery is offered in both front-wheel drive and all-wheel drive configurations. The front-wheel drive variant achieves a range of up to 426 km, powered by an electric motor that produces 171 bhp and 193 Nm of torque. The all-wheel drive version enhances power to 181 bhp and 307 Nm of torque, with a range of up to 395 km. Charging durations for the batteries differ: the 49 kWh battery charges from 10 percent to 100 percent in 6.5 hours using a 7 kW AC charger and in 4.5 hours with an 11 kW charger. The 61 kWh battery requires approximately nine hours and 5.5 hours, respectively. Additionally, both battery packs can achieve an 80 percent charge in 45 minutes when utilizing a DC fast charger. Check out Upcoming EV Cars in India. First Published Date:

Once India's chip ambition got burnt. Now it's being revived
Once India's chip ambition got burnt. Now it's being revived

Time of India

time5 hours ago

  • Time of India

Once India's chip ambition got burnt. Now it's being revived

Prime Minister Narendra Modi on Friday used his 79th Independence Day address from the Red Fort to declare that 'by the end of this very year, a Made in India chip , built in India by the people of India, will arrive in the market". He underlined India's renewed focus on semiconductor manufacturing, while pointing to decades of missed opportunities in the sector. 'When we talk about different dimensions of technology, I want to draw your attention. Let me take semiconductors as an example… files related to semiconductors started moving 50–60 years ago… but the idea was stalled, delayed, and blocked,' PM Modi said at Red Fort. 'The very idea of semiconductors was aborted before it could take shape. Today, decades later, many countries have mastered semiconductors and established their strength in the world', he said. The Prime Minister said his government had 'freed ourselves from this burden' and was advancing semiconductor work 'in mission mode.' He announced that 'six different semiconductor units are coming up on the ground' and that 'four new units have already been given the green signal.' Independence Day 2025 Op Sindoor to water cutoff: PM Modi slams Pak in I-Day speech GST reforms by Diwali to cut daily-use taxes: PM Modi Terrorism, tech, more: PM's I-Day speech highlights The remarks come days after the Union Cabinet approved four new semiconductor projects under the India Semiconductor Mission (ISM), with total investments of around Rs 4,600 crore. Very few know that India's first semiconductor, also called chip, manufacturing unit in Mohali came up years before the world's biggest chipmaker TSMC was set up. But several issues plagued India's semiconductor aspirations including a suspicious fire at the Mohali unit which still makes chips but solely for the government's space and military uses and of capacity that goes decades back. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Orthopedic Knee Surgeon: Suffering From Pain After Age 50? Do This Every Morning Wellnee How India's chip pioneer failed to take off The idea for an indigenous chip fabrication unit and research centre was mooted in 1976, and Semi-Conductor Laboratory (SCL) started manufacturing in 1984 from a 51-acre facility at Mohali, Punjab. Three years before today's global chip leader Taiwan Semiconductor Manufacturing Company (TSMC) set up shop, India had its own fabrication facility in 1984. That was a big head start for India. Live Events Today, TSMC makes 54% of the world's semiconductor chips, while SCL is just managing to stay afloat while supplying only to the government. TSMC clocked $60 billion in revenue in 2022, and SCL just $5 million. Had it not been for a mysterious fire that destroyed the SCL facility at Mohali in 1989, India would have become a global leader in semiconductors. No one knows if the fire was an accident or an act of sabotage. The fire stopped India's progress in chip making. It took nearly a decade for SCL to restart operations in 1997. In 2010, an Israeli company, Tower Semiconductors, helped SCL build a 180-nm chip. Since then, SCL has little more to boast of while the world has moved on to sub-10 nm chips, the most advanced at present. In its nearly four decades of existence, SCL has had little to flaunt as its capabilities beyond defence and space sectors, which depend on SCL for chips meant for strategic uses. It has stuck to 180nm chips over the years due to lack of government attention. It has been facing even basic challenges a public sector unit faces in India. Innovation would have required huge investment as well as partnerships with industry leaders. SCL has seen three management changes — from the Department of Electronics under which it started in 1984 to the Department of Space in 2006. In February 2022, it was brought under the Ministry of Electronics and Information Technology (MeitY). The mounting losses of SCL have been due to the inefficient functioning and alarmingly low levels of capacity utilisation, as per experts. Lack of marketing efforts and non-existent customer support meant the SCL's capacity utilisation hit an abysmal 10%. However, under its plan to make India a semiconductor manufacturing hub, the government has now turned its focus on SCL. The government has earmarked about $1 billion for the modernisation of the facility. The $1 billion fund is part of the government's $10 billion semiconductor incentive package to set up a semiconductor chip fabrication ecosystem in the country. The government has received nine bids, from companies including the Tata Group and Tower Semiconductor, for the overhaul of SCL, ET had reported in February, based on information from people aware of the matter. As per the ministry of electronics and information technology officials, the goal is to bring the technology of the facility on a par with industry standards of legacy nodes of 65 and 40 nm to start with, before aiming for more cutting-edge nodes. Why is India so keen to make chips? In recent years, India has made a concerted effort to establish its semiconductor industry, recognizing the growing importance of semiconductor manufacturing in the global economy. Semiconductors are critical components that power everything from credit cards to smartphones to fridges to cars to missiles to aeroplanes. Their demand is expected to continue soaring in the coming decades. India's push to develop this sector stems from several factors, including the desire to reduce dependency on imports, boost technological self-reliance, create jobs, and foster innovation. Chip manufacturing capacity also translates into great strategic edge and leverage over other countries. A year after the government brought the PLI scheme for chip manufacturing in 2021 to attract foreign investments, it came up with the Design Linked Incentive (DLI) scheme, primarily to provide subsidies to domestic companies in chip design. The government is now planning the second phase of the India Semiconductor Mission which will focus on getting all component companies, raw material suppliers, etc. to India. Tata-Powerchip Semiconductor Corp's semiconductor fabrication unit (fab) at Dholera, the Tata group's outsourced semiconductor assembly and test (OSAT) unit in Assam, and the CG Power-Renesas Group combine's OSAT unit at Sanand place India on two different points in the semiconductor value chain: fabrication and OSAT. American company Micron is already building its OSAT plant at Sanand in Gujarat. Another American semiconductor company, AMD, has inaugurated in Bengaluru its largest global design centre. India already has a large pool of talent for chip design, another point in the chip value chain. This big start to chip-making in India shows the country's urgency to make the most of the supply chains shifting away from China and Taiwan which China threatens to annexe. Modi's comments on chips during his Independence Day speech come days after the Union Cabinet approved four semiconductor projects worth Rs 4,594 crore under the India Semiconductor Mission, taking the total number of approved chip manufacturing facilities in India to 10. The latest approvals push up the projected investments in semiconductor projects to about Rs 1.6 lakh crore across six states.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store