
H.M. Electro Mech Limited Net Profit in FY25 rise 4.25% to Rs. 8.35 crore
PNN
New Delhi [India], June 7: H.M. Electro Mech Limited, engaged in the field of turnkey projects of supply, installation, testing and commissioning of pumping machineries along with comprehensive operation and maintenance has reported net profit of Rs. 8.35 crore for the financial year ended March 2025, rise of 4.25% as compared to the net profit of Rs. 8.01 crore reported in the financial year 2023-24. Revenue from operations of the company for the FY25 was reported at Rs. 121.67 crore, rise of 3.96% Y-o-Y as compared to the revenue from operations of Rs. 117.03 crore.
The company has shown strong financial performance in the fiscal year ending March 31, 2025. Revenue from operations grew by 3.96% year-on-year, reaching Rs12,166.69 lakh, compared to Rs11,703.45 lakh in the previous year. On a half-yearly basis, revenue saw a significant jump of 68.01%, from Rs4,539.59 lakh in September 2024 to Rs7,627.09 lakh in March 2025. EBITDA also improved, increasing by 5.29% year-on-year to Rs1,330.01 lakh and by 42.23% half-yearly. The EBITDA margin stood at 10.93%, reflecting a modest gain of 1.27% annually despite a slight dip of 1.86% on a half-yearly comparison. Profit After Tax (PAT) rose by 4.25% year-on-year to Rs835.07 lakh, with a robust 50.88% increase in the half-yearly figure. The PAT margin remained stable at 6.86%, showing a marginal improvement over the previous year. These results highlight the company's resilience and consistent growth across key financial metrics.
About H.M. Electro Mech Limited:
H.M. Electro Mech Limited is engaged in the field of turnkey projects of supply, installation, testing and commissioning of pumping machineries along with comprehensive operation and maintenance. Initially the core Business of the Company was Infra projects related to water supply scheme involving Pumping Machineries and allied accessories for water and waste water. Over the years it has diversified in the field of electrification projects with Indian railways, Nationalized Banks and Municipal Corporations.
it has also started EPC (Engineering, Procurement and Construction) field projects which involves laying cross country pipe line and civil work related to water supply projects including construction of water treatment plant (WTP), Civil Work for Pump Houses, Diesel Generating Sets, Panel Room, Instrumentation, PLC-SCADA. The company is also engaged in sale of products which includes Pump, Pipes, Transformer, Motor and Other Electronic Accessories.
H.M. Electro Mech Limited is ISO 9001:2015 certified and Class 'AA' (highest category for EPC Contracts - unlimited bidding capacity subject to fulfilment of other tender conditions) with Irrigation division of Government of Gujarat. It is authorized by Government of Gujarat Energy and Petrochemicals Department to carry out Electrical Installation Works in the Gujarat State.
Disclaimer:
Certain statements in this document that are not historical facts are forward looking statements. Such forward-looking statements are subject to certain risks and uncertainties like government actions, local, political or economic developments, technological risks, and many other factors that could cause actual results to differ materially from those contemplated by the relevant forward-looking statements. The Company will not be in any way responsible for any action taken based on such statements and undertakes no obligation to publicly update these forward-looking statements to reflect subsequent events or circumstances.
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
&w=3840&q=100)

Business Standard
an hour ago
- Business Standard
UP CM directs officials to take action against fake, shell companies
Uttar Pradesh Chief Minister Yogi Adityanath on Saturday directed officials to take action against shell companies to stop the attempts to misuse the facilities meant for genuine traders. While conducting a high-level review of the State Tax Department, the CM directed officials to ensure transparency in tax collection and adopt a policy of technological efficiency and strict enforcement. "Tax evasion is a national crime that negatively impacts development plans and welfare schemes," he said. Stressing that the Goods and Services Tax (GST) is a consumer-based tax system, he noted that areas with higher population density are naturally expected to generate more tax revenue. He instructed officials to develop special strategies for zones where tax collection is below average. Adityanath directed that information on suspicious firms registered under Central GST (CGST) be shared with the Centre for cancellation of their registration. For firms under State GST (SGST), he ordered in-depth departmental investigations, and if irregularities are found, their registration should be canceled and FIRs lodged. The CM emphasised the need for on-site inspection of all newly registered firms, stating "fake companies should not be allowed to obstruct the rights of honest taxpayers. CM Adityanath said that such acts are an attempt to misuse the facilities meant for genuine traders, which is unforgivable. Such inspections are essential to ensure that genuine businesses can operate fairly and without interference," he said. During the meeting, officials informed the CM that Rs 18,161.59 crore in GST and VAT had been collected during April and May against the financial year 2025-26 target of Rs 1,75,725 crore.


Time of India
an hour ago
- Time of India
Circular rail network on Bengaluru's outskirts to cost Rs 81,000 crore
Bengaluru: The proposed Circular Rail Link Project on Bengaluru's outskirts requires an investment of Rs 81,000 crore and acquisition of 2,500 acres of land. Spanning 287km, the double-line circular network will connect Nidavanda, Doddaballapur, Devanahalli, Malur, Heelalige, Solur and other peripheral towns. It aims to decongest rail traffic in the city's core areas and cater to residents on the outskirts and nearby districts by enabling more suburban rail services. On Saturday, minister of state for railways V Somanna held a meeting with MPs from Bengaluru and adjoining districts to discuss the project. The railway board sanctioned a final location survey (FLS), which is currently being conducted in phases. The minister said the central govt will fund the entire project. "This is a long-term initiative meant to benefit Bengaluru over the next 50 years," he said. The actual land requirement and cost will be finalised after the detailed project report (DPR) is ready. Completing the FLS is expected to take several months. Camelaram, Panathur works Bangalore Central MP PC Mohan submitted a requisition to Somanna, urging South Western Railway (SWR) to coordinate with BBMP to expedite pending RoB and RuB works at Carmelaram and Panathur. He noted that only 35% of the Carmelaram RoB is complete, causing prolonged closure of Carmelaram-Gunjur Road and affecting commuters. Similarly, the Panathur RuB is stalled due to BBMP's delay in acquiring land needed for the approach road and drainage. Need superfast train to Mumbai: Mohan Mohan called for a superfast train between Bengaluru and Mumbai, pointing out that the current Udyan Express takes over 20 hours. Despite repeated public requests, the railway board hasn't approved a faster service, he said. On the redevelopment of KSR Bengaluru City Railway Station, the MP said the proposal is pending with the railway board. He urged Somanna to initiate a feasibility study for a rapid rail transit system (RRTS) on key corridors such as Bengaluru-Tumakuru, Bengaluru-Ramanagara, Bengaluru-Mandya-Mysuru and Bengaluru-Kolar.


Time of India
an hour ago
- Time of India
Ayurvedic & herbal products manufacturers in Indore ramp up production as Covid cases increase
Indore: As Covid-19 cases are witnessing an uptick, manufacturers of Ayurvedic and herbal products in Indore have ramped up their production capacities, anticipating a surge in demand for immunity-boosting products. Usually, summers remain the lean season for immunity booster syrups and tablets, but the resurgence of Covid-19 cases led to a jump in enquiries, prompting many units to prepare for increased production ahead of their usual season. Ayush Nirmata Sangh secretary Ashish Dubey said, "We are anticipating a surge in demand for immunity boosters as cases of Covid-19 again started to increase. Many units started preparations and are gradually increasing production." Another manufacturer owner of a local Ayurvedic firm Ravi Kumar said, "We saw an increase in enquiries for our immunity products. To meet this demand, we are expanding our operations to ensure we can deliver quality products to our customers promptly. Also, monsoon and winters are main demand period of Ayurvedic products when demand rises." Industry insiders noted that if the consumption of these products would not meet their expectations, they would still find a market during the monsoon and winter seasons when the demand for syrups and immunity boosters typically spikes. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Giao dịch CFD với công nghệ và tốc độ tốt hơn IC Markets Đăng ký Undo Ayurvedic products produced in Indore are distributed across various states in India, including Delhi, Punjab, Maharashtra, Uttar Pradesh, and Uttarakhand, according to local manufacturers. In response to the heightened demand, many manufacturing units are transitioning to automatic production processes, while others are opting for semi-automatic configurations to enhance efficiency. Indore is home to around 240 Ayurvedic medicine manufacturing units, with the total market size exceeding an impressive Rs 1000 crore, as reported by Ayush Nirmata Sangh.