
Drainage Services Dept buys three more pumping robots
Each 'mobile powerful pumping robot' can pump up to 800 cubic metres of water per hour. Photo: RTHK
The Drainage Services Department (DSD) said on Tuesday that it has purchased three extra pumping robots, costing about HK$3 million in total, to help cope with the increasing frequency of extreme weather events in Hong Kong.
Torrential rains have struck the city in recent weeks, prompting the observatory to issue four black rainstorm warnings within just eight days.
The department already has three 'mobile powerful pumping robots,' all of which were deployed last week to address severe flooding incidents at locations including Queen Mary Hospital, an underground tunnel near Tai Po Station and a car park in Tseung Kwan O.
Officials said once the robots were deployed, most floods were resolved within one to two hours.
Each robot can pump 800 cubic metres of water per hour, equivalent to one-third of the volume of a standard-sized swimming pool.
They can operate continuously for eight hours and are designed to cope with complex terrain such as stairs and slopes.
When asked how the department decides which locations get priority for the robots, senior engineer Leo Chan said it is hard to pick individual places due to the unpredictability of flooding locations.
'There is great uncertainty in rainstorm events and we are not able to predict where the flooding incident is going to be,' he said.
'So we are going to place the robots strategically in our bases. Our goal is to get to the flooding locations as soon as possible once we receive the service call.'
The robots do have limitations, such as only being able to handle floodwaters up to 60 centimetres deep, Chan said.
To deal with rapidly rising water levels, the department deploys another model of pumping robot, which is smaller but can operate on both land and water, he added.
Chan said more than 30 of the department's staff have been trained to operate water pumping robots and there are plans to arrange training for more employees.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


RTHK
6 hours ago
- RTHK
Delayed start to Food Expo leaves visitors waiting
Delayed start to Food Expo leaves visitors waiting Some residents had to wait for hours for the Food Expo's opening day, which was delayed due to bad weather. Photo: RTHK Bad weather forced Food Expo organisers to start the five-day event later than scheduled on Thursday, leaving visitors hungry for deals while for hours in queues for hours. The Trade Development Council, which organises the fair, pushed back the expo's opening time to 1.10pm – two hours after the Black Rainstorm Warning Signal was downgraded to a red alert. The event in Wan Chai will also stay open for an extra hour to 11pm from Friday to Sunday. Among those who headed to the Convention and Exhibition Centre early was a visitor, surnamed Kwan, who arrived at the venue before 10am. "Everyone here just kept waiting... In the end, the wait got longer and longer," she told RTHK. "Not to mention the elderly, we would get tired after standing for a long time." Another visitor in line, surnamed Wong, arrived shortly after the black rainstorm alert was lowered. "I did not anticipate having to wait for another two hours before it opens," she said. "As customers, we hoped the organisers would be more compassionate and open the expo sooner, so that we did not have to wait for so long." But a resident, surnamed Hung, was not bothered by the wait. "Two hours isn't a long time... There's nothing we can do but to wait," he said. Organisers had hoped to attract 500,000 people to the fair as well as four other events being held at the same time, including the Beauty and Wellness and Home Delights expos. The events combined will showcase around 1,890 exhibitors from 35 countries and regions.


RTHK
10 hours ago
- RTHK
Heavy rain expected to persist: HK Observatory
Heavy rain expected to persist: HK Observatory Authorities have deployed water-pumping machines across Hong Kong. Photo courtesy of the Drainage Services Department The Hong Kong Observatory has cautioned against flooding triggered by torrential downpours as it lowered the Black Rainstorm Warning signal on Thursday. The Red Rainstorm Warning Signal was issued at 11.10am to replace the city's fifth black alert of the year, which lasted for more than three hours. The signal was further lowered to amber at 12.10am. Flooding swept through parts of the city when the black rain signal was in force, with online footage showing water gushing up to the road from a gutter on Water Street in Sai Ying Pun. Meanwhile, the water level on Pok Fu Lam Road was as high as 200 millimetres at one point. The Drainage Services Department said there were six water pumping robots in use, including three newly acquired machines. Five cases of flooding were received as of 10.30am. The Airport Authority said of the flights scheduled before 2pm, five had been cancelled and another 145 delayed. It also said operations on the apron were temporarily suspended when the airport-specific Red Lightning Warning was in force. The Standby Signal No. 1, meanwhile, was cancelled at 12.20pm as Tropical Storm Podul moves further away from the territory. _____________________________ Last updated: 2025-08-14 HKT 12:20


RTHK
10 hours ago
- RTHK
Heavy rain expected to persist: HK Observatory
Heavy rain expected to persist: HK Observatory Authorities have deployed water-pumping machines across Hong Kong. Photo courtesy of the Drainage Services Department The Hong Kong Observatory has cautioned against flooding triggered by torrential downpours as it lowered the Black Rainstorm Warning signal on Thursday. The Red Rainstorm Warning Signal was issued at 11.10am to replace the city's fifth black alert of the year, which lasted for more than three hours. The signal was further lowered to amber at 12.10am. Flooding swept through parts of the city when the black rain signal was in force, with online footage showing water gushing up to the road from a gutter on Water Street in Sai Ying Pun. Meanwhile, the water level on Pok Fu Lam Road was as high as 200 millimetres at one point. The Drainage Services Department said there were six water pumping robots in use, including three newly acquired machines. Five cases of flooding were received as of 10.30am. The Airport Authority said of the flights scheduled before 2pm, five had been cancelled and another 145 delayed. It also said operations at the airport ramp were temporarily suspended when it issued the Red Lightning Warning. The Standby Signal No. 1, meanwhile, will be cancelled at 12.20pm as Tropical Storm Podul moves further away from the territory.