
Tesla in dire straits as reports say company halts production of Cybertruck, Model Y— Where is the stock headed?
Tesla is temporarily shutting down production of its Cybertruck and Model Y vehicles for a week at its Austin, Texas, plant, as per a report. Following the news, the EV maker's stocks had dropped almost 4% on Tuesday, reported CNBC.
Tesla's Third Production Pause in a Year
Business Insider reported, citing a staff meeting where the announcement was made that Cybertruck and Model Y vehicles will halt production from June 30. The EV giant's plan to halt production for maintenance on production lines would be the third such pause at the Austin facility in the past year, as per the report.
ALSO READ:
Supreme Court sides with Tennessee ban on transgender medical care for minors, paving way for similar laws in 24 states
by Taboola
by Taboola
Sponsored Links
Sponsored Links
Promoted Links
Promoted Links
You May Like
I lost my wife, now my son is in danger, please help him!
Donate For Health
Donate Now
Tesla Halts Cybertruck and Model Y Production Ahead of Robotaxi Launch
The delay arrives just days ahead of Tesla's planned debut of its new Model Y robotaxi in Austin, currently scheduled for June 22, according to CNBC. The robotaxi will be equipped with a new version of the company's 'Full Self-Driving' technology, as per the report.
On June 10, Tesla CEO Elon Musk even reposted a video on his social media site X (previously Twitter) of a Model Y robotaxi on a road in Austin, which added to the buzz for the much-anticipated launch, according to CNBC.
Live Events
ALSO READ:
Canada's growth engine stalls: Immigration curbs bring national population rise to zero
Safety Concerns Shadow the Launch
However, public safety advocacy groups have claimed that the EV maker's partially automated driving systems have safety problems, as per the report. The Dawn Project, a technology safety group critical of Tesla's FSD technology, even demonstrated a safety situation using a Model Y equipped with the currently available software to show that it lacked safety, as per CNBC.
National Highway Traffic Safety Administration
data showed that in the United States, Tesla's vehicles with the standard Autopilot package, or a premium 'Full Self-Driving' option, also known as FSD or FSD supervised, have been involved in hundreds of collisions, including dozens of fatalities, reported CNBC.
FAQs
Why is Tesla halting production in Austin?
For scheduled maintenance on the production lines, this will be the third such pause at the facility in a year.
How did the stock market react?
Tesla's stock dropped nearly 4% on Tuesday following the news.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
28 minutes ago
- Time of India
Naidu fast-tracks tobacco procurement amid price slump
1 2 3 V ijayawada: Chief minister Chandrababu Naidu on Wednesday directed the agriculture and marketing officials to expedite the procurement of HD Burley tobacco from the farmers. In view of the falling prices of tobacco, mango, and cocoa, Naidu held a review meeting with the officials to take stock of the procurement after govt intervention fixing the minimum support price (MSP) for all three crops. The chief minister observed that the prevailing market conditions with regard to mango, cocoa, and even tobacco are unprecedented. He stressed the need to stand by farmers in light of the unique challenges and advised officials to adopt a commercial perspective to secure the best possible prices for farmers. Explaining the present situation, the officials informed the chief minister that out of the 80 million kilograms of HD Burley tobacco produced this year, 27 million kilograms were procured, and another 33 million kilograms are being procured by 27 companies. The remaining 20 million kilograms will be procured by the AP Markfed, officials told Naidu. Presently, procurement of tobacco is being done from three centres in Bapatla, two in Guntur, and one each in Palnadu and Prakasam districts. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Skype Phone Alternative Undo Naidu instructed the officials to implement a robust grading system to enhance exports so that farmers get a better price. He instructed them to make all relevant information available for the farmers. The chief minister further said he already discussed the impact of import reduction on palm oil and the increase of GST on mango pulp. He advised the officials to coordinate with the officials in the central govt to get favourable decisions for farmers. He also instructed the formulation of an action plan to establish more fruit processing units across the state. Emphasising the importance of exports aligned with international market requirements, the chief minister reiterated the need to implement best-in-class grading mechanisms. Agriculture minister K Achennaidu and senior officials from the agriculture and horticulture departments attended the meeting. District collectors of Guntur, Bapatla, and Prakasam joined via video conference.


Time of India
28 minutes ago
- Time of India
Incubation Nation: Where ideas reign and entrepreneurs rule
Jaipur: Rajasthan has over 6,165 startups registered with the Department of Information Technology and Communication (DOITC), many of them getting a leg-up through incubation centres mushrooming across the state. The incubation centres—established by govt, private institutions and universities, are contributing to strengthening the state's startup ecosystem. Additional director, DOITC, Tapan Kumar, said, "Our vision through initiatives like iSTART is to transform Rajasthan into a fertile ground for entrepreneurship. We're supporting startups with structured mentoring, seed funding, incubation centres, and access to a wider market. The state is not just creating jobs, it's creating job creators." Of 4,356 approved registered startups, 828 have already been funded with a disbursal of Rs 40.95 crore. The growth has been inclusive in nature, with 2,194 women-led startups breaking stereotypes and building legacies. \The ecosystem also nurtures 139 graduate-run ventures and 109 startups led by students, signalling that innovation is being seeded at the academic level and harvested early. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like Godrej Majesty | Luxurious 3 & 4 BHK Homes at ₹2.39 Cr* Godrej Majesty Learn More Undo Together, these ventures have created nearly 40,000 jobs and attracted Rs 1,005.42 crore in investments. Some examples of home grown startups from Rajasthan include skincare brand Minimalist, DealShare, and e-commerce platform Frontier Market, all of who received early-stage support under the iSTART scheme and unicorns in the making. "We built our first drone prototype using the 3D printer at the incubation centre and tested flight simulations with their VR setup. The mentorship we received helped us avoid early-stage mistakes, and the Rs 5 lakh seed grant gave us the boost we needed to take off," said Nitiman Mathur from Kapexa. "I'm not from a tech background, but with their support, I was able to build my startup's website and app from scratch—even without any technical knowledge," shared Saurabh from KishanBill Agritech. Universities: The Silent Accelerators The unsung hero of Rajasthan's startup success story is its university ecosystem. From Jaipur to Udaipur, institutions are offering co-working spaces, seed grants, mentorship, and technical support—often at negligible costs. "Universities are the earliest touchpoint for entrepreneurial ambition. By offering support with minimal barriers, we're helping students dream bigger and execute faster," said Mahavir Pratap Sharma, startup mentor and key ecosystem enabler. Private incubation centres are also conducting regular mentoring sessions, offering legal and technical hand holding, and connecting startups to industry experts and venture capitalists, making innovation accessible by lowering infrastructure and advisory costs, and raise capital through angel networks, internal grants, and pitch events on campuses and startup conclaves. From students in Tier-2 towns launching tech apps to women entrepreneur starting sustainable brands, Rajasthan's startup ecosystem is proving geography is no barrier when vision meets support, and redefining the state's identity as a land of kings to a land of creators.


Time of India
28 minutes ago
- Time of India
Gurgaon is cleaner but still far from clean after a year of SWEEPing. Here's why
Gurgaon: This time last year, the city had found itself under a garbage siege. Every other turn or roadside corner had heaps of municipal waste rotting away. Near markets and mall parking lots, at entrances to metro stations, and on the most upscale avenues, the problem had spread like rash. This state of affairs forced the state govt to declare a solid waste exigency on June 12, 2024. Municipal management, which the corporation had utterly failed at, was handed over to a committee that was tasked with implementing Solid Waste Environment Exigency Programme (SWEEP). This June 1, the SWEEP mandate officially came to an end. According to MCG records, the civic body spent nearly Rs 290 crore on sanitation in this period. Is the city cleaner for it? Yes. Is the job done? No. Though SWEEP managed to clean up last year's mess, waste collection and processing are still marked by ad hocism. Garbage dumps still pockmark the city, and construction and demolition waste lines roadsides in pockets. The corporation has not been able to meet National Green Tribunal-set targets to clear legacy waste from the Bandhwari landfill or find an alternative site. by Taboola by Taboola Sponsored Links Sponsored Links Promoted Links Promoted Links You May Like 임플란트 29만원 이벤트 임플란트 더 알아보기 Undo And it's still struggling with waste collection from households and its proper segregation. Sanitary inspectors for monitoring MCG commissioner Pradeep Dahiya, who assumed office on May 7 this year, promises there will be visible improvements in three months. He says the corporation is formulating a detailed development strategy for the city and doesn't hesitate to admit that sanitation operations have been marred by "insufficient oversight". To address this concern, MCG has requested Haryana govt to appoint 144 assistant sanitary inspectors through Haryana Kaushal Rozgar Nigam. These inspectors will be tasked with overseeing sanitation operations and ensuring consistent cleanliness standards. Additionally, they will be responsible for monitoring deployment and utilisation of vehicles and equipment. "We are currently in the process of streamlining the system and changes will reflect within three months. The objective of hiring sanitary inspectors is monitoring to ensure our roads are swept regularly, machinery, vehicles, etc are utilised properly, and all sanitation work is carried out efficiently. Besides this, we have tenders for door-to-door waste collection and a separate tender for clearing garbage vulnerable points. My aim is to carry out result-driven tasks and change will be seen in three months," says Dahiya. There are currently 5,824 sanitation workers employed by MCG for the city. The urban local bodies (ULB) department has developed a solid waste management (SWM) portal and mandated the attendance of the sanitation staff through it based on which their salaries will be disbursed. New agencies, backup trash vans The civic body's current focus is on hiring agencies for door-to-door waste collection. For this, three agencies are to be hired since the city will be divided into three clusters for doorstep waste collection. The estimated cost of the project is Rs 424 crore and the duration of the contract is five years, with a two-year extension if work is satisfactory. "Once our doorstep waste collection is robust and contractors ensure waste collected is segregated at source and dumped only at designated waste collection points, waste won't be seen dumped along roads," a senior MCG official told TOI. ULB secretary Vikas Gupta has approved a proposal to hire 400 light commercial vehicles (LCVs), which will be deployed in each of the city's four zones for six months, or until a concessionaire is hired. The interim arrangement, estimated to cost Rs 12 crore, comes with specific instructions — the vehicles won't be authorised to collect user charges from residents. The state govt will decide on user fee collection once a dedicated agency is appointed, according to officials. Debris still awaits concrete solution For C&D (construction and demolition) waste management, MCG plans to use compact, movable processing units. MCG will also assess the possibility of obtaining land within the Global City development zone to set up a permanent C&D waste processing facility, according to sources. Additional commissioner-1 Yash Jaluka has been assigned to conduct a comprehensive evaluation of the functioning and efficiency of the city's only C&D waste processing facility at Basai. As a temporary solution to the construction waste problem, MCG has initiated the tender process to hire an agency to clear 6 lakh MT of debris piled along roads. For Bandhwari, MCG will prepare a comprehensive three-month plan to clear the landfill. MCG plans to identify a separate site to divert fresh waste. Two agencies, which are currently engaged in legacy waste processing, have been issued a show cause notice and warned that they will be blacklisted if work does not pick up pace. The agencies were contracted to process 14 lakh metric tonnes of waste out of which they have processed only 1.5 lakh MT. Local processing plan yet to move Decentralised waste processing is also in works to streamline the city's sanitation, says Dahiya. However, no concrete step has been taken yet in that direction. According to SWM rules, 2016, local authorities should set up material recovery facilities (MRFs) or secondary storage facilities with sufficient space to sort recyclable materials. This will enable informal or authorised waste collectors to separate and collect recyclable materials such as paper, plastic, metal, glass, textile, etc from waste, reducing the overall waste load that goes to the landfill and needs to be processed. Gauri Sarin, convener of a citizen's group called Making Model Gurugram, says she has shared a plan with govt for residential societies, plotted colonies, and commercial bulk waste generators to go for in-situ waste management. "We can significantly reduce the amount of waste monthly and yearly going to the landfill considering the large number of highrises bulk waste generators in Gurgaon. The second part of the plan that we have proposed is to have two to three CBGs (compressed biogas plants) in each zone. These can be 50 to 100 metric tonnes capacity. If MCG provides two acres of land in each zone, these can be easily established," adds Sarin.