
Monmouthshire County Hall swift tower cost confirmed
The 'Swift Tower' is also intended to be a 'prominent piece of art' to highlight the 'iconic, declining urban bird, and to inspire individuals to take action to help swifts and other urban nature' and highlight how the council is is supporting nature recovery across the county.
The cost of the tower as well as design costs and planning permission was covered by funding from the UK Government's Shared Prosperity Fund which awarded funding for the Gwent Green Grid project in 2024/25.
Monmouthshire County Council said the cost for the tower was £18,500 though that figure doesn't include VAT.
Councillor Catrin Maby, the council's Labour cabinet member for the environment, said: 'This swift tower is an excellent way to ensure that we continue to see breeding pairs at County Hall for many years to come.
'Hopefully it can prove to be a small step towards the recovery of swift populations in the near future.'
Monmouthshire County Council hopes to support further swift project work through Welsh Government Local Places for Nature funding during 2025 to 2027.
The tower is in the 'Incredible Edible' community garden area, which is open to the public, within the grounds of Monmouthshire County Council's headquarters at The Rhadyr also known as County Hall.
The site has been selected as the best option for Usk, as it will be noticeable to swifts passing as they feed along the river Usk.
Swifts had been using J Block at County Hall, before an adjoining walkway was built in 2018.
They nest almost exclusively in buildings, making use of holes to raise their young, but are losing nesting sites with old buildings being renovated to improve insulation or demolished.
Swifts pair for life, returning to the same nest site each year but have recently been put on the Red List of Birds of Conservation Concern as populations across the UK have declined by 58 per cent since 1995, and 75 per cent in Wales.
Monmouthshire County Council's planning department, which had to approve the structure, had caused confusion over the source of funding as it stated it was from the Welsh Government.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles

South Wales Argus
2 days ago
- South Wales Argus
Chepstow Tennis Club revised clubhouse plan approved
Plans were first approved for a replacement base for Chepstow Tennis Club four years ago in July 2021. But while a fourth court, for juniors with a practice wall, and LED floodlights approved in 2021 have been put in place at Mathern Road the not-for-profit community sports club was struggling to finance the new clubhouse. In May this year it submitted revised plans for a lower-cost above-ground clubhouse structure in place of the originally approved design which would also have a reduced height, at a maximum of three metres, and a smaller floor area compared to the original plans. The originally proposed building was to be finished in render with timber cladding while the alternative will be finished in timber cladding with part natural colour and part grey. The roof will be grey coloured bitumen sheets. Monmouthshire County Council planning officer Kate Young said no third parties would be affected by making the building smaller or by altering the finishing materials and the difference in materials aren't so signficiant the impact would affect the street scene and the changes could be accepted as non-material amendments and approved. When the revised application was made, by club official Ben Durman, he said it had around 50 per cent of the funding required will be looking for support from grant giving bodies and it has worked with a quantity surveyor to manage costs. Mr Durman said at the time of the application: 'We hope to be able to go full steam ahead with fundraising once the planning permission hopefully comes through.'

South Wales Argus
2 days ago
- South Wales Argus
Radio Wales presenter fronts a campaign in run up to results season
Aleighcia Scott said: 'When I was in school, I remember feeling that if I did badly in my exams then my whole life was over. 'There is so much pressure on young people nowadays, seeing what their friends are doing and comparing their achievements. 'Results day can be a particularly stressful or anxious time, especially if they're not confident about their next steps. But I want them to know that whatever happens, there is support out there for them, they have choices, and it will be okay. 'You don't have to have your life plan figured out by the time you leave school or college, even if it feels like everyone else does. There are so many different paths to get you where you want to go and finding something you love can take time. 'Music has always been my passion, but I didn't know how to begin my career. My parents gave me the confidence to pursue my dreams.' As part of the Welsh Government's Young Person's Guarantee, anyone aged between 16 and 24 can access help to find a place in education or training, secure a job, or start their own business. Support is delivered through Working Wales, where young people can speak directly with an expert careers adviser for guidance tailored to their individual goals and circumstances. Nikki Lawrence, chief executive of Careers Wales, said: 'Results day can be a daunting experience, but it's important to remember that there's no single path to success. Our team is ready to help young people find the route that's right for them.' Jack Sargeant, minister for culture, skills and social partnership, said: "As thousands of young people across Wales receive their results, I want them to know that whatever those results show, their future remains bright and full of potential."

South Wales Argus
2 days ago
- South Wales Argus
Monmouthshire barn extension refused over arrow slits
Emma Dymond had sought planning permission and listed building consent from Monmouthshire County Council to allow open access from her kitchen, in the barn that was converted to a home in either the late 1990s or early 2000s, to the proposed single storey extension. But that was rejected by the council's planning department in January and the decision has been upheld by an independent planning inspector after Ms Dymond appealed to Planning and Environment Decisions Wales. The inspector, identified only as JP Tudor, said they agreed covering the arrow slit vent would have an adverse effect on the significance of Ms Dymond's home, North Barn, which is an associated building of the grade II-listed Whitehouse Farmhouse at Llanvair Grange Road, Llanfair Kilgeddin. Whitehouse Farm was listed in 1991 for its architectural and historical importance as a substantial early 17th century house while the barn, now in separate ownership, is considered to retain 'significance as an example of a substantial former agricultural threshing barn, possibly dating from the 18th century'. The council had said a lean-to could be acceptable but the one proposed would involve the unacceptable removal of a large part of the rear external wall to create the opening from the kitchen. This photograph shows where it was proposed to build the lean-to extension and the arrow slit vents, and window, that would have been lost. Tudor's report stated: 'That would entail the loss of one of two arrow slit vents within that section of the wall.' Ms Dymond had said the timber frame extension would be sympathetic to the original building and a modern window added during the original conversion would also have been removed while she said the arrow slits had been rebuilt in a non-traditional square-sided manner. The inspector upheld the council's decisions and also noted Welsh historic buildings body Cadw had 'appeared' to object to the lean-to extension and ancillary works, as well as the proposed opening, but said those elements had been approved in a further application made in January with a smaller proposed opening to the extension.