
Nibe shares hit 5% upper circuit on securing Rs 151 crore defence order from Israeli OEM
Live Events
Nibe technical indicators
Nibe shares performance
(You can now subscribe to our
(You can now subscribe to our ETMarkets WhatsApp channel
Shares of defence engineering company Nibe Limited hit their 5% upper circuit at Rs 1,601.85 on the BSE on Monday after the firm announced an international order worth Rs 150.6 crore from a leading Israel-based original equipment manufacturer (OEM).The contract involves the manufacturing and supply of Universal Rocket Launchers with a range of up to 300 kilometres—an advanced system being produced in India for the first time for global deployment.Calling it a landmark achievement, Nibe said the order underscores its commitment to the 'Atmanirbhar Bharat' and Make in India initiatives, aiming to deliver world-class defence technology from Indian soil.The Universal Rocket Launcher is positioned as one of the most advanced in its category, built to outperform current global alternatives. The deal also strengthens Nibe's presence in international markets while bolstering India's role in modern warfare capabilities.Through collaborations with international defence leaders, Nibe continues to develop indigenous, high-impact solutions for both the Indian Armed Forces and overseas clients, aligning with national priorities and boosting global defence innovation.Nibe Limited is an Indian defence technology firm engaged in the development, manufacturing, and integration of advanced military systems. It plays a key role in enhancing India's defence capabilities and export potential through innovation and global partnerships.Nibe's Relative Strength Index (RSI) stands at 58.5, suggesting neutral momentum. The MACD is at 78.8, above both the centerline and signal line—a bullish signal.The stock is trading above its 20-day, 30-day, 50-day, 100-day, and 150-day simple moving averages (SMAs), but remains below the 5-day, 10-day, and 200-day SMAs. Nibe shares closed at Rs 1,525.6 on Friday, up 0.5% on the BSE, while the Sensex gained 0.95%. The stock has climbed 47% in the past three months and surged 3,029% over the last three years. Its current market capitalisation is Rs 2,181 crore.: Recommendations, suggestions, views and opinions given by the experts are their own. These do not represent the views of the Economic Times)
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
29 minutes ago
- Time of India
Ranchi vendor markets sinking under choked drains, unhygienic surroundings, & poor infra
1 2 Ranchi: The city's main vendor markets, especially Naga Baba Khatal and Kokar, are characterised by choked drains, unhygienic surroundings, and poor infrastructure. These public spaces remain on the margins of municipal attention in spite of being important areas in a civilised society. A vendor at Rs 10.86-crore valued Naga Baba Khatal Vendor Market, Rekha Devi, said, "Overflowing drains, stagnant water, and heaps of rotting vegetables have turned the area unbearable. Even a small shower turns this place into a filthy swamp. The stink is terrible. Customers avoid coming here." Echoing the statement, customer Neha Kumari said, "The area lacks drainage system. We have to walk in muck mixed with vegetable waste. Toilets are barely usable, especially for women." At Kokar Vendor Market, vendors operate beside garbage piles and blocked drains. "The waste isn't picked up regularly, turning into heaps and lying scattered with rainwater," said Imran, a fruit seller. The Atal Vendor Market, built at a cost of Rs 54 crore with 478 shops, is structurally better but overcrowded. Vendors and customers struggle to navigate narrow congested passages. "There's no space to walk during rush hours, especially when shopkeepers display goods outside their stalls," said Arun Kumar, a vendor. Though these markets were constructed to decongest roads and fight encroachments, their neglected condition is forcing vendors back onto roads and footpaths. "The markets helped control encroachment to some extent. However, the vendors prefer doing their business from the roadside, where footfall is higher and conditions are manageable," said Shabnam Ansari, a vendor at Naga Baba Market. Assistant municipal commissioner Nikesh Kumar said, "Each market has four to five cleaning staff. Restoration files have been submitted to the authorities. Upgradation of infrastructure would begin based on approval." "For hundreds of vendors and thousands of customers, restoring hygiene and functionality in these markets isn't about comfortbut survival," said Ritu Sinha, another customer at the Atal Vendor Market.


Time of India
29 minutes ago
- Time of India
After SC order, MMRDA seeks price bids from L&T on projects
Mumbai: Nearly two weeks after MMRDA informed Supreme Court that it had "in public interest" scrapped its tenders for the Thane-Ghodbunder-Bhayander twin tunnel and elevated road projects—collectively estimated at Rs 14,000 crore—the planning authority has sought detailed financial estimates from infrastructure giant Larsen & Toubro (L&T). Tired of too many ads? go ad free now The projects include an underground road tunnel from Gaimukh to Fountain Hotel Junction on Ghodbunder Road and an elevated road from Fountain Hotel Junction to Bhayander. Sources said MMRDA sent a letter on June 10 asking L&T to submit detailed financial estimates/price bids, rate analysis and justification and related documents in seven working days "to ensure completeness of the bid records" and "further transparency and public interest". The tender process for the projects had landed in court after MMRDA disqualified L&T from the technical bids round by declaring it non-responsive, saying it had failed to submit a mandatory affidavit. The affidavit required bidders to declare that none of their bridges had collapsed within two years of completion. Megha Engineering and Infrastructure, a prominent purchaser of electoral bonds prior to being scrapped by the apex court, was declared the successful bidder. L&T then moved Bombay HC, alleging lack of clarity over the rejection and the decision not to open its financial bids. HC granted a temporary stay on the opening of price bids on May 13 but dismissed L&T's petitions on May 20, observing "material suppression" by the company. The court upheld MMRDA's tendering process. L&T approached SC, which expressed surprise that technical bids of a firm that had built Central Vista and Atal Setu had been rejected. Tired of too many ads? go ad free now The company disclosed during the proceedings that its quoted prices were significantly lower—Rs 6,498 crore for the tunnel and Rs 5,554 crore for the elevated road. SC was informed that the difference was over Rs 3,100 crore between the lowest bidder and L&T. The bench asked MMRDA how L&T could be technically disqualified from the projects in that case and directed it to check with the state govt if it was willing to re-tender the projects. SC disposed of L&T's petition after MMRDA agreed to re-tender the projects. MMRDA has since maintained that both SC and HC had upheld its submission, but that in deference to the courts and in line with its institutional commitment to transparency, it was decided that both tenders would be scrapped and a fresh tender process would be initiated. In its June 10 letter, it said it had decided to voluntarily scrap the tenders and revise cost estimates in the "spirit of transparency and larger public interest. "
&w=3840&q=100)

Business Standard
38 minutes ago
- Business Standard
Samsung assembled more mobile phones in India than Apple last year
Korean firm makes more phones across most segments and has higher volumes: S&P report Surajeet Das Gupta New Delhi Listen to This Article Samsung's global volume share of final assembling of smartphones in India might not get the same focus as that of Apple Inc because of the latter's aggressive export strategy and higher average selling price leading to higher value. But in terms of volume, the reality is that Samsung is much higher than its US rival. A research by S&P Global shows that Samsung's share of global final assembly volume of smartphones in India in 2024 was at 25 per cent compared to only 15 per cent of the Cupertino-based Apple Inc in the same period. For Samsung, its biggest exposure