logo
122 new homes coming to Cheyenne, with hopes for affordability

122 new homes coming to Cheyenne, with hopes for affordability

Yahoo30-04-2025
CHEYENNE — Around 122 new smaller, single-family homes are planned for north-central Cheyenne, with ground scheduled to be broken in about a month.
Mayor Patrick Collins said he sees this as a reflection of the city's work to make updates to city code to incentivize developers to pursue more affordable projects, as housing availability and affordability continue to be top issues for the community.
Median home listings in Cheyenne were at $372,516 as of March, according to Zillow.com, and the median size was 2,402 square feet, according to data from the Federal Reserve. Most of these new homes will be smaller, with the goal of making them more affordable. Most will be between 900 and 1,200 square feet, two-bedroom, two-bath single-family homes for an estimated price in the high $200,000s or low $300,000s, according to the developers.
The new homes will be constructed southeast of the intersection of Storey Boulevard and Converse Avenue.
The push for development comes in an effort to reduce home prices in the area and increase housing supply for an anticipated population growth over the next several years caused by Project Sentinel coming to F.E. Warren Air Force Base, continued data center developments and other projects. Sentinel is the replacement for the Minuteman III intercontinental ballistic missile.
Of the 122 proposed single-family homes, 86 are planned to meet those price and size expectations. For the zone district of these developments, the smallest lot width allowed is 30 feet. However, the developer, Edwards Development Company, requested the city reduce that minimum by 10% to 27 feet for some of the lots, which is allowed under current code because the developments are cottage lots.
The City Council approved this change, which allowed an additional eight to 10 lots to be developed with homes on them.
The developments are split into two adjacent spaces: 36 homes split on the 5.6-acre plat for Trailhead Estates first filing, and the other 86 homes split across the 11.9-acre plat for Trailhead Estates second filing. The homes in the first filing did not need a width reduction before approval.
Trailhead Estates plan
Edwards Development Company's plan for the two Trailhead Estates filings, with 86 single-family homes proposed to be constructed in the lot on the west side and 36 in the more eastern lot.
Both final plat plans were unanimously approved Monday evening by the Cheyenne City Council, with council member Mark Rinne absent.
In the second filing, homes will have parking access in the rear in a garage connected to the alley. Of the 86 homes, 23 won't face the street. Instead, the plan is to have the front facing a pedestrian corridor, with vehicle and garage access in the alley.
David Gregg, founder and co-owner of Berthoud, Colorado-based Mission Homes, is the architect on the project. He said he has installed this 56-foot-wide pedestrian corridor in other projects he has worked on in Colorado. He said the homes facing it are typically in higher demand than the street-facing properties.
Gregg has designed neighborhoods like this in several communities in Colorado, and said his company focuses on building more affordable starter homes, rather than larger homes, which some perceive to be a more profitable approach.
The units are small, with similar densities to townhomes, but detached to give more space between the buildings and yard space to the owners. The homes also have a private front porch and a fenced-in backyard. Gregg said they are energy and water efficient, as well.
Although not as common today, Gregg said this approach to housing development was more common 100 years ago.
'Up until the 1940s and 1950s, the average new home was 950 square feet. Today it is 2,500 square feet,' he said. 'We point fingers and argue over whose fault it is that homes are no longer affordable. I would argue it is simply because they've grown too large, and it's not necessary. And we're going back to something that was very, very common about 100 years ago.'
John Edwards of Edwards Development Company said this area for this project is ideal. With existing and planned apartment complexes to the west of this project off Converse Avenue and larger single-family homes to the east, he said these smaller single-family homes are a natural transition in the area around Anderson Elementary School.
At the City Council's Public Services Committee meeting last week, Mayor Collins said he had recently visited one of Gregg's similar developments in Colorado.
'I did go down to Berthoud because I thought maybe it might be too good to be true, that we could have this kind of density and yet still have a development that I would want to live in, or want my kids to live in. And I got down there, and it's beautiful,' he said.
He said he is excited to see aspects of affordable and attainable housing beginning to be realized in Cheyenne, something that has been his top priority to promote in Cheyenne throughout his previous and current terms.
'This governing body, over the last couple of years, has worked really hard with our Affordable Housing Task Force and the Wyoming Community Development Authority on all of the different recommendations for things we could do to encourage more attainable housing. We've passed all those rules,' he said. 'And now, we actually have developers who are coming to us with exactly what we hoped would happen, which is smaller, more affordable homes for people to get their first home, or maybe their last home, to live into.'
In 2024, WCDA released a housing needs assessment for the state and communities across Wyoming. With population growth over the past decade and moderate population growth projected, WCDA suggests the state needs to add between 20,700 and 38,600 units by 2030.
WCDA estimates that Laramie County will need between 1,204 and 1,994 additional rental units and between 3,181 and 5,271 additional houses, totaling between 4,386 and 7,266 total housing units needed by 2030.
In 2023 — the most recent year for which numbers were available — 1,681 units were built in Laramie County.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

S.F.'s Philz Coffee to be purchased by private equity firm for $145 million
S.F.'s Philz Coffee to be purchased by private equity firm for $145 million

San Francisco Chronicle​

time11 minutes ago

  • San Francisco Chronicle​

S.F.'s Philz Coffee to be purchased by private equity firm for $145 million

Los Angeles-based private equity firm Freeman Spogli & Co. has made a bid to acquire popular San Francisco-grown coffee chain Philz coffee. The firm has previously invested in food franchises Popeyes and El Pollo Loco, as well as Petco. The value of the pending transaction is $145 million, according to reports to stakeholders obtained by Mission Local, which first reported the deal on Friday. Jacob Jabor, son of Philz founder Phil Jaber, did not respond to an inquiry from the Chronicle. Freeman Spogli could not immediately be reached for comment Friday. The deal is reportedly expected to close on Aug. 8, and stockholders have until Aug. 5 to receive an appraisal of their shares. Other stakeholders in the deal are investment firms Summit Partners and TPG Growth, according to Mission Local. Meanwhile, the company's common stock holders, including employees, are expected to see their stock canceled under the terms of the agreement, the outlet reported. Phil Jabar went from owning a corner store to a venture capital-backed business raising some $75 million in funding, after launching Philz out a storefront at 24th and Folsom streets storefront in the city's Mission District more than two decades ago. That location popularized the company's distinct one-cup-at-a-time pour-over style, which is executed by baristas working at separate stations.

This week in 5 numbers: AI is coming for entry-level jobs
This week in 5 numbers: AI is coming for entry-level jobs

Yahoo

time42 minutes ago

  • Yahoo

This week in 5 numbers: AI is coming for entry-level jobs

This story was originally published on HR Dive. To receive daily news and insights, subscribe to our free daily HR Dive newsletter. An indicator of employees' likelihood to stay at their job rose slightly, while nearly 3 in 4 workers think artificial intelligence will eliminate some entry-level corporate jobs. Here's a closer look at those numbers and some of the others making headlines in the HR world. By the numbers 0.4 points The amount Eagle Hill Consulting's Employee Retention Index increased during the second quarter, meaning slightly more workers are likely to stay at their jobs during the next six months. 4% The percentage of women of color in leadership positions at Fortune 500 technology companies, according to an analysis from law firm Shegerian Conniff. 72% The percentage of workers who believe AI will cut down the number of entry-level corporate job opportunities in the next five years, according to a Zety survey. 123% The median quarterly income growth participants in a Colorado workforce reentry program for formerly incarcerated people experienced within six months of enrollment, according to an analysis published by the University of Denver's Colorado Evaluation & Action Lab. $50,000 The amount the company behind BarkBox is going to pay a 'chairdog' to serve on the executive team for a year. Recommended Reading CompTIA partnership aims to expand tech opportunities for LGBTQ talent Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data

Construction begins on first residential lots at controversial Crown development in Sugar Grove
Construction begins on first residential lots at controversial Crown development in Sugar Grove

Chicago Tribune

timean hour ago

  • Chicago Tribune

Construction begins on first residential lots at controversial Crown development in Sugar Grove

Construction has officially started at The Grove, a mixed-use development planned on 760 acres at Interstate 88 and Route 47 that was annexed into the village of Sugar Grove last year. Work is beginning on just one portion of the development area, set to be the community's first residential neighborhood, according to a news release Thursday from Sugar Grove LLC, an entity of Naperville-based Crown Community Development. That area, located along Merrill Road, will offer single-family homes on 214 lots, which Crown expects to deliver to home builders in 2026. Oswego-based J&S Construction was awarded the site contract for the project, according to Thursday's news release. The Grove has been a long time coming, said Crown's Managing Director Jennifer Cowan on Friday. She said that Crown has owned the property for many years, and that 'a lot of work has gone into positioning the property for development.' Last September, the Sugar Grove Village Board approved the development project and agreed to annex the property into the village and give its developer financial incentives via a tax increment financing district, according to past reporting. The project will sit on what is currently mostly farmland surrounding the Interstate 88 and Route 47 interchange. It's set to include neighborhoods, mixed-use commercial and residential areas, a walkable town center and a business park area. The project faced public opposition, however, both before and after the village gave it the green light. In April, a non-binding referendum question was passed by voters asking the village to reverse its decision on the project. In the same election, former village president Jennifer Konen and an incumbent village trustee — both of whom voted in favor of the Crown project — were voted out. Still underway is a lawsuit against Sugar Grove by Kaneland School District 302, which is challenging the tax increment financing district planned for the development project. A TIF district is a form of economic development incentive, in which the value of a property is essentially frozen, with the extra or 'increment' taxes created by developing the property then going into a special fund used to pay for costs related to improving the area. Kaneland was previously in negotiations with Sugar Grove to create an intergovernmental agreement about the TIF district, according to past reporting. But, not satisfied with those terms, the district floated the possibility of taking legal action against the village in February. The Kaneland lawsuit was filed on June 13 with the Kane County Circuit Court, according to case information on the county circuit clerk's website. The district is arguing that the TIF district will mean the school district will lose out on incremental property taxes levied against the area for a period of 23 years, and that there is controversy over whether the area should qualify for tax increment financing in the first place, according to past reporting. Per the lawsuit, the school district is asking the village to dissolve the TIF district. Sugar Grove Village President Sue Stillwell declined to comment on Friday about the lawsuit. Kaneland Superintendent Kurt Rohlwing said on Friday that the district right now is waiting on an initial hearing, which will likely not be until September. 'We want to make sure that we have a fair deal for the financial arrangements that impact all of our communities,' Rohlwing told The Beacon-News. But, despite the opposition and legal action surrounding the TIF district for the development, the Crown project has continued to move forward in recent months. In late April, the village OK'd a final plat of subdivision, essentially a map dividing up a piece of land into smaller lots, for one portion of the development — the part that just began construction, Cowan said. The latest approval Crown secured was a mass grading permit, which is required by its annexation agreement with Sugar Grove, according to Stillwell. Mass grading is essentially preparing the land at a site for construction. The developer is going to be grading nearly 80 acres of the project area, Cowan said, which could take six to eight weeks. From there, the developer will install sanitary sewers, water mains and storm sewers underground, and pave and finish streets by the end of this year or the spring of 2026. Getting the mass grading permit allows Crown to start construction while its engineering plans are still being reviewed, Cowan explained. She noted that significant rain during the fall could impede the process, so the goal is to have the grading done before then. Crown will have to go through the engineering review process and plat approval process for each portion of the project it brings forward to the village, Cowan said. This first development area is expected to offer single-family homes with two- or three-car garages, according to Thursday's news release. Crown is a land developer, meaning it won't be building the homes that will sit on this development area. But Cowan said she anticipates there could be homes built in this area before the end of 2026. The Crown project as a whole is set to have as many as 1,500 residences, according to The Grove's website, and at least 200 acres of open space, including parks and trails. As for the other components, Cowan said that the industrial portion of the land is already under contract for a data center, which could be built in the next three to four years. For Crown's part, she estimated that its build-out of all the parcels in the project's development area could be finished in about 10 years, not necessarily including the construction of the homes or other buildings that will then be built on top of them. But, for now, Cowan expressed optimism about the project as a whole and the progress being made on this first residential piece of the project. 'I'm really excited to be able to deliver some additional housing supply to this market,' Cowan said. 'It is a supply-constrained market. … Housing supply is definitely a need here in Chicago, in the Chicago metro area.'

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store