Ferrovial to execute $285m tunnelling project for National Grid, UK
The project is scheduled to run from early 2025 until the first quarter of 2029.
The project is a key component of a range of infrastructure upgrades scheduled for National Grid's "great grid upgrade", representing the biggest modernisation of the UK's electricity network in recent history.
Ferrovial Construction, in collaboration with BEMO, an engineering-driven company, will form the Ferrovial BEMO JV [joint venture] to execute the project.
The work will include the construction of a new 2.2km high voltage (400kv) cable tunnel, two deep 35m shafts (15m and 12m diameter respectively), headhouses and cable sealing end (CSE) compounds.
The Ferrovial BEMO JV will utilise advanced engineering techniques and state-of-the-art technology to meet the highest safety and efficiency standards.
The vertical shaft sinking machine (VSM) solution, recognised for its precise and reliable performance, will be used.
According to the press release, the VSM can excavate and install the final lining from the surface at the same time, significantly reducing construction time and environmental impact, and improving safety.
This technology is suitable for the Grain to Tilbury project due to its usage under groundwater conditions. The project is the second instance of its use in the UK.
Ferrovial Construction has completed other tunnelling projects in the UK: the Thames Tideway tunnel, the Silvertown tunnel, the Northern Line extension and multiple contracts on the Elizabeth Line.
In October 2024, Ferrovial completed the construction of a new satellite control centre for Hisdesat in Madrid, Spain.
"Ferrovial to execute $285m tunnelling project for National Grid, UK" was originally created and published by World Construction Network, a GlobalData owned brand.
The information on this site has been included in good faith for general informational purposes only. It is not intended to amount to advice on which you should rely, and we give no representation, warranty or guarantee, whether express or implied as to its accuracy or completeness. You must obtain professional or specialist advice before taking, or refraining from, any action on the basis of the content on our site.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
5 days ago
- Yahoo
Canadian toll firm hires US construction exec as CEO
This story was originally published on Construction Dive. To receive daily news and insights, subscribe to our free daily Construction Dive newsletter. Jose Espinosa is taking the reins as president and CEO of toll highway company 407 ETR, according to a news release from the Woodbridge, Ontario-based firm. He brings to the role more than 25 years of international experience in tolling and highway infrastructure across the U.S., Canada, Europe and Australia. Espinosa succeeded Javier Tamargo, who served as president and CEO since September 2020, on July 16. Tamargo is now CEO of Austin, Texas-headquartered highway firm Cintra US, a subsidiary of Amsterdam-headquartered civil engineering company Ferrovial. Espinosa also joined the 407 ETR board of directors this month. His appointment is a return to the firm: Between 2009 and 2016, Espinosa worked as corporate shareholder liaison and reporting manager, and later as project director for Highway 407 ETR East operations, per the release. Espinosa recently served as CEO of three North Texas highways — the Lyndon B. Johnson Expressway, North Tarrant Express and North Tarrant Express 35W — where he worked to increase capacity and connectivity on main arteries in the Dallas-Fort Worth area, per the release. Prior to that, he served as CEO at I-77 Mobility Partners in Charlotte, North Carolina. Previously, Espinosa also worked at Ferrovial, starting in 2000 as an analyst in the corporate treasury department and progressing through several management positions at Madrid-based Cintra, according to his company biography page. "Mr. Espinosa comes with a proven track record in complex infrastructure management and is well positioned to lead 407 ETR through its next phase of growth and operational excellence. His global experience will be instrumental as we continue to drive innovation, enhance the customer experience, and deliver long-term value to our stakeholders," said 407 International Board Chair David McFadden in the release. Recommended Reading Sundt promotes from within for Southwest division leader Sign in to access your portfolio
Yahoo
18-07-2025
- Yahoo
National Grid picks Sumitomo Electric for 2GW Sea Link HVDC project
The UK National Grid has chosen Sumitomo Electric Industries, a Japan-based cable manufacturer, as the preferred bidder to supply and install the subsea cable for the 2GW Sea Link high-voltage direct current (HVDC) electricity transmission project. The Sea Link project comprises a 138km undersea cable crossing under the Thames Estuary and southern North Sea, and connecting converter stations in Kent and Suffolk. The project aims to provide clean and affordable energy to households, businesses and public services within those regions and beyond. National Grid chief engineer and offshore delivery director for strategic infrastructure Zac Richardson stated: 'The selection of Sumitomo Electric as preferred bidder, and the use of UK-based cable manufacturing for the first time in decades, is a major step forward. 'It will bring real investment in UK jobs, skills and industrial capability. Sea Link is part of our wider programme of upgrades that will also support around 55,000 jobs across the UK by the end of the decade.' Sumitomo Electric was chosen as the preferred bidder following an extensive tender process. The works will be executed at the company's new under-construction production facility at Port of Nigg, Scotland. The £350m ($407m) investment by Sumitomo Electric into its Nigg factory is expected to create 150 jobs while supporting local businesses and supply chains. Sumitomo Electric Industries managing director Masaki Shirayama stated: 'I am pleased with the preferred bidder position for Sea Link and thank National Grid's team for the evaluation and the decision. 'We plan to manufacture and supply 525kV HVDC cable from our factory in the UK. As proven in other HVDC projects in the region, we are committed to deliver the project in a timely manner with the highest standards of safety and quality.' This announcement follows Siemens Energy's appointment to construct converter stations for the Sea Link project. In August 2024, Sumitomo Electric Industries completed the Greenlink interconnector, linking Ireland and Wales with an HVDC and fibre optic connection. "National Grid picks Sumitomo Electric for 2GW Sea Link HVDC project" was originally created and published by Power Technology, a GlobalData owned brand. The information on this site has been included in good faith for general informational purposes only. It is not intended to amount to advice on which you should rely, and we give no representation, warranty or guarantee, whether express or implied as to its accuracy or completeness. You must obtain professional or specialist advice before taking, or refraining from, any action on the basis of the content on our site. Sign in to access your portfolio
Yahoo
17-07-2025
- Yahoo
How community feedback shapes grid upgrades
East Anglia is at the heart of building Britain's energy future. With more home-grown renewable energy connecting to the network, National Grid's Norwich to Tilbury project is designed to move that cleaner power to homes, businesses and public services across Essex, Norfolk, Suffolk and beyond, boosting energy security and economic growth. Listening to local people is a vital part of how National Grid shapes these projects. Alongside surveys, technical and engineering considerations, feedback received from communities helps guide decisions and improve proposals. Leading this effort on the Norwich to Tilbury project is Becky Cail, lead consents officer. Her job is to make sure what people tell National Grid really counts. With a background in environmental management, Becky joined National Grid two years ago, having previously worked on other major projects including Crossrail and National Grid's Bramford to Twinstead upgrade project. This experience helps her balance environmental concerns with community interests. As Becky explains, feedback comes in many forms – emails, letters, public meetings and informal conversations. 'We read every single submitted comment carefully and identify the changes being requested,' she said. 'That way we can understand what matters most to people and make sure no concerns are missed.' The Norwich to Tilbury project has received around 20,000 pieces of feedback so far. Becky said managing this volume is challenging but rewarding. 'It takes time, but it's worth it,' she added. 'We carefully review each piece of feedback and assess which changes can realistically be made, within the planning rules set by government.' Becky Cail leads the team making sure community feedback is carefully considered every step of the way (Image: National Grid) Becky highlights several examples where community feedback has led to meaningful changes, including concerns raised about the visual impact of overhead power lines near Great Horkesley, close to Dedham Vale National Landscape. As a result, the project team introduced an underground cable section in this sensitive area. 'We have listened to concerns about traffic impact and included plans for temporary haul roads to avoid passing through villages, including the introduction of a bypass haul road at Holton St Mary,' said Becky. 'We also received feedback from Thurrock Airfield, and as a result we have introduced lower height pylons in this location.' These examples show how local knowledge helps improve the project. 'Communities know their areas best,' Becky added. 'When people see their feedback making a difference, it builds trust and shows we're listening.' The process is ongoing. Becky and her team are still reviewing feedback from the consultations. The project will submit a detailed feedback report alongside its development application, including all comments received so far. Previous reports from 2022 and 2023 are already published online. 'We've made hundreds of changes based on what we've heard,' said Becky. 'Listening to people is a key part of developing a project that will bring more renewable energy benefits to everyone.' For more information and to see previous feedback reports, please visit This article is part of LOCALiQ's Clean & Green campaign, which aims to promote our region as the biggest in the UK and Europe for all forms of renewable energy.