
UK interest rates predicted to stay at 4.25% with Bank ‘nimble' amid uncertainty
UK interest rates are set to stay at 4.25% after inflation jumped in April and policymakers remain 'nimble' to the evolving economic backdrop, economists have predicted.
Most economists think the Bank of England's Monetary Policy Committee (MPC) will opt to keep rates on hold when it meets on Thursday.
The MPC has voted to cut rates at every other meeting since it started easing borrowing costs last August, from a peak of 5.25%.
This has been possible while the rate of UK inflation has been steadily falling from the highs reached in 2023, at the peak of the cost-of-living crisis.
However, inflation jumped to its highest level for more than a year in April, according to the latest figures from the Office for National Statistics (ONS).
Consumer Prices Index (CPI) inflation hit 3.5% in April, up from 2.6% in March.
Since releasing the data, the ONS said that an error in vehicle tax data collected meant the April figure should have been 3.4%.
Ellie Henderson, an economist for Investec, said monetary policy 'seems to be in a good position, allowing the Bank of England to wait and see how economic conditions and the international political backdrop evolve'.
'Ultimately, this is a highly uncertain time that requires a potentially nimble response from central banks, limiting any great foresight,' she said.
'Although the June decision might seem clear cut, how the MPC responds to the evolving economic backdrop thereafter much depends on the details of the world in which we find ourselves.'
On Friday, oil prices were soaring after Israel launched an attack on Iran's nuclear programme, raising anxieties about possible disruption to the supply of the commodity in the Middle East.
And ongoing uncertainty over US President Donald Trump's tariffs, which surveys suggest have dampened business confidence and reduced exports, also remains in focus for policymakers.
Meanwhile, new official figures showed wage growth for UK workers eased sharply in the three months to April and the unemployment rate increased, as employers feel the effects of higher costs.
Rob Wood and Elliott Jordan-Doak, economists for Pantheon Macroeconomics, said a weaker jobs market 'will reassure the MPC that it can plan on further rate cuts', but added that 'one month's data is far from enough to allow the MPC to bin its 'gradual and careful' approach to easing monetary policy.'
Bank chief economist Huw Pill, who is also an MPC member, said last month that he thought rates had been cut too quickly partly due to the risk of 'stubbornly strong' pay growth on overall inflation.
New UK inflation figures for May will be released on Wednesday, while the US central bank is also widely expected to keep its interest rates on hold.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


BBC News
an hour ago
- BBC News
HS2 contractors referred to taxman over supply of workers
The company building the HS2 rail line between London and Birmingham has reported one of its subcontractors to the tax authorities over possible fraud. Whistleblowers made allegations over the way pay was handled for some construction staff on the high-speed Ltd said last month it was conducting its own investigation, looking into two firms who supplied it with workers. The company has now also referred the matter to firms in question were providing workers to Balfour Beatty Vinci (BBV), a contractor for HS2. Transport Secretary Heidi Alexander is expected to raise the issue in Parliament this week. It is the latest difficulty to beset the troubled giant rail infrastructure has faced myriad challenges and spiralling costs since it was first announced in 2009. It was originally designed to boost capacity on the railways between the north and south of England but the last, Conservative, government decided to scrap the second phase of the project, which included building lines to Manchester and this year whistleblowers flagged concerns over the way some subcontracted staff were being paid. They said self-employed workers had been falsely declared as salaried staff, with "fake" payslips submitted at a higher payrate. The allegations were first published in the i newspaper in of the labour suppliers is understood to remain suspended from new contracts while inquiries HS2 spokesperson said: "We treat all whistleblower allegations seriously and are continuing to conduct our own investigation."The firm said it encouraged anyone with relevant information to report it via confidential internal Department for Transport said last month it had "a zero-tolerance attitude towards fraud, bribery, and corruption" and would ensure any claims of wrongdoing were thoroughly investigated.


The Independent
an hour ago
- The Independent
HS2 reports subcontractor to HMRC after alleged fraud
HS2 has reported a sub-contractor working on the rail line to HMRC following an internal probe into alleged fraud. Last month a whistleblower threw a spotlight on two firms providing construction staff to a section of the high-speed line. It was alleged that an HS2 sub-contractor had been falsely declaring self-employed workers as Paye (pay as you earn) salaried staff and charging an inflated rate for them, then submitting 'fake' payslips, according to reports first published in the i newspaper last month. A sub-contractor was suspended from HS2's contractor Balfour Beatty Vinci's (BBV) section of the line in the West Midlands, the newspaper added. One firm has been reported to HM Revenue and Customs (HMRC) for alleged supply chain fraud, a senior Whitehall source confirmed. Transport Secretary Heidi Alexander is set to raise the issue in Parliament next week. It is part of Labour's 'wider work to reset and deliver the project after mismanagement under previous governments', the source said. The entire high-speed railway project is undergoing a reset led by Mark Wild, who became HS2 Ltd chief executive in December amid rising costs and delays. The source said Mr Wild is 'looking under the bonnet and is not liking what he is finding' and added that Ms Alexander would highlight 'ministerial mismanagement', a 'lack of ministerial oversight' and an organisation that is 'not fit for purpose'. An HS2 spokesperson said on Saturday: 'We treat all whistleblower allegations seriously and are continuing to conduct our own investigation. 'Furthermore, HS2 Ltd has formally reported the allegations to HMRC, and we encourage anyone who believes they may have relevant information, which could support our inquiries, to report it in confidence via HS2's Speak Out channels.' HMRC said it cannot confirm if it is investigating. After reports emerged about the internal HS2 investigation in May, a Department for Transport spokesman said: 'The Government and HS2 Ltd take all whistleblower allegations extremely seriously and have a zero-tolerance attitude towards fraud, bribery, and corruption. 'We will therefore ensure any claims of wrongdoing in HS2's supply chain are thoroughly investigated.' At that time an HS2 spokesman confirmed it is a 'aware of the claims made in relation to labour suppliers on part of the route. 'An investigation was launched earlier this year into a number of different allegations and our contractor Balfour Beatty Vinci (BBV) has implemented additional monitoring and controls,' it said. The whistleblower claims were first made in February, the i reported. About 31,000 people are now employed on the programme across the 140-mile route. In May a giant HS2 boring machine broke through to complete the first section of a 3.5-mile tunnel on the route's approach into Birmingham. The tunnel is the first of two bores of the Bromford Tunnel, running from the village of Water Orton in North Warwickshire to the Birmingham suburb of Washwood Heath, and passing under the area's motorway network and the River Tame. The tunnel breakthrough, HS2's first in Birmingham, was described as a significant milestone for the line, which will almost halve journey times between Birmingham and London, while freeing up track space on the West Coast Main Line for local, regional and freight services.


The Sun
an hour ago
- The Sun
Pub owner stunned to discover secret underground tunnel running below UK village after knocking down wall of boozer
A PUB owner was left stunned after uncovering a secret underground tunnel beneath a UK village — hidden behind a wall in the boozer. Robert Bennet, the owner of the pub, was shocked when he discovered a network of tunnels behind one of his boozer's walls. 3 3 3 His findings have raised questions about the tunnel's ownership and thrown a wrench into his ambitious expansion plans. Robert bought Port Dinorwic Marina in T Felinheli, Wales, last year after it went into administration. His purchase included a number of buildings, including a restaurant named La Marina - which he renamed to Yr Heulyn. As work began to renovate the pub, Rob became curious about the mysterious plasterboard at the back of the pub. He had heard of a secret tunnel before and had a strange feeling that the passageway could be on the other side of the wall. After knocking through the plasterboard, a worker stepped through the hole into a mysterious tunnel. Opening up about the shocking discovery, Rob said: "There was a plaster wall at the back of the pub that had been built by the last owners but we didn't know the tunnel was behind it. "But I knew of the tunnel's existence and I could see a curved buttress at the rear of the pub. "We decided to knock through the plaster wall, initially just a small hole and we could see rooms behind it. We sent someone in and later enlarged the hole so we could go through. "We found that a previous owner had used part of the tunnel as storage, there were thousands of empty bottles in there. 'The most recent date on one of the bottles was 2003 was we assume it was blocked off shortly after this. We've no idea why it was blocked up." Now, Rob wants to open up the tunnel to the public and hopes to incorporate it into his pub experience. The pub owner says that he is considering transforming the space into a speakeasy. However, first, he needs to establish who actually owns the network of passages since his deed to the pub ends at his establishment's walls. The passage is part of the Port Dinorwic Tunnel, which was built in 1842 and connected Port Dinorwic and Penscoins. Originally, the tunnel was used to move slate but later was used to transport workers. However, the tunnel was abruptly closed in 1961, shortly before the closure of the Dinorwic quarry. The news comes after plans to construct a 'Welsh tube' were announced. The £1 billion project will feature a tap-in, tape-out system - like the London Underground - and will stretch across South East Wales.