logo
Plans for £6m chicken farm near university

Plans for £6m chicken farm near university

Yahoo25-06-2025
A proposed new £6m chicken farm with 180,000 birds would be used to help teach university students, according to a planning application.
The four proposed poultry units would be built on land near Harper Adams University, close to Newport, Shropshire.
Meese Farming, a Lilleshall-based firm, submitted the plans to Telford and Wrekin Council and a public consultation has begun on them.
The university itself "expressed strong support for the scheme", planning agent Ian Pick said, in his report for the council's planners.
Harper Adams will not build or run the farm but it favours the plans due to their "significant value as a teaching and research resource for both agricultural and veterinary students", he added.
The university specialises in agriculture and the rural economy.
The proposed farm includes a teaching facility and a viewing area which will be able to be used by students from schools, colleges, and universities, Mr Pick added.
Meese Farming also has a poultry unit at Deepdale Farm in nearby Chetwynd.
The proposed farm will see about £6m spent on the buildings and other facilities at the site, planning documents show.
The business will also need an Environment Agency permit in order to operate.
Meese Farming proposed that the water on its new site would drain through a sealed network, filter drains and filter strips "in order to minimise the risk of contamination to the final watercourse".
Their plans come as river campaigners in Shropshire and Herefordshire have in recent years called for action to protect local waterways from the potential effects of chicken farming and chicken manure.
Campaigners in June won a High Court battle to overturn planning permission for an industrial-scale chicken farm in Felton Butler, near Shrewsbury.
This news was gathered by the Local Democracy Reporting Service, which covers councils and other public service organisations.
Follow BBC Shropshire on BBC Sounds, Facebook, X and Instagram.
River campaigners win chicken farm legal challenge
Rural cinemas holding film nights for farmers
Farmers' tractor demo over tax row goes to council
Telford & Wrekin Council
Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

JERA and BP launch JERA Nex bp joint venture
JERA and BP launch JERA Nex bp joint venture

Yahoo

time3 minutes ago

  • Yahoo

JERA and BP launch JERA Nex bp joint venture

Japanese energy company JERA and BP have completed the establishment of JERA Nex bp, a new 50:50-owned joint venture (JV), dedicated to the development and operation of offshore wind projects. The newly established company will have a net potential generating capacity of 13GW across its portfolio. This includes 1GW of installed net generating capacity, a development pipeline of 7.5GW and an additional secured leases amounting to 4.5GW. JERA and BP announced plans to establish the JV in December 2024. It will utilise both partners' engineering expertise, technical skills in project management and procurement capabilities, as well as strong industry relationships. The partnership combines JERA's expertise in delivering safe project operations with BP's extensive experience in the offshore energy sector. JERA Nex bp CEO Nathalie Oosterlinck stated: 'JERA Nex bp begins life with a strong operating portfolio and an extensive development pipeline. 'We bring together two highly capable teams with the experience, relationships, purchasing power and unique global access of two of the East and West's pre-eminent energy companies. This gives us the expertise and experience to find new ways to create value from offshore wind and become one of the world's leading companies in the sector.' JERA Nex bp's initial focus will be on the disciplined and prioritised development of existing projects within its global pipeline while maintaining safe and efficient operation of current assets in Europe and Asia. The company aims to continuously evaluate its project portfolio based on value creation opportunities while utilising access to external capital for competitive financing options. JERA chief renewable energy officer and JERA Nex CEO Satoshi Yajima said: 'Our partnership with BP has accelerated the growth trajectory of JERA's overall renewable energy strategy, and the completion of the JV formation reflects the strength and agility that will position JERA Nex bp for long-term success. 'With support from both partners, JERA Nex bp will serve as a cornerstone in helping the world realise a decarbonised energy future.' In March 2025, JERA and EDF Trading expanded their JV, JERA Global Markets, to include Japanese power trading. JERA holds a 66.6% stake in the venture, while EDF Trading holds 33.3%. JERA Global Markets acts as the exclusive fuel optimiser for both companies. "JERA and BP launch JERA Nex bp joint venture" was originally created and published by Power Technology, a GlobalData owned brand. The information on this site has been included in good faith for general informational purposes only. It is not intended to amount to advice on which you should rely, and we give no representation, warranty or guarantee, whether express or implied as to its accuracy or completeness. You must obtain professional or specialist advice before taking, or refraining from, any action on the basis of the content on our site. 擷取數據時發生錯誤 登入存取你的投資組合 擷取數據時發生錯誤 擷取數據時發生錯誤 擷取數據時發生錯誤 擷取數據時發生錯誤

‘Momentum growing' in UK plum industry with bumper crop, says grower
‘Momentum growing' in UK plum industry with bumper crop, says grower

Yahoo

time3 minutes ago

  • Yahoo

‘Momentum growing' in UK plum industry with bumper crop, says grower

The UK plum industry has begun to pull out of a 'decades-long decline' with a bumper crop reported this year, a grower has said. Plum production in the UK hit its peak in 1987 with 28,900 tonnes being produced that year, according to Defra figures. Due to lower yields and cheaper imports, the industry then declined, hitting its lowest point in 2008 with total production of just 2,500 tonnes. Since then, growers have adjusted to finding new plum varieties and modern farming systems, and the production this summer is set to be the biggest in three years, according to fruit grower WB Chambers, based in Maidstone, Kent. Its commercial director James Miller said: 'The UK plum industry has now started to pull out of a decades-long decline and the quality of the fruit coming through right now, and the yield, is the best we've seen for ages. 'There is a real momentum growing within the plum industry again.' The UK's plum production area fell from 2,400 hectares in 1985 to 800 hectares in 2017 as growers turned to fruits with higher profitability. Mr Miller added: 'As cheaper imports flooded the market and plum production became less profitable, interest in growing the fruit dwindled. 'But we have now invested in new root stocks as well as modern farming systems such as automatic minimal irrigation and soil moisture analysis.' WB Chambers said the new varieties as well as this year's perfect growing conditions means it has doubled its production from 150 tonnes in 2024 to 300 tonnes this summer. Tesco fruit category buying manager Simon Reeves said: 'We are hearing similar reports from all our growers and main plum supplier that this has been the best harvest for about three years. 'The quality of the British-grown plums arriving at our stores across the UK right now is easily the best we've seen for several years – plump, juicy and sweet.' The grower also said new varieties of plum have a better shelf life that will help cut down on wastage.

Do not let LGBT veterans scheme to ‘become damaged', 45 MPs urge Healey
Do not let LGBT veterans scheme to ‘become damaged', 45 MPs urge Healey

Yahoo

time3 minutes ago

  • Yahoo

Do not let LGBT veterans scheme to ‘become damaged', 45 MPs urge Healey

The Defence Secretary cannot let a payment scheme for LGBT veterans 'become damaged', 45 MPs have said, amid fears some claimants have 'struggled immensely' to receive their money. In a letter to John Healey, the cross-party MPs warned that some veterans facing financial crisis are 'suffering from severe mental health issues' without support 'from the outset'. LGBT veterans who faced mistreatment, including dismissal and bullying, because of their sexuality between July 1967 and January 2000 can make a claim through a financial recognition scheme worth £75 million. Liberal Democrat MP Ben Maguire, who signed the letter, accused the Government of 'now failing the very veterans they pledged to support'. The North Cornwall MP said: 'The slow pace of delivery is unacceptable and causing avoidable distress. 'Many of these LGBT veterans have already endured lifetimes of shame, stigma and rejection.' Mr Maguire added: 'These veterans should not have to suffer all over again because of bureaucratic delays. 'That's why I'm very pleased to have colleagues from right across Parliament join me in demanding faster payments, and clearer transparency, for MPs and the public.' The letter has 46 backers in total, including the Liberal Democrats' defence spokeswoman Helen Maguire, several Labour and Plaid Cymru MPs, and Stonewall charity co-founder Lord Cashman. Dame Caroline Dinenage, the Conservative MP for Gosport who also signed the letter, told the PA news agency that LGBT veterans had faced an 'injustice that's gone on for far too long'. The MPs have requested that the Ministry of Defence (MoD) 'widens the criteria for prioritisation to include all those in financial crisis', to applicants 'who are in most need of a swift decision suffering from financial crisis – not just when they are in ongoing bankruptcy proceedings in court'. Fast-tracked applicants under the existing scheme include claimants who are facing bankruptcy or having their home repossessed through a court process. 'Many of these veterans who are in financial crisis, but are not yet in the court system, are still suffering from severe mental health issues because of a lack of financial support provided by the redress scheme from the outset,' the MPs warned. They suggested that instead of making veterans who were dismissed or administratively discharged wait for their full award, 'by making an immediate payment of £50,000 to all these veterans who qualify, the MoD can alleviate the pressure and anger being felt by this community and would provide a quick win for the MoD' before a panel considers whether to issue further payouts on a case-by-case basis. 'These veterans have struggled immensely to progress their claims, and after years of waiting for signs of hope are still waiting for settlement and closure,' the MPs added. 'We cannot allow this process to become damaged in the same way as other compensation schemes have.'

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into a world of global content with local flavor? Download Daily8 app today from your preferred app store and start exploring.
app-storeplay-store