logo
Conservation site approved for former quarry in Surrey

Conservation site approved for former quarry in Surrey

BBC News14-07-2025
A former quarry in Surrey is to be converted into a nature conservation site, a council has said. Plans for Clockhouse Quarry in Capel, near Dorking, could take at least 14 years to complete.Officers from Surrey Council Council have granted planning permission to utility company Suez.The firm will now begin importing around 740,000 cubic metres of inert material, such as soil, from nearby construction projects to create the site.
It will bring an end to the industrialisation of the land that has stretched back to 1947, according to the Local Democracy Reporting Service. Gerry Cavanagh, regional manager at Suez, said: "We look forward to delivering all the excellent enhancements for local wildlife and keeping the community updated on our activity as we look to the months ahead."The company said it wanted to "reduce the size and depth" of man-made reservoirs to "minimise both health and safety risks associated with unauthorised access, as well as bird strikes for aeroplanes approaching or taking off from Gatwick Airport".It said the plans should help native great-crested newts and other flora and fauna.The first decade of the project will see large swathes of the site refilled before a potential two-year pause to allow habitats to establish. This would be followed by another two years of work, ensuring water can drain freely from the restored land.Construction is expected to start in 2026.
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Plan for massive solar farm sparks fears for Lingfield landscape
Plan for massive solar farm sparks fears for Lingfield landscape

BBC News

timea day ago

  • BBC News

Plan for massive solar farm sparks fears for Lingfield landscape

Villagers in Surrey are opposing plans to build a 220 acre (89 hectare) solar farm "surrounding their homes".Belltown Power says its proposed development east of Lingfield in Tandridge will "support biodiversity, ecology and the local community", while "generating enough green energy to meet the annual needs of approximately 24,000 homes for four decades".The company, which applied for planning earlier this month, added that the land will "maintain its greenfield classification" and return to its original use once the 40 years expires. But residents in nearby Haxtead claim the site - equivalent to 138 standard football pitches - will "permanently alter the natural landscape". Opposition group Haxted Mead United (HMU) said the development will "remove valuable farmland" and scar the rural area by affecting rights of way, walking routes and local site is also a known floodplain, particularly in winter, the group added, while construction would "bring heavy vehicles to narrow roads, causing congestion, noise pollution and potential damage". HMU are currently raising funds to commission risk assessments into its above group said that, while supporters of renewable energy, "this isn't about sustainability but profit. "It sets a dangerous precedent for industrialising green-belt and farmland all over the UK."And, as well as citing viable alternative locations such as "former industrial land and and commercial rooftops", they also point out that a similar 61 acre (25 hectare) development is already underway in neighbouring Edenbridge. However, a spokesperson for Belltown Power called the project "thoughtfully designed," adding that they have "engaged with all residents within a 2km radius to gauge their views". Based on that feedback they have "minimised the visual impact of the project" by incorporating new hedgerows and trees, floodplain wildflower meadows and "2.5km of new footpaths to connect existing routes and provide scenic walks along the River Eden".They added that they will "continue engaging with the community throughout the planning process."

Woking community centre forced to close by power problems
Woking community centre forced to close by power problems

BBC News

time4 days ago

  • BBC News

Woking community centre forced to close by power problems

A community centre in Surrey has been forced to close after it was left without power or a fire alarm events at the Maybury Centre, in Board School Road, Woking, have been suspended by the borough council until the problem is resolved, according to the Local Democracy Reporting blackout began at the centre on 24 July, the council said, when the electricity provider for the building terminated the Maybury Centre Trust, a registered charity and manager of the building, was not immediately available for comment. The centre provides facilities for education, health, welfare, business and recreation in the surrounding trust hires it under an agreement with Woking Borough Council, taking over operations in June as part of the council's asset transfer policy to cut comes after the council effectively declared itself bankrupt in 2023 with £2bn of council said that, in the interest of public safety, the centre will remain closed until the situation is resolved and that any upcoming bookings will not be Greentree, the council's portfolio holder for community, said: "We recognise the closure will cause disruption for many local groups who use the centre regularly, but the safety of building users and the wider public must always come first."The council said that those impacted can contact them to see what options may be available.

Plans for Staines four-star hotel by River Thames fall through
Plans for Staines four-star hotel by River Thames fall through

BBC News

time4 days ago

  • BBC News

Plans for Staines four-star hotel by River Thames fall through

Plans for a riverside four-star hotel in Surrey have fallen through after the council decided that the project was "no longer practical".Spelthorne Borough Council had been working with Arora Group to agree plans to regenerate the land under Bridge Street car park in Staines, which would include developing the the council has now said it has agreed to terminate the lease for the site, subject to approval at a full council meeting in Sexton, leader of the council, cited the upcoming reorganisation of local government as a driving factor in the decision. She said: "While this was a difficult decision, it reflects our responsibility to adapt to new priorities and the reorganisation of local government means we must reassess what is right for Staines."We remain committed to creating a vibrant future for the town and will work closely with the community as we plan the next steps for this important site."Under the original plans signed in February, Arora had agreed to lease the site to develop the site of the car park and neighbouring Hanover development would have included creating a four-star hotel by the side of the River declined to comment on the decision.A council spokesperson added that it would be continuing to look at future options for the site, which will continue to operate as a public car park in the government reorganisation plans will see councils in Surrey disbanded and reformed into a number of unitary authorities as part of national government devolution plans.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store