
HOEC resumes oil drilling at Kharsang Block after 12 years
Hindustan Oil Exploration Company (HOEC) has announced a significant development at the Kharsang Block in the Assam Arakan Basin, marking the resumption of drilling operations after a 12-year break.
HOEC has resumed drilling at the Kharsang Block in the Assam Arakan Basin after 12 years, completing Well KSG-71, the first of nine planned wells. Early testing shows production of around 250 barrels per day. Drilling of the second well, KSG-72, has started. HOEC holds a 35 per cent interest in the block, operated by its subsidiary Geoenpro Petroleum.
The company successfully completed the drilling of Well KSG-71, the first of nine development wells planned in the current phase. Early production testing of KSG-71 is underway, with oil production rates of around 250 barrels per day using chokes ranging from 6 mm to 8 mm. The well will be tied into production after testing is completed, and the optimal choke size is determined.
Drilling operations for the second well, KSG-72, have also commenced, further advancing the block's development plan.
The Kharsang Block, covering approximately 10 square kilometres, is operated by Geoenpro Petroleum Limited, a wholly owned step-down subsidiary of HOEC, which holds a 10 per cent Participating Interest (PI). HOEC also directly holds a 25 per cent PI, bringing its total interest in the block to 35 per cent.
This development marks a key step in enhancing domestic oil production from the region.
Fibre2Fashion News Desk (VK)

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


News18
2 days ago
- News18
Which Country Has Most Tanks In 2025? India In Top 5
Last Updated: China's rise to the top in 2025 with 6,800 tanks, overtaking the US and Russia, is due to rapid military modernisation, domestic production, and AI integration in warfare Amid growing global security concerns, many countries have significantly increased their defence spending, focusing on strengthening their military capabilities. According to the Global Firepower 2025 report, several nations have expanded their tank fleets. India ranks fifth in the world, while its hostile neighbour Pakistan has dropped to seventh place. According to the Global Firepower Rankings 2025, the top 10 countries based on tank fleet strength are: Rank Country Number of Tanks 1 China 6,800 2 Russia 5,750 3 United States 4,640 4 North Korea 4,344 5 India 4,201 6 Egypt 3,620 7 Pakistan 2,627 8 Türkiye 2,238 9 South Korea 2,236 10 Iran 1,713 India's Well-Balanced And Strategically Deployed Tank Force India's tank force, consisting primarily of T-90, T-72, and Arjun tanks, is geared towards maintaining a balance on both its western border with Pakistan and northern border with China. With 4,201 tanks, India not only surpasses Pakistan but also stands as one of the world's largest tank forces. Despite lagging behind, Pakistan, with 2,627 tanks, remains a significant threat. Pakistan's rapidly modernising tank units and military support from China, including the incorporation of new technology like VT-4 tanks, continue to enhance its capabilities. Why Are Tanks Still Important Tanks remain vital in conventional warfare, despite the prominence of drones, missiles, and cyber warfare in recent years. Tanks provide heavy firepower, can operate in difficult terrain, and offer strong support to infantry. The ongoing Russia-Ukraine conflict underscores their continued importance. China's Massive Leap In Armoured Power China's remarkable rise to the number one position with 6,800 tanks in 2025, surpassing traditional giants like the US and Russia, can be attributed to rapid military modernisation, domestic tank production, and the integration of AI technology. Get breaking news, in-depth analysis, and expert perspectives on everything from politics to crime and society. Stay informed with the latest India news only on News18. Download the News18 App to stay updated!


Time of India
12-06-2025
- Time of India
Vijayapura Airport to be operational by year-end
Vijayapura: The prolonged delay in making the Vijayapura Greenfield Airport operational has drawn criticism from both the business community and local residents. Nearly 98 per cent of the airport construction has been completed, with only minor works remaining. According to the Directorate General of Civil Aviation (DGCA), the airport must have a firefighting facility and obtain environmental clearance. Once these requirements are met, the airport will be inaugurated. Industries minister MB Patil said an order has been placed for two Aircraft Rescue and Firefighting (ARFF) vehicles with the Rosenbauer Company in Austria and the vehicles will arrive soon. "Efforts are on to secure environmental clearance and once it is granted, the airport will be inaugurated," he said. The demand for an airport at Vijayapura — a historical place having great tourism potential — has been a longstanding one, spanning over 50 years. It was Kalingappa B Choudhary who was Bijapur MP in 1977 and 1980 who first put forth the demand for an airport at the then Bijapur in Parliament. However, the response to the demand came just 16 years ago with MP Ramesh Jigajinagi pressing for it again. Rajya Sabha MP Sudha Murty, who has adopted Vijayapura district, had raised a question in the House during the session and sought to know when the airport will be inaugurated. She also sought the answer in writing. The answer to her question was "very soon." Sudha Murty has attachment to Vijayapura district and she has been organising various benevolent programmes in the district for the past 25 years though the Infosys Foundation. "Karnataka govt has developed the infrastructure at the airport and once it becomes operational, other works to upgrade it into an international airport will follow," Patil said. Vijayapura airport has come up on the 727 acres at Buranapur-Madabhavi villages off Vijayapura city by the Airports Authority of India (AAI). When Govind Karjol was the public works minister, he evinced interest in speedying the works and now the airport is ready. Infrastructure The new airport features a passenger terminal building, aircraft apron, singular 1.9km runway and car parking facilities. Basically, it was designed to operate small ATR-72-600 type aircraft at a cost of Rs 95 crore and will be able to handle about 200 passengers during peak hours. The state govt has upgraded the airport to facilitate flying of Airbus-320 by releasing additional Rs 127.9 crore. The civil works have been taken up by the public works department and Karnataka Urban Infrastructure Development Finance Corporation (KUIDFC) has funded the civil works. KSIIDC is the nodal agency for supervising the works. M/s RITES of Gurgaon designed the airport.


Indian Express
08-06-2025
- Indian Express
Hisar-Chandigarh flight twice a week from June 9, Haryana CM Saini to inaugurate service
The newly inaugurated Maharaja Agrasen Airport in Hisar, Haryana, will now offer a direct flight to the state capital, Chandigarh. The first flight from Hisar to Chandigarh is set to operate on Monday. Haryana Chief Minister Nayab Singh Saini will inaugurate the service on Monday at 3.20 pm. The flight is scheduled to arrive in Chandigarh at 4.30 pm. The return flight will depart from Chandigarh at 4.55 pm and is expected to land in Hisar at 5.55 pm. According to the flight schedule of Hisar-Chandigarh released by Alliance Air, the ATR-72 aircraft will operate between the two cities twice a week, with a flight time of approximately 60-70 minutes. The introductory flight tariff has been kept at Rs 1,449-1,704 one way. Prime Minister Narendra Modi inaugurated flight operations from Hisar airport on April 14 by flagging off a Hisar-Ayodhya flight. The distance between Hisar and Chandigarh is 252 km, and the journey takes approximately four to five hours by road. The journey takes approximately seven hours by train. Last month, a train connecting Hisar with Chandigarh was launched from Hisar's Raipur railway station. It departs from Hisar at 2.25 am and reaches Chandigarh at around 9 am. The work at Hisar airport is continuing. The government had bifurcated the construction/expansion work at the airport into three phases. The first phase's work, including the civil aviation domestic terminal and three aircraft hangars, was completed in 2018 at a cost of Rs 50 crore. The runway expansion, from 4,000 feet to 10,000 feet, at a cost of Rs 250 crore, has been completed. The night landing facilities have been installed at the airport. The construction of the Air Traffic Control tower, staff quarters, fire station, and maintenance building has also been completed in the second phase of the airport expansion. In the third phase of the airport's construction/ expansion, the government has earmarked Rs 3,700 crore and aims to complete it by 2030. The Haryana government seeks to develop Hisar airport as an international hub, with the construction of an international terminal planned for the third phase. Chandigarh is connected with over 18 cities on domestic air routes. These include 12 flights to Delhi, six each to Mumbai and Bengaluru, four each to Jaipur, Srinagar, Leh, and Hyderabad, and two each to Ahmedabad, Kolkata, Dharamshala, Indore, Jammu, Lucknow, Chennai, Patna, and Pune. Direct flights from Chandigarh to Ayodhya and Nanded Sahib are also likely to be launched soon.