
Tourist visiting Canada stuck in CN Tower elevator for 40 mins: 'What if it falls?'
But the reset failed. A technician was called, but would take about 40 minutes to arrive. The atmosphere in the elevator was 'tense,' said El-Mahdi.
Article content
'For the 40 minutes we were in there waiting for that technician to arrive, not once did they call again to check how we are doing,' she said. 'I know they couldn't do anything because we're stuck inside the elevator, and they couldn't get us anything anyway, but at least check in on us see how we're doing.'
Article content
She added: 'I was scared, obviously, because I mean, it crosses your mind: What if the elevator falls?'
Article content
According to a statement from the CN Tower, its elevators 'are rigorously maintained and have multiple redundant safety systems, which ensure they stay safely in position or move in a controlled manner at all times.'
Article content
The technician finally arrived and the elevator was lowered to the main observation deck after a few minutes. El-Mahdi said a staff member 'silently' let them out 'without a word of concern, explanation, or apology.'
Article content
El-Mahdi and her husband waited for the next elevator to get to the ground floor. She was able to text her son throughout the ordeal and he decided to wait for them at the bottom of the building.
Article content
A CN Tower spokesperson confirmed there was an elevator delay from The Top on July 15. A safety sensor was triggered at 8:42 p.m., per the statement. Throughout the delay, the spokesperson said that the security team maintained contact with the guests and gave them updates.
Article content
'An elevator technician was on-site at 9:15 p.m. and the elevator guests were safely unloaded at 9:19 p.m. After investigating and confirming there was no safety issue, the elevator returned to service approximately 45 minutes later,' the statement continued.
Article content
'Our team welcomed guests back to the Main Observation Level, apologized for the delay, thanked them for their understanding and made every effort to ensure they felt acknowledged and supported. While some guests left before we could speak with them, we've made efforts to follow up with them to hear about their experience and ensure their satisfaction.'
Article content
Article content
During peak hours of operation, the CN Tower has an elevator technician on-site to respond. However, during off-peak hours, technicians are available on-call, 24/7, and respond within 45 minutes or less, per the CN Tower's statement.
Article content
'The safety and well-being of our guests and staff remain our top priority. Every aspect of the CN Tower experience is built on rigorous safety standards, ensuring that every visit is not only unforgettable, but also exceptionally safe,' the statement said.
Article content
Out of concern for privacy of its guests, the CN Tower does not disclose personal information; however, a spokesperson said the guest services team 'attempted to speak with all occupants of the delayed elevator.'
Article content
'There were some guests that abruptly left the area,' per the spokesperson.
Article content

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


CBC
an hour ago
- CBC
First standalone Islamic school in south Edmonton breaks ground
An Edmonton community is one step closer to achieving its dream after breaking ground Wednesday at the city's first standalone Islamic school on the south side. The Omar Ibn Al-Khattab Academy's future facility, spanning nearly 40 acres at 8615 41st Ave., surrounded by canola fields and farmland, is slated to open its doors in September 2026. "The need is huge," said Dr. Osama Namaruish, president of the Omar Ibn Al Khattab Centre, as cranes and bulldozers rumbled behind him. "There are other Islamic schools, mostly in the north side. The waiting time is in the thousands." With 120 students, the academy's current independent K-9 school operates out of the Omar Ibn Al Khattab Centre (OIAC) on Parson's Road. Other Islamic schools in south Edmonton operate out of leased spaces, warehouses and mosques, but this will be the first purpose-built school in the area, an OIAC spokesperson told CBC. Plans for the future $30 million academy include 22 classrooms, sports fields, a prayer hall for 300 worshippers, a commercial kitchen and a community centre. The money to build the new facility is being raised through a fundraising campaign and private donations. "We want to see a proper school that has proper sport fields that is welcoming to the community, Muslims and non-Muslims," Namaruish said. "It's a place where people will socialize, people will meet, some interfaith dialogue will happen and people will talk to each other and understand each other." According to OIAC, more than 5,000 Muslim students live south of 23rd Avenue. Among them is Daniyaal Saeed, 13, whose commute time to the Parsons Road location in heavy traffic can take as long as 30 minutes each way. But for Saeed, it's worth it. "We got to learn about our religion, our history, everything," Saeed told CBC News. "Everybody knows each other. Everybody's kind to each other. They don't hate on religions, because we all have the same religion." Coun. Keren Tang said the new school will also help to alleviate the pressures of population growth in Ward Karhiio. "It responds to a bit of the growth pressure here. It responds to some of the school challenges that we're talking about and I think it's going to add to the overall community," Teng said.


CBC
an hour ago
- CBC
Search for B.C.'s Best Symbol: Round 2— Provincial
The Search for B.C.'s Best Symbol completes its second round today with a series of matchups about man-made provincial icons that can be found in different areas across British Columbia: Ogopogo vs. Okanagan wine. B.C. flag vs. Highway route markers. Mr. PG vs. Terry Fox statues. Tree huggers vs. "N" licence plate stickers. The four winners today will join the four winners from the Animal, Nature, and Coastal quadrants in the final 16. Voting is open until 10 p.m. Pacific time. May the best symbols win!


CTV News
2 hours ago
- CTV News
Low water level creating concern for Whiteshell lake
Cottagers at Betula Lake are worried about the lower water levels in the area. CTV's Daniel Halmarson reports. For many cottagers, Betula Lake has become a second home. 'It's a beautiful lake. it's not huge, but it's been great,' said cottager Larry Larke. However, low water levels are causing some problems. 'When you think of a shallow lake like Betula that averages six to eight feet, when you have a four- or five-inch drop in water, it's a significant hit,' said Ryan Galloway, president of the Betula Lake Association. invasive weeds are also running wild, wreaking havoc on boaters and swimmers. 'The biggest thing is the long-term viability and the health of the lake,' Galloway said. 'The last thing we want to see is an environmental issue where the lake just becomes so overrun that we can't deal with it.' Betula lake has a target water level dictated by the province. However, Galloway said, two fixed weirs downstream can't maintain that level. 'The height of the weir needs to change,' Galloway said. 'We need to be able to contain more water for a longer period of time, so in the low seasons we're able to do to maintain that level higher.' The Betula Lake Association has already petitioned the province to take action to protect the body of water. 'They came back early January and said, 'We'll have a little water hydrological study done by the summer' and we haven't heard anything yet. We haven't got any response,' Galloway said. The cottagers said they've taken steps to educate themselves on water stewardship, but they're demanding more help to preserve Betula Lake's future. 'It's really concerning to me,' said cottager Christine DeGraff. 'My kids are fourth generation family out here. And, you know, our goal and our dream is to see generation number five enjoying it as much as we did.' Aside from raising the height of the weirs, the association wants the province to increase the target water levels and complete a study on invasive species. In an email response to questions, Manitoba Transportation and Infrastructure said it must first analyze how any changes in the outlet could impact lake levels, the shoreline, and nearby properties. It says that work is now underway after being delayed by wildfires.