Churchill Corrects Results Table for March 4th News Release on Discovery of Vanadium-Titanium-Iron Mineralization at the Taylor Brook Nickel Project
TORONTO, March 10, 2025 (GLOBE NEWSWIRE) -- Further to its news release dated March 4, 2025 (the 'Original Press Release'), Churchill Resources Inc. ('Churchill' or the 'Company') (TSXV: CRI) has become aware of a calculation error in the table provided in the Original Press Release on calculated Titanium values for six samples. The Company has corrected the Ti% values on samples 884117, 884118, 884121, 884122, 884128 and 247004, the first six listed in the table in the Original Press Release, in the revised table below. The Company sincerely apologizes for the error.
Table 1 – Selected 2024 Assay and Lithogeochemical Samples Metal Analytical ResultsThe technical and scientific information in this news release has been reviewed and approved by Dr. Derek H.C Wilton, P.Geo., FGC, who is a 'qualified person' as defined under National Instrument 43-101 – Standards of Disclosure for Mineral Projects ('NI 43-101'). Mr. Wilton is an honourary research professor of Economic Geology at Memorial University in St. John's and is independent of the Company for the purposes of NI 43-101.
The lithogeochemical samples reported here were whole rock pieces, collected from outcrop and historical drill core by Dr. Wilton during fieldwork in September/October 2024. These samples were sealed in labelled plastic bags in the field. All sample bags were photographed and transported to Thunder Bay, ON, by secure courier. The samples were analysed by ALS Geochemistry Ltd. in Thunder Bay using ME-ICP06 whole rock and ME-MS61L analytical protocols. Samples with over limit Ni contents were re-assayed using OG-46 Aqua-Regia overlimit method. Quality control results, including the laboratory's own control samples, were evaluated immediately.
The assay drill core and rock samples were placed in labelled, sealed plastic bags and delivered to Eastern Analytical of Springdale, NL, an ISO/IEC 17025 certified facility. The samples were analysed using ICP 34 (inductively coupled plasma) analytical protocols. Samples with over limit Ni and Fe contents were re-assayed using Eastern's Ore Grade Assay (multi acid digestion) overlimit method. Quality control results, including the laboratory's control samples, were evaluated immediately. 1
1 The Company reminds investors that surface rock samples are select samples and may not be representative of all mineralization on the Taylor Brook property.
About Churchill Resources Inc.
Churchill Resources Inc. is a Canadian exploration company focused on high grade, magmatic nickel sulphides in Canada, principally at its prospective Taylor Brook and Florence Lake properties in Newfoundland & Labrador. The Churchill management team, board and its advisors have decades of combined management experience in mineral exploration and in the establishment of successful publicly listed mining companies, both in Canada and around the world. Churchill's Taylor Brook and Florence Lake projects have the potential to benefit from the province's large and diversified minerals industry, which includes world class nickel mines and processing facilities, and a well-developed mineral exploration sector with locally based drilling and geological expertise. Further Information
For further information regarding Churchill, please contact:
Churchill Resources Inc.
Paul Sobie, Chief Executive Officer
Tel.
+1 416.365.0930 (o)
+1 647.988.0930 (m)
Email
psobie@churchillresources.com
Alec Rowlands, Corporate Consultant
Tel.
+1 416.721.4732 (m)
Email
arowlands@churchillresources.com
Cautionary Note Regarding Forward Looking Information
This news release contains "forward-looking information" and "forward-looking statements" (collectively, forward-looking statements") within the meaning of the applicable Canadian securities legislation. All statements, other than statements of historical fact, are forward-looking statements and are based on expectations, estimates and projections as at the date of this news release. Any statement that involves discussions with respect to predictions, expectations, beliefs, plans, projections, objectives, assumptions, future events or performance (often but not always using phrases such as "expects", or "does not expect", "is expected", "anticipates" or "does not anticipate", "plans", 'proposed', "budget", "scheduled", "forecasts", "estimates", "believes" or "intends" or variations of such words and phrases or stating that certain actions, events or results "may" or "could", "would", "might" or "will" be taken to occur or be achieved) are not statements of historical fact and may be forward-looking statements. In this news release, forward-looking statements relate to, among other things, , the Company's objectives, goals and exploration activities conducted and proposed to be conducted at the Company's properties; interpretation of recent exploration results; future growth potential of the Company, including whether any proposed exploration programs at any of the Company's properties will be successful; exploration results; and future exploration plans and costs and financing availability.
These forward-looking statements are based on reasonable assumptions and estimates of management of the Company at the time such statements were made. Actual future results may differ materially as forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company to materially differ from any future results, performance or achievements expressed or implied by such forward-looking statements. Such factors, among other things, include: the expected benefits to the Company relating to the exploration conducted and proposed to be conducted at the Company's properties; failure to identify any mineral resources or significant mineralization; the preliminary nature of metallurgical test results; uncertainties relating to the availability and costs of financing needed in the future, including to fund any exploration programs on the Company's properties; fluctuations in general macroeconomic conditions; fluctuations in securities markets; fluctuations in spot and forward prices of gold, silver, base metals or certain other commodities; fluctuations in currency markets (such as the Canadian dollar to United States dollar exchange rate); change in national and local government, legislation, taxation, controls, regulations and political or economic developments; risks and hazards associated with the business of mineral exploration, development and mining (including environmental hazards, industrial accidents, unusual or unexpected formations pressures, cave-ins and flooding); inability to obtain adequate insurance to cover risks and hazards; the presence of laws and regulations that may impose restrictions on mining and mineral exploration; employee relations; relationships with and claims by local communities and indigenous populations; availability of increasing costs associated with mining inputs and labour; the speculative nature of mineral exploration and development (including the risks of obtaining necessary licenses, permits and approvals from government authorities); the unlikelihood that properties that are explored are ultimately developed into producing mines; geological factors; actual results of current and future exploration; changes in project parameters as plans continue to be evaluated; soil sampling results being preliminary in nature and are not conclusive evidence of the likelihood of a mineral deposit; title to properties; and those factors described in the most recently filed management's discussion and analysis of the Company. Although the forward-looking statements contained in this news release are based upon what management of the Company believes, or believed at the time, to be reasonable assumptions, the Company cannot assure shareholders that actual results will be consistent with such forward-looking statements, as there may be other factors that cause results not to be as anticipated, estimated or intended. Accordingly, readers should not place undue reliance on forward-looking statements and information. There can be no assurance that forward-looking information, or the material factors or assumptions used to develop such forward-looking information, will prove to be accurate. The Company does not undertake to release publicly any revisions for updating any voluntary forward-looking statements, except as required by applicable securities law.
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies of the TSXV) accepts responsibility for the adequacy or accuracy of this news release.
A photo accompanying this announcement is available at https://www.globenewswire.com/NewsRoom/AttachmentNg/50785593-e423-45f2-be31-6995016a2b9eSign in to access your portfolio
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
an hour ago
- Yahoo
WPP CEO Mark Read to Retire at Year-End
Read—who has been at the company for more than 30 years—will retire from the board and as CEO on Dec. 31.
Yahoo
2 hours ago
- Yahoo
Power Metallic Acquires 167KM² from Li-FT Power, Expanding Nisk - Lion Polymetallic Project Area by over 300%
TORONTO, June 9, 2025 /PRNewswire/ - Power Metallic Mines Inc. (the "Company" or "Power Metallic") (TSXV: PNPN) (OTCBB: PNPNF) (Frankfurt: IVV) is pleased to announce it has executed a definitive agreement dated June 9, 2025 to acquire a 100 % interest in 313 mineral claims totalling 167 km² from Li-FT Power Ltd. ("Li-FT") (TSXV: LIFT) (OTCQX: LIFFF) (FRA: WS0). The claims adjoin the Company's 45.86 km² Nisk property, where exploration is expanding the high–grade Lion Cu–PGE discovery and the Nisk Ni–Cu–Co deposit. On closing, Power Metallic's land position will grow more than 300% to ~212.86 km², securing approximately 20 km of strike on the northern basin margin and 30 km on the southern margin that envelope the Nisk, Lion, and Tiger discoveries. Nisk Project Area The Nisk-Lion-Tiger discoveries have established a new polymetallic district with considerable potential for additional deposits. These deposit types are globally rare but form clusters at district and camp scale (Noril'sk and Talnakh, Kevitsa and Sakatti, as relevant examples). Currently discovered polymetallic mineralization on the Nisk property has been confined to a major translithospheric structure along the sedimentary basin margin defining the locations of the Nisk, Lion, and Tiger discoveries (Figure 1 map of original Nisk targets overlain on geology). Work by Power Metallic and Li-FT has identified a larger region proximal to the Nisk property that has additional potential for polymetallic deposits. Significantly Power Metallic sees potential in the wider basin where exploration to date suggest conditions similar to those at the Nisk-Lion-Tiger discoveries. The land purchased from Li-FT covers a further 20 km of strike length along the northern margin of the basin that contains Nisk-Lion-Tiger, and the most prospective 30 km of strike length along the southern basin margin, which has been identified by Power Metallic through regional geophysics as prospective, and corroborated by extension soil and till elemental anomalies from surveys carried out by Li-FT (Figure 2 map of regional play with New property, showing relative size with original Nisk property). The control of the most readily accessible prospective geology proximal to the known mineralizing system (Nisk-Lion-Tiger) gives Power Metallic the opportunity to control the discovery of multiple polymetallic deposits within the identified regional system across both its 80% owned properties and its 100% owned properties. Steve Beresford, Director and Special Advisor, stated:"Polymetallic deposits have unique primary and secondary geochemical footprints (that contrast with Nickel dominant sulfide deposits like Voisey's Bay) that enable us to recognize early the tip of the iceberg i.e. extensions of Lion or mimics that represent new camp to district scale opportunities. We know a lot about how these deposits spatially cluster that's different to lode Au or VMS, and now is the time to own the whole opportunity". Purchase Agreement TermsThe purchase of the 100% interest in the claims (exclusive exploration rights) requires a $700,000 cash payment to Li-FT and the issuance of 6,000,000 common shares of the Company (the "Shares"). All the Shares will have a statutory hold period of four months and a day from issuance in accordance with Canadian securities laws. 3,000,000 of the 6,000,000 Shares will also bear a 12 month hold and restriction from transfer. Additionally, Li-FT will retain a 0.5% NSR on all acquired claims. The share–weighted consideration preserves cash for drilling while giving both Power Metallic and Li–FT exposure to the exploration upside in the basin. The issuance of the Shares is subject to the Company's receipt of approval from the TSX Venture Exchange. Fully Funded 100,000–Metre Drill Program Through 2026 The drilling rig has been collared on the first hole of the summer program. We are resuming work along the Nisk–Lion–Tiger trend while integrating its newly acquired LIFT claims—an expansion that increases the Company's land position more than 300%. Field crews will mobilize in successive waves beginning the last week of May, with camp upgrades—including grid–power wiring for new core–logging facilities—well underway. Drilling will initially recommence in the Nisk-Lion-Tiger area to expand current zones. It is anticipated that by early fall of 2025 the core facility capacity will be ramped up to six drills enabling quicker exploration target turnaround and flexibility to follow exploration successes on the expanded Nisk Project Area. Key elements of the work program District–scale data integration. Historical technical data from the LIFT claims are being compiled alongside existing datasets to refine regional targeting. Airborne & ground geophysics. A large–scale airborne EM survey—followed by targeted ground EM—will seek near–surface conductors. Systematic mapping and prospecting. Field teams will focus on areas highlighted by Li–FT's previous geochemical anomalies, moving from regional reconnaissance to detailed mapping and sampling as anomalies are confirmed. Follow–up drilling. Once preliminary geophysics and mapping results are interpreted, priority targets, primarily confirmed by EM, will be drilled through late 2025 and into the 2026 winter season. Terry Lynch, CEO, stated:"Consolidating the LIFT ground lets us apply the geological insights from Nisk across a district–scale footprint. With over 100,000 metres of fully funded drilling in front of us, we can systematically approach new sulphide occurrences while continuing to grow our established resources." JC Evensen, Strategic Advisor, added:"The opportunity to consolidate control of this emerging polymetallic mineral district will allow Power Metallic to fully explore and understand its potential before determining the value maximizing development pathway for all stakeholders involved. The discovery of Lion transformed how this area was understood geologically, and now, with the counsel of Steve Beresford on the board, Joe Campbell, Adam Findlay and the entire exploration team have an opportunity to see if there is something better than Lion to be discovered." A more detailed summer exploration plan—updated to reflect the expanded acreage—will be released within the next 2–4 weeks. Qualified PersonJoseph Campbell, VP Exploration at Power Metallic, is the qualified person who has reviewed and approved the technical disclosure contained in this news release. About Power Metallic Mines Inc. Power Metallic is a Canadian exploration company focused on advancing the Nisk Project Area (Nisk–Lion–Tiger)—a high–grade nickel–copper–PGE, gold and silver system—toward Canada's next polymetallic mine. On 1 February 2021, Power Metallic (then Chilean Metals) secured an option to earn up to 80% of the Nisk project from Critical Elements Lithium Corp. (TSX–V: CRE). Following the June 2025 purchase of 313 adjoining claims (~167 km²) from Li–FT Power, the Company now controls ~212.86 km² and roughly 50 km of prospective basin margins. Power Metallic is expanding mineralization at the Nisk and Lion discovery zones, evaluating the Tiger target, and exploring the enlarged land package through successive drill programs. Beyond the Nisk Project Area, Power Metallic indirectly has an interest in significant land packages in British Columbia and Chile, by its 50% share ownership position in Chilean Metals Inc., which were spun out from Power Metallic via a plan of arrangement on February 3, 2025. Neither the TSX Venture Exchange nor its Regulation Services Provider accepts responsibility for the adequacy or accuracy of this release. Cautionary Note Regarding Forward-Looking Statements This message contains certain statements that may be deemed "forward-looking statements" concerning the Company within the meaning of applicable securities laws. Forward-looking statements are statements that are not historical facts and are generally, but not always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates," "projects," "potential," "indicates," "opportunity," "possible" and similar expressions, or that events or conditions "will," "would," "may," "could" or "should" occur. Although the Company believes the expectations expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future performance, are subject to risks and uncertainties, and actual results or realities may differ materially from those in the forward-looking statements. Such material risks and uncertainties include, but are not limited to, among others; the timing for various drilling plans; the ability to raise sufficient capital to fund its obligations under its property agreements going forward and conduct drilling and exploration; to maintain its mineral tenures and concessions in good standing; to explore and develop its projects; changes in economic conditions or financial markets; the inherent hazards associates with mineral exploration and mining operations; future prices of nickel and other metals; changes in general economic conditions; accuracy of mineral resource and reserve estimates; the potential for new discoveries; the ability of the Company to obtain the necessary permits and consents required to explore, drill and develop the projects and if accepted, to obtain such licenses and approvals in a timely fashion relative to the Company's plans and business objectives for the applicable project; the general ability of the Company to monetize its mineral resources; and changes in environmental and other laws or regulations that could have an impact on the Company's operations, compliance with environmental laws and regulations, dependence on key management personnel and general competition in the mining industry. View original content to download multimedia: SOURCE Power Metallic Mines Inc. Error in retrieving data Sign in to access your portfolio Error in retrieving data Error in retrieving data Error in retrieving data Error in retrieving data
Yahoo
13 hours ago
- Yahoo
GreenPower Closes Third Tranche of Term Loan Offering
VANCOUVER, BC, June 8, 2025 /CNW/ -- GreenPower Motor Company Inc. (Nasdaq: GP) (TSXV: GPV) ("GreenPower" and the "Company"), a leading manufacturer and distributor of all-electric, purpose-built, zero-emission medium and heavy-duty vehicles serving the cargo and delivery market, shuttle and transit space and school bus sector, announces the closing of the third tranche of its previously announced secured term loan offering for an aggregate principal amount of U.S. $300,000 (collectively the "Loans"). Please refer to the Company's news release dated May 13, 2025 for more details regarding the term loan offering. In connection with the Loans, the Company entered into respective loan agreements with companies controlled by the CEO and a Director of the Company (the "Lenders"). Management anticipates that the Company will allocate the net proceeds from the Loans towards production costs, supplier payments, payroll and working capital. The Loans are secured with a general security agreement on the assets of the Company subordinated to all senior debt with financial and other institutions and will bear interest of 12% per annum commencing on the date of closing (the "Closing Date") to and including the date all of the Company's indebtedness pursuant to the Loans is paid in full. The term of the Loans will be two years from the Closing Date. As an inducement for the Loan, the Company issued 340,909 non-transferable share purchase warrants (each, a "Loan Bonus Warrant") to one of the Lenders. Each Loan Bonus Warrant entitles the holder to purchase one common share of the Company (each, a "Share") at an exercise price of U.S. $0.44 per Share for a period of twenty-four (24) months from the closing date of the Loan. In addition, one Lender will be issued an aggregate of 68,181 Shares (each a "Loan Bonus Share"). The Lenders are each considered to be a "related party" within the meaning of Multilateral Instrument 61-101 Protection of Minority Security Holders in Special Transactions ("MI 61-101") and each of the Loans and issuance of Loan Bonus Warrants and Loan Bonus Shares, as applicable, is considered to be a "related party transaction" within the meaning of MI 61-101 but each is exempt from the formal valuation requirement and minority approval requirements of MI 61-101 by virtue of the exemptions contained in section 5.5(a) and 5.7(a) as the fair market value, in each case, of the Loans, the Loan Bonus Warrants, and the Loan Bonus Shares, as applicable, is not more than 25% of the Company's market capitalization. All securities issued in connection with the Loans will be subject to a statutory hold period of four months plus a day from the closing of the Initial Loan in accordance with applicable securities legislation. For further information contact: Fraser Atkinson, CEO (604) 220-8048 Brendan Riley, President(510) 910-3377 Michael Sieffert, CFO(604) 563-4144 About GreenPower Motor Company designs, builds and distributes a full suite of high-floor and low-floor all-electric medium and heavy-duty vehicles, including transit buses, school buses, shuttles, cargo van and a cab and chassis. GreenPower employs a clean-sheet design to manufacture all-electric vehicles that are purpose built to be battery powered with zero emissions while integrating global suppliers for key components. This OEM platform allows GreenPower to meet the specifications of various operators while providing standard parts for ease of maintenance and accessibility for warranty requirements. GreenPower was founded in Vancouver, Canada with primary operational facilities in southern California. Listed on the Toronto exchange since November 2015, GreenPower completed its U.S. IPO and NASDAQ listing in August 2020. For further information go to Forward-Looking Statements This news release includes certain "forward-looking statements" under applicable Canadian securities legislation that are not historical facts. Forward-looking statements are not based on historical facts, but rather on current expectations and projections about future events, and are therefore subject to risks and uncertainties which could cause actual results to differ materially from the future results expressed or implied by the forward-looking statements. These statements generally can be identified by the use of forward-looking words such as "upon", "may", "should", "will", "could", "intend", "estimate", "plan", "anticipate", "expect", "believe" or "continue", or the negative thereof or similar variations. Forward-looking statements in this news release include, but are not limited to, statements with respect to the expectations of management regarding the use of proceeds of the Loan. Although the Company believes that and the expectations reflected in the forward-looking information are reasonable, there can be no assurance that such expectations will prove to be correct. Such forward-looking statements are subject to risks and uncertainties that may cause actual results, performance or developments to differ materially from those contained in the statements including that the proceeds of the Loan may not be used as stated in this news release, and those additional risks set out in the Company's public documents filed on SEDAR+ at and with the United States Securities and Exchange Commission filed on EDGAR at Although the Company believes that the assumptions and factors used in preparing the forward-looking statements are reasonable, undue reliance should not be placed on these statements, which only apply as of the date of this news release, and no assurance can be given that such events will occur in the disclosed time frames or at all. Except where required by law, the Company disclaims any intention or obligation to update or revise any forward-looking statement, whether as a result of new information, future events, or otherwise. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release. ©2025 GreenPower Motor Company Inc. All rights reserved. View original content to download multimedia: SOURCE GreenPower Motor Company View original content to download multimedia: