logo
Peak Minerals Announces New Lidar Survey at the Tapanahony Project in Suriname

Peak Minerals Announces New Lidar Survey at the Tapanahony Project in Suriname

Lidar survey being used to plan upcoming drilling program and develop new targets for evaluation
Vancouver, British Columbia--(Newsfile Corp. - April 1, 2025) - Peak Minerals Ltd. (CSE: PEK) ('Peak' or the 'Company'), announces that ground work has started in preparation for an upcoming drill program at its Tapanahony Project in Suriname.
The Tapanahony Project, located in the eastern part of the Marowijne greenstone belt, is a highly prospective exploration property located on both sides of the Tapanahony River in Suriname. Peak contracted with Altoa of French Guiana to conduct a high-resolution Light Detection and Ranging (Lidar) survey. Altoa is in the process of completing the survey and has provided provisional datasets to aid in drill planning and interpretation.
An aim of the Lidar survey is to acquire high-resolution geospatial data for topographic mapping and detailed terrain analysis. The resulting data significantly supports ongoing drill planning by providing accurate terrain models, and enhancing the understanding of surface features essential for project planning, exploring, drilling and decision-making processes. Roads, trails and areas of mining by the local community are highly visible and accurately located (Figure 1).
Dr. Dennis LaPoint, Peak's Suriname Country Manager, commented: 'In preparation for the upcoming drill program planned in the next few months, a Lidar survey, sampling, field mapping and logistical ground work are underway. The Lidar results have uncovered three parallel structures to the north and south of the existing visible previously drilled structure, significantly enlarging the existing targets. Lidar resolution also better defined mineralized structures, timing of structural events, and the evolution of the landscape allowing us to more efficiently explore.'
Figure 1: Mineralized corridor of the Randy-Poeketi trend.
To view an enhanced version of this graphic, please visit:
Lidar interpretation has identified at lease three levels of terraces developed during sea level change. The Tapanahony River is eroding and dissecting these terraces and as Figure 2 illustrates, the Randy trend and a parallel trend noted in historical auger data is not visible southeast of the Randy's Pit because a high-level older terrace covers the gold mineralization. This observation warrants significant additional exploration of the Poeketi-Randy trend along strike to southeast and northwest and will be used in exploration methodology for drill evaluation.
Figure 2: Two mineralized trends parallel to the Randy's Pit with high level terrace identified by Lidar survey to southeast.
To view an enhanced version of this graphic, please visit:
In this deeply weathered environment, lithologies and structure are obscured when mapping, but are visibly shown on the Lidar survey. In Figure 3, a contact of the volcanic-sedimentary rocks with a granitic intrusion is easily recognized by the contrasting topographic expression. Near this contact are a cluster of workings in weathered bedrock produced by local miners. Like other deposits on the Guiana Shield, such as at Founders Metals' Antino Project (see Founders Metals website, March 25, 2025, Combes technical presentation), multiple host structures and lithologies for gold are being located for further evaluation and drilling at Peak's Tapanahony Project.
[ This image cannot be displayed. Please visit the source: https://images.newsfilecorp.com/files/10997/246870_a9e11c71a4578973_005.jpg ]
Figure 3: Two mineralized trends around granite-volcanic-sedimentary rock contact with new pits mapped from new Lidar elevation model.
To view an enhanced version of this graphic, please visit:
Qualified Person
Dr. Dennis J. LaPoint, Ph.D., P.Geo. a 'qualified person' as defined under National Instrument 43‐101, has reviewed and approved the scientific and technical information in this release. Dr. LaPoint has reviewed and verified the data disclosed in this release and no limitations were imposed on his verification process.
About Peak Minerals
Peak Minerals Ltd. is engaged in the business of mineral exploration and the acquisition of mineral property assets in Canada. Its objective is to locate and develop economic precious and base metal properties of merit and to conduct its exploration on the Aida Project. The Aida Property consists of 5 mineral claims covering an area of 2,335.42 ha located on the Shuswap Highland within the Kamloops Mining Division.
Peak Minerals is also actively exploring the highly prospective Tapanahony Project located in the heart of Suriname's modern-day gold rush. Tapanahony covers 29,000 hectares in one of the oldest and largest small-scale mining areas in Suriname. There is significant production from saprolite by local miners along a 4.5km trend where several areas of mining have been opened.
On Behalf of the Board of Directors
Jonathan Yan
Director
Information Contact
Oscar Louzada, CEO
+31 6 25438975
THE CANADIAN SECURITIES EXCHANGE HAS NOT APPROVED NOR DISAPPROVED THE CONTENT OF THIS PRESS RELEASE.
Forward-looking statements
Certain statements in this release constitute 'forward-looking statements' or 'forward-looking information' within the meaning of applicable securities laws including, without limitation, the timing, nature, scope and details regarding the Company's future exploration plans. Such statements and information involve known and unknown risks, uncertainties and other factors that may cause the actual results, performance or achievements of the Company, its projects, or industry results, to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements or information. Such statements can be identified by the use of words such as 'may', 'would', 'could', 'will', 'intend', 'expect', 'believe', 'plan', 'anticipate', 'estimate', 'scheduled', 'forecast', 'predict' and other similar terminology, or state that certain actions, events or results 'may', 'could', 'would', 'might' or 'will' be taken, occur or be achieved. These statements reflect the company's current expectations regarding future events, performance and results and speak only as of the date of this release.
Forward-looking statements and information contained herein are based on certain factors and assumptions regarding, among other things, the estimation of mineral resources and reserves, the realization of resource and reserve estimates, metal prices, taxation, the estimation, timing and amount of future exploration and development, capital and operating costs, the availability of financing, the receipt of regulatory approvals, environmental risks, title disputes and other matters. While the Company considers its assumptions to be reasonable as of the date hereof, forward-looking statements and information are not guarantees of future performance and readers should not place undue importance on such statements as actual events and results may differ materially from those described herein. The Company does not undertake to update any forward-looking statements or information except as may be required by applicable securities laws.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Aftermath Silver Continues to Intersect High Grade Silver, Copper and Manganese at Berenguela, Peru
Aftermath Silver Continues to Intersect High Grade Silver, Copper and Manganese at Berenguela, Peru

Yahoo

timean hour ago

  • Yahoo

Aftermath Silver Continues to Intersect High Grade Silver, Copper and Manganese at Berenguela, Peru

Vancouver, British Columbia--(Newsfile Corp. - June 9, 2025) - Aftermath Silver Ltd. (TSXV: AAG) (OTCQX: AAGFF) (the "Company" or "Aftermath Silver") is pleased to provide the final assay results from its Phase 2 diamond drill program at the Berenguela silver-copper-manganese deposit located in the Department of Puno in southern Peru. Results are included for 12 holes from the initially planned 60-hole (4,600m) program of diamond core drilling which the company increased to 82 holes (5,329m of core) due to positive geological results. Hole AFD139, on the most easterly section of drilling, returned a significant copper intercept indicating that the mineralisation remains open to the east. Highlights of the current drilling include: AFD144 intersected 13.8m @ 558g/t Ag + 3.16% Cu + 15.06% Mn from 23.2m down hole, including 5.6m @1053g/t Ag + 2.85% Cu + 15.80% Mn from 31.4m down hole; AFD139 cut 68.9m @ 78g/t Ag + 1.19% Cu + 6.03% Mn from 6.4m down hole; Ralph Rushton, President and CEO, commented "These results conclude our reporting of our Phase 2 diamond drill program and a revised mineral resource estimate including both Phase 1 and Phase 2 drilling is now underway. We are very pleased to report that one of our most easterly holes, AFD139, cut strong mineralisation and the resource appears to remain open to the east. This is an area we will tackle in the future as access needs prepared due to steep topography. Our technical team also clarified the geology of some faulted areas by targeted drilling." Full results for 12 holes are in the table below and a table of collar coordinates and hole azimuths is appended at the end of this release. Drill collar plans and cross sections are available at this link: Table 1. Assay results, holes AFD104, AFD120-AFD121, and AFD137 - AFD145 Hole From To Width1 (m) Ag g/t Cu % Mn % Zn % Recovery (%) Voids* Far Eastern Ridge AFD120 0.00 32.50 31.10 143 0.71 7.00 0.79 95 1.4 and 86.60 101.05 14.45 71 0.22 1.40 0.22 93 - AFD121 0.00 38.50 36.90 110 0.38 2.44 0.32 90 1.6 Hole From To Width1 (m) Ag g/t Cu % Mn % Zn % Recovery (%) Voids* AFD139 6.40 75.30 68.90 78 1.19 6.03 0.55 100 - AFD140 46.50 49.30 2.80 42 0.62 2.56 0.14 100 - Syncline - flank of Southeastern Antiform AFD104 0.00 1.90 1.90 33 1.34 16.25 0.78 100 - AFD137 0.00 10.10 10.10 79 1.14 8.46 0.60 79 - AFD138 0.00 15.30 15.30 115 0.95 7.73 0.47 100 - AFD141 0.90 13.40 11.00 178 0.87 12.17 0.51 100 1.5 AFD142 4.00 21.40 16.40 60 0.90 13.33 0.79 92 1.0 Central Fault Zone AFD143 3.65 8.10 4.45 50 0.65 2.78 0.17 100 - and 20.50 52.50 30.60 129 1.48 15.64 0.50 100 1.4 inc. 45.70 50.29 4.50 340 4.00 11.36 0.30 100 - AFD144 23.20 37.00 13.80 558 3.16 15.06 0.20 100 - inc. 31.40 37.00 5.60 1053 2.85 15.80 0.21 100 - AFD145 0.00 36.45 29.05 233 1.59 16.06 0.29 100 7.4 inc. 13.75 23.40 9.65 276 3.58 21.14 0.27 100 - *Reported intersection widths are shorter than total widths drilled where voids due to historic underground mining activity were encountered during drilling. Voids were measured and discounted from the intersection width with no dilution of the reported grades. In AFD121 a void of 1.4m was encountered in an area of near-surface working resulting in an intersection width of 31.10m. In AFD121 a void of 1.6m was encountered in an area of near-surface workings resulting in an intersection width of 36.90m. In AFD141 a void of 1.5m was encountered in an area of near-surface workings resulting in an intersection width of 11.0m. In AFD142 a void of 1.0m encountered in an area of sub-surface workings resulting in an intersection width of 16.40m. In AFD143 a void of 1.4m was encountered in an area of sub-surface workings resulting in an intersection width of 30.60m. In AFD145 voids totalling 7.4m were encountered in areas of near- and sub-surface workings resulting in an intersection width of 29.05m. Berenguela mining: from 1913 until 1965 approximately 500,000 tons was mined from 17,700m of underground workings and open pit operations which equates to roughly 1.2% of the 2023 M&I resource inventory. Aftermath obtained complete plans of underground workings which were incorporated into resource modelling where practical and appropriate and underground mining depletion subtracted from the mineral resource. All open pits have been surveyed in detail as part of the general site layout that defines topography and surface mining depletion.1 The drilling was carried out at a high angle to the stratigraphically controlled mineralization and intersections can be assumed to equate approximately to true thickness. Drilling was carried out at a high angle to mineralization controls and intersections are assumed to equate to true thickness. Drill sections are available on Aftermath's website ( or by clicking here. The weighted average core recovery in the mineralized intersections was 97%. Some lower recoveries were returned close to surface (0 to 5m) in initial drilling runs, and around some underground workings. The geology of each hole is summarised at the end of this release. Objectives of Drilling Holes AFD120, AFD121 and AFD139 and AFD140, targeted the far eastern ridge area of the existing mineral resource. These were sited to extend and define the margin of mineralization whilst converting inferred resources to indicated and/or measured categories where appropriate. Holes AFD139 and AFD140 are the furthest east drilled by Aftermath and essentially the last holes drilled eastwards on the Berenguela drill grid. As noted above, significant mineralisation was encountered which remains open eastwards. Steep topography prevented further drilling without access preparation which is planned in due course. AFD104, AFD137, AFD138, AFD141 and AFD142 targeted a syncline that forms the southern flank of the southeastern antiform. Shallow, thin mineralisation was expected. The holes were designed to extend and define the margin of mineralization whilst converting inferred resources to indicated and/or measured categories where appropriate. Holes AFD143 to AFD145 targeted the core mineralisation of the central area close to old open pits: a structurally complex zone with faulting parallel to section separating Domain 1 to the west and Domain 2 to the east. The results of this and previous drilling confirmed that the mineralisation traversed the faulting, hence the faulting must be an older event than the intense MnO alteration and associated silver-copper mineralisation. Drilling was designed to convert inferred resources to indicated and/or measured categories where appropriate. Geology The host stratigraphy at Berenguela comprises folded thickly bedded, light grey limestones and dolomitized limestones. Several large bodies of black massive, patchy, and fracture-controlled manganese oxide replacement mineralization with associated silver, copper, and zinc enrichment, occur in the folded limestones. Mineralization largely follows stratigraphy and is typically conserved as eroded synform or antiform remnants, usually exposed at surface and with fold axes trending 105-120 degrees. Generally, the limestone is underlain by a transitional arenite unit overlying evaporites in footwall formations. In the area covered by this release, the eastern margin of mineralization, the arenites and evaporites were not generally encountered suggesting the limestone sequence is thickening eastward and downfaulted in blocks. Historical mapping and resource modelling shows mineralization to extend for roughly 1,300m along strike. The recent drilling has extended the strike length to at least 1550m with a maximum width of 400m in the central part, 250m in the western part, and 50m in the faulted section between the western and central parts. This includes a previous 100m gap or discontinuity now closed by drilling. The drilling was carried out at a high angle to the stratigraphically controlled mineralization and intersections are approximately true thickness. The geology of each hole is summarized at the end of this release. QA/QC Sample preparation and assaying was carried out in Peru by ALS Peru S.A ("ALS"). ALS preparation facilities in Arequipa and assaying facilities in Lima both carry ISO/IEC 17205 accreditation. Logging and sampling were carried out by Aftermath geological staff at the Limon Verde camp in Santa Lucia. Samples were transported to Arequipa and delivered to ALS for preparation and subsequent assaying of pulps in Lima. During the preparation stage, quartz-washing was performed after each sample to prevent carry-over contamination. Initial assaying was done using a four-acid digestion and ICP-AES multielement analysis for 31 elements. Over limit samples (Ag > 100 g/t, Mn>8,000 ppm, Cu/Zn >10,000ppm) were reanalysed using 4 acid-digestion and ore-grade ICP-AES analysis. Any Ag samples reporting >1,500 g/t Ag are further analysed using fire assay with gravimetric finish. Any Ag samples reporting >10,000 g/t are further analysed using concentrate assay methods. A selection of pulps will be submitted to an umpire laboratory to perform check analyses and verify QA/QC implemented in the project. Every batch of 20 samples submitted for assay contained 1 certified reference material (CRM), 1 coarse blank, 1 pulp blank and 1 duplicate core sample, OR 2 CRMs, 1 coarse blank, 1 duplicate core sample. Aftermath commissioned OREAS to prepare 3 different CRMs made from samples of Berenguela mineralization, so they are compositionally matched to the mineralized core. In the assays performed for this news release, 65 CRMs and 33 coarse blanks were inserted and 4 elements checked (Ag/Cu/Mn/Zn) - a total of 392 checks in total. The CRMs generally performed well, and 2 CRM fails were observed in total. Two fails were reported for low range Mn. No fails were reported for Ag or Cu. Mid-range Cu, Mn and Ag CRMs reported to specification limits. High grade Cu, Mn, and Ag CRMs reported to specification limits. All pulp blanks and coarse blanks reported to specification limits. 32 duplicate samples were submitted and >80% reported repeat assays with a difference <25% to original assay. Qualified person Michael Parker, a fellow of the AusIMM and a non-independent director of Aftermath, is a non-independent qualified person, as defined by National Instrument 43-101. Mr. Parker has reviewed the technical content of this news release and consents to the information provided in the form and context in which it appears. Berenguela Project: Background The Company has an option to acquire a 100% interest in Berenguela through a binding agreement with SSR Mining. Berenguela hosts a potentially open-pittable silver-copper-manganese resource close to Santa Lucia in Puno province, southern Peru. Silver, copper and manganese have crucial industrial applications in the clean energy and battery spaces. Copper and manganese have been designated critical metals by the US government and the European Union. The project is less than 6km from road, rail and power lines and 4 hours from Arequipa by sealed road. Aftermath published a resource estimate in March 2023 based on over 300 core and RC holes. Metallurgical test work is underway adding to historic work, with the goal of producing silver and copper metal and a commercial battery-grade or fertilizer-grade manganese product. About Aftermath Silver Ltd. Aftermath Silver is a leading Canadian junior exploration company focused on the development of critical metals projects. Aftermath is a preeminent silver development company with significant leverage to copper and high purity battery grade manganese. The Company's flagship asset is the Berenguela silver, copper and manganese deposit located in Southern Peru. ON BEHALF OF THE BOARD OF DIRECTORS "Ralph Rushton" Ralph RushtonCEO and Director604-484-7855 The TSX Venture Exchange does not accept responsibility for the adequacy or accuracy of this release. Cautionary Note Regarding Forward-Looking Information Certain of the statements and information in this news release constitute "forward-looking information" within the meaning of applicable Canadian provincial securities laws. Any statements or information that express or involve discussions with respect to interpretation of exploration programs and drill results, predictions, expectations, beliefs, plans, projections, objectives, assumptions or future events or performance (often, but not always, using words or phrases such as "expects", "is expected", "anticipates", "believes", "plans", "projects", "estimates", "assumes", "intends", "strategies", "targets", "goals", "forecasts", "objectives", "budgets", "schedules", "potential" or variations thereof or stating that certain actions, events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved, or the negative of any of these terms and similar expressions) are not statements of historical fact and may be forward-looking statements or information. These statements involve known and unknown risks, uncertainties and other factors that may cause actual results or events to differ materially from those anticipated in such forward‐looking statements. Although the Company believes the expectations expressed in such forward‐looking statements are based on reasonable assumptions, such statements are not guarantees of future performance and actual results or developments may differ materially from those in the forward‐looking statements. Factors that could cause actual results to differ materially from those in forward‐looking statements include, but are not limited to, changes in commodities prices; changes in expected mineral production performance; unexpected increases in capital costs; exploitation and exploration results; continued availability of capital and financing; differing results and recommendations in the Feasibility Study; and general economic, market or business conditions. In addition, forward‐looking statements are subject to various risks, including but not limited to operational risk; political risk; currency risk; capital cost inflation risk; that data is incomplete or inaccurate. The reader is referred to the Company's filings with the Canadian securities regulators for disclosure regarding these and other risk factors, accessible through Aftermath Silver's profile at There is no certainty that any forward‐looking statement will come to pass, and investors should not place undue reliance upon forward‐looking statements. The Company does not undertake to provide updates to any of the forward‐looking statements in this release, except as required by law. Cautionary Note to US Investors - Mineral Resources This News Release has been prepared in accordance with the requirements of Canadian National Instrument 43-101 - Standards of Disclosure for Mineral Projects (''NI 43-101'') and the Canadian Institute of Mining, Metallurgy and Petroleum Definition Standards, which differ from the requirements of U.S. securities laws. NI 43-101 is a rule developed by the Canadian Securities Administrators that establishes standards for all public disclosure an issuer makes of scientific and technical information concerning mineral projects. Canadian public disclosure standards, including NI 43-101, differ significantly from the requirements of the United States Securities and Exchange Commission (the "SEC"), and information concerning mineralization, deposits, mineral reserve and resource information contained or referred to herein may not be comparable to similar information disclosed by U.S. companies. Table 2. Collar locations, depths, azimuth and dips. Section 1300E Hole WGS84 X WGS84 Y WGS Z DEPTH (m) AZ DIP AFD145 331669.047 8268301.77 4211.331 45.8 7 -45 Section 1350E Hole WGS84 X WGS84 Y WGS Z DEPTH (m) AZ DIP AFD144 331734.894 8268316.99 4215.64 50.4 187 -45 Section 1400E Hole WGS84 X WGS84 Y WGS Z DEPTH (m) AZ DIP AFD143 331770.859 8268236.12 4229.363 67.2 7 -45 Section 2050E Hole WGS84 X WGS84 Y WGS Z DEPTH (m) AZ DIP AFD137 332416.073 8268145.539 4201.996 21.5 7 -45 AFD138 332415.916 8268144.007 4201.96 19.2 0 -90 AFD141 332405.574 8268111.786 4204.672 23.1 7 -45 AFD142 332405.237 8268110.411 4205.375 34.4 0 -90 Section 2150E Hole WGS84 X WGS84 Y WGS Z DEPTH (m) AZ DIP AFD104 332524.019 8268088.55 4149.3546 25 0 -90 AFD120 332530.824 8268224.121 4199.051 115.3 7 -70 AFD121 332530.65 8268223.143 4199.049 50.4 187 -65 Section 2350E Hole WGS84 X WGS84 Y WGS Z DEPTH (m) AZ DIP AFD139 332740.436 8268316.427 4127.386 92.1 7 -45 AFD140 332740.504 8268314.971 4126.037 89.2 187 -55 Summary Geology AFD104 was drilled in a valley in the core of a syncline forming the southern flank of the southeastern antiform. Mineralisation was only preserved to a depth of 1.90m, followed by highly weathered beige dolomite to 14.5m where a sharp contact to intercalated footwall arenites and evaporites occurs. These units persist to 25.00m EOH. AFD120 intersected two zones of mineralisation. The upper zone of mineralisation was intersected form surface to 32.50m, intersecting limestone from surface with moderate to massive MnO replacement of altered limestone and some vein hosted and disseminated MnO. The lower zone of mineralisation was intersected from 86.60m to 101.05m characterised by disseminated MnO and weak to moderate MnO replacement of limestone. AFD121 intersects mineralisation from surface to 38.50m, massive MnO replacement of limestone from surface and disseminated or fracture hosted MnO dominating downhole. End of hole (EoH) occurs in weakly altered limestone at 50.40m. AFD137 intersects mineralisation from surface to 10.10m characterised by vein hosted MnO and disseminate MnO in altered limestone. Limestone grades into arenites and transitional arenites below mineralised intersection with historic workings occuring at the contact. EoH in transitional arenites at 21.50m. AFD138 intersects mineralisation from surface to 15.30m, with vein hosted MnO, massive MnO replacement, and disseminated MnO, with visible Cu (malachite) in limestone. Limestone grades into transitional arenites below mineralised intersection until EoH at 19.20m. AFD139 intersects mineralisation from 6.40m to 75.30m. Intercalating altered and unaltered limestone hosts vein hosted and moderate replacement of limestone by MnO, mostly within altered limestone beds. In unaltered limestone, MnO primarily occurs as fracture hosted. Some visible CuO occurs downhole of intersection. AFD140 cut mineralisation from 46.50m to 49.30m, characterised by weak MnO replacement of altered limestone and minor CuO. AFD141 cut mineralisation from 0.90m to 13.40m characterised by massive MnO replacement of limestone with some ferruginous alteration, and intervals of low replacement but increased vein hosted MnO and disseminated MnO with visible CuO in altered limestone. Below intersection MnO content decreases downhole into weakly altered limestones grading into transitional arenites until EoH at 23.10m. AFD142 cut mineralisation from 4.00m to 21.40m characterised by moderate to massive replacement of altered limestone with some disseminated visible CuO. AFD143 cut two zones of mineralisation. The upper mineralisation occurs from 3.65 to 8.10m, characterised by vein hosted MnO and patchy replacement in weakly altered limestone. The lower zone of mineralisation occurs from 20.50m to 52.50m, include a higher zone of mineralisation from 31.40m to 37.40m. The intersect is characterised by zones of moderate to massive MnO replacement of limestone with ferruginous alteration intercalated with zones of altered limestone and arenites with vein hosted and disseminated MnO, and visible CuO. The higher intercept occurs within one of these altered limestone and arenite zones, with vein hosted and patchy MnO and pyrite. AFD144 cut mineralisation from 23.20m to 37.00m including a zone of higher mineralisation from 31.40m to 37.00m, characterised by limestone intercalated with minor arenites and siltstones, moderately to intensely altered with vein hosted MnO, disseminated MnO, patchy MnO replacement and dm scale intervals of moderate to massive MnO replacement of host limestone. Some visible CuO occurs throughout. The zone of higher mineralisation occurs within limestone hosting moderate to patchy MnO replacement. AFD145 cut mineralisation from surface to 36.50m including a zone of higher mineralisation from 13.75m to 23.40m, characterised by patchy and massive MnO replacement of altered limestone with replacement decreasing strength downhole, dominated instead by disseminated MnO and minor vein hosted MnO from 24.50m. The intersect of higher mineralisation occurs within the stronger patchy and massive MnO replacement, with visible disseminated and vein hosted CuO. Alteration and MnO content continue to decrease downhole and transitions sharply to tectonic breccias of the footwall at 38.40m until EOH at 45.80m. To view the source version of this press release, please visit Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

American Business Expo Award 2025 Unites Global Entrepreneurs and Honors Breakthrough Innovations
American Business Expo Award 2025 Unites Global Entrepreneurs and Honors Breakthrough Innovations

Yahoo

time2 hours ago

  • Yahoo

American Business Expo Award 2025 Unites Global Entrepreneurs and Honors Breakthrough Innovations

Bringing together founders, investors, and changemakers from five countries, the event celebrated entrepreneurial talent with the power to influence markets around the globe Aventura, Florida--(Newsfile Corp. - June 9, 2025) - In a fast-moving global economy, the American Business Expo Award 2025 set the stage for bold ideas, cross-border collaboration, and industry-defining achievements. The event was held at Hilton Aventura, bringing together over 1,000 entrepreneurs, innovators, and investors from across the globe for a full day of panels, keynote speeches, networking sessions, and the prestigious awards ceremony. With participants from the USA, Ukraine, Georgia, Norway, and Israel, the event spotlighted the power of international collaboration in shaping the future of business. American Business Expo Award 2025 To view an enhanced version of this graphic, please visit: The American Business Expo Award is an annual celebration of innovation, impact, and leadership across global business. Founded to highlight exceptional talent across sectors, it serves as a platform for recognition, connection, and global opportunity. This year's award featured 100+ nominations across diverse industries such as agritech, sustainable manufacturing, digital education, social impact, and consumer innovation, reflecting the broad scope of today's business landscape. A total of 20 outstanding winners were recognized, selected by a global jury of 40+ industry experts. Each entry was assessed on four key criteria: innovation, business impact, growth, and execution. The evaluation process was designed to highlight projects with real business impact, sustainable growth, and strong execution. Among this year's distinguished winners: Maxim Khomutinnikov took home Product of the Year (Mobile Applications) for YouPet, an all-in-one platform that connects pet owners, service providers, and welfare advocates in one easy-to-use app. Combining social features with practical tools like service booking, expert tips, and adoption support, YouPet reflects a growing global trend toward smarter, more connected pet care. The Solution of the Year (Personalized Medicine) honor went to Amrita Chakraborty, whose project Little Bright Smiles offers a practical oral-health toolkit for children with disabilities. The project translates clinical research into easy-to-use materials for dentists, caregivers, and families, helping improve daily care and outcomes for a globally underserved pediatric population. With a trauma-informed and culturally sensitive approach, it brings practical innovation to a long-overlooked area of healthcare. For her innovative approach to cross-border property development, Jeniece Sampson was selected as the Breakthrough of the Year (Commercial Real Estate) winner. She brought data-driven, community-focused strategies to a real estate firm active in the U.S., Canada, and the Caribbean. Her approach helps turn undervalued properties into strong, high-performing assets. Leading a company that combines emotional personalization with large-scale production, Narek Halstian earned Entrepreneur of the Year (Consumer Goods) for his work with GoGift. Based in Ukraine, the business blends high-volume manufacturing with customized gifts and is now expanding from Europe into the U.S. market. The jury featured leading voices from five continents - a diverse group of investors, executives, and strategic advisors with decades of experience. The judging process followed published regulations to ensure fairness and transparency. Among the notable experts were Olena Iashchenko, a marketing analyst at Glad Selena Corporation known for her groundbreaking work in data-driven marketing, and Khrystyna Terletska, a widely respected consultant in international business strategy. Alexander Litvin brought over 25 years of expertise in ESG and risk management, while Anna Cherednyk contributed her knowledge as a strategist for scaling growth-stage companies. Viktoriia Golova provided insight into investment and business growth, and Petro Burlachenko applied his expertise in evaluating the financial sustainability of projects. Olga Sokolova offered depth in B2B business development, and Valentyna Petrenko brought experience in corporate governance. The jury also included Anton Olkhovskyi, a tech entrepreneur and startup mentor; Olena Prykhodko, an HR and leadership consultant; Vitalii Skrypka, an engineering manager focused on scalable systems; entrepreneur and business expert Yaroslav Boiko; Olena Shabanova, a strategist in marketing and communications; and Alisa Goliampolska, a specialist in AI-driven marketing and digital automation. Together, this multidisciplinary team ensured a rigorous and forward-looking evaluation process. "This year's award reflects the pace of global change, where innovation knows no borders," said Dmitry Kotov, founder of Crazy Unicorns and co-organizer of the event. "We're proud to honor businesses that are not only thriving but reshaping industries and improving lives." The award ceremony was held as part of the broader American Business Expo 2025, which featured two stages - the Main Stage and the Business Stage - and a full-day program of high-level discussions on leadership, technology, and entrepreneurship. For more information about the American Business Expo and a complete list of award winners, visit or Company name: American Business CarnivalEmail: info@ person: Anastasiia VinogradovaAddress: 2885 NE 191st St, Aventura, FL 33180Phone: +1 754 262 19-26 To view the source version of this press release, please visit

Nicola Mining Receives Multi-Year Area Based Exploration Permit for Its Mine-Permitted Treasure Mountain Silver Project
Nicola Mining Receives Multi-Year Area Based Exploration Permit for Its Mine-Permitted Treasure Mountain Silver Project

Yahoo

time2 hours ago

  • Yahoo

Nicola Mining Receives Multi-Year Area Based Exploration Permit for Its Mine-Permitted Treasure Mountain Silver Project

Vancouver, British Columbia--(Newsfile Corp. - June 9, 2025) - Nicola Mining Inc. (TSX: NIM) (OTCQB: HUSIF) (FSE: HLIA) (the "Company" or "Nicola") is pleased to announce that it has received a multi-year area-based exploration permit, Permit Number MX-15-121 (the "MYAB Permit") on June 4th, 2025. The MYAB Permit allows Nicola to conduct extensive exploration on its wholly owned Treasure Mountain Silver Project1 (the "Treasure Mountain"), a fully permitted silver mine (Permit 239) located 30 km northeast of Hope and about a 3-hour drive from Vancouver, British Columbia (Fig. 1). Figure 1. Treasure Mountain locationTo view an enhanced version of this graphic, please visit: Receipt of the MYAB Permit, follows the Company's August 30th, 2024, announcement that it had received a ten-year mining lease extension (the "Extension") for Treasure Mountain2 under its M-239 permit. The Extension is valid through April 26, 2032, and receipt of the MYAB Permit positions the Company to leverage both mining and exploration options. Treasure Mountain consists of an historic underground silver mine with a resource estimate in accordance with CIM definition standards3 and exploration upside to the north and west of the historic mine. The MB Zone is approximately 800 m northwest of the current mine workings on undrilled northern flank of the mountain. The Cal Vein was discovered at this location in 2010 and return a surface sample grading as high as 9,221g/t Ag, 1.02% Cu, 1.14% Pb and 1.03% Zn4. Subsequent soil sampling was conducted in 2011/2012 and 2013 with encouraging results.5 Small exploration programs conducted between 2019 and 2021 on the northwestern side of the mountain included soil sampling, rock sampling, mapping, and shallow drilling campaigns. These programs successfully identified a 2 km soil anomaly which appears to be related to a vein system of roughly the same strike length. Drill testing of the exposed vein confirmed continuity of mineralization coincidental with the soil anomaly.6 The MYAB Permit allows the Company to carry out the following exploration activities over the next five years in the areas shown below (Fig. 2): 30 drill holes 1,400 m of trenching 4,500 m of trail building 20 km of geophysical surveys with exposed electrodes To view an enhanced version of this graphic, please visit: Figure 2. Site map with MYAB Permit boundaries Peter Espig, CEO of Nicola Mining Inc., commented, "Receipt of the MYAB under Permit Number MX-15-121 coupled with our recently received ten-year mine life extension under Permit M-239, puts Nicola into an envious position as the confluence of mine and exploration potential brings forth a project that most investors have forgotten. Bolstered by solid silver prices and with permits in hand, we are very excited about its potential and look forward to exploring our Treasure Mountain Project for the first time in over a decade" Qualified PersonWilliam Whitty, P. Geo., the Company's VP Exploration, is the Qualified Person as defined by National Instrument 43-101 - Standards of Disclosure for Mineral Projects and supervised the preparation of, and has reviewed and approved the technical information in this release. About Nicola MiningNicola Mining Inc. is a junior mining company listed on the TSX-V Exchange and Frankfurt Exchange that maintains a 100% owned mill and tailings facility, located near Merritt, British Columbia. It has signed Mining and Milling Profit Share Agreements with high-grade BC-based gold projects. Nicola's fully permitted mill can process both gold and silver mill feed via gravity and flotation processes. The Company owns 100% of the New Craigmont Project, a property that hosts historic high-grade copper mineralization and covers an area of over 10,800 hectares along the southern end of the Guichon Batholith and is adjacent to Highland Valley Copper, Canada's largest copper mine. The Company also owns 100% of the Treasure Mountain Property, which includes 30 mineral claims and a mineral lease, spanning an area exceeding 2,200 hectares. On behalf of the Board of Directors "Peter Espig" Peter EspigCEO & Director For additional information Contact: Peter EspigPhone: (778) 385-1213 Email: info@ Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. 1 Treasure Mountain Silver Project / Mine: Link2 August 30, 2024, News: Link3 Ostensoe, E. A., Giroux, G. H. and Beaton, A. J., 2009, Technical Report, Resource Estimation, Mining and Reclamation Plan and Economic Evaluation, Treasure Mountain Property, Tulameen River Area, B. C., Canada.4 August 25, 2010, News: Link5 October 7, 2013, News: Link6 Assessment Report for 2021 Exploration To view the source version of this press release, please visit

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store