Public pool reopened after closing last summer
SCRANTON, LACKAWANNA COUNTY (WBRE/WYOU)— After a public pool in Lackawanna County was closed last summer, it's back open this year with some renovations.
The ribbon cutting was held at Connell Park pool in Scranton.
The pool has been in the area since the 1970s and became dilapidated.
The city allocated 1.1 million for the repairs, money that came out of the American Rescue Plan Act.
'In these past five years, we've been able to invest over $26 million in recreational facilities throughout the whole city. All of our neighborhoods from Connell pool here in southside to a cricket pitch in center city, all sorts of dog parks that are new, the pool facilities, the splash pads. There's something for everyone here in Scranton and we're excited to keep building on the amenities,' expressed mayor Paige Cognetti.
Connell Park is one of three outdoor pools open this summer in the Electric City.
The pool will officially open Saturday morning and will be open daily from noon to 6 p.m. through labor day.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles
Yahoo
17 hours ago
- Yahoo
News13 Pet of the Weekend: Martin
The News13 Pet of the Weekend for June 14-June 15 is Martin, a 6-year-old dog available for adoption at the Grand Strand Humane Society. Watch more about Martin in the video player above. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Yahoo
a day ago
- Yahoo
Remodel or replace? Johnstown considers 'way overdue' options for nearly century-old Public Safety Building
JOHNSTOWN, Pa. – As the Johnstown Public Safety Building closes in on the centennial anniversary of its dedication, the structure appears headed toward one of two fates over the coming years. City officials expect to either rehabilitate the facility to make it a clean, modern and structurally sound home for the police and fire departments. Or the structure could be rejected, razed and replaced with a brand-new building somewhere else in the city. Johnstown City Council's ultimate decision about what to do will, in large part, come down to money. A rehab is estimated to cost $10 million or more. Constructing a new building would likely top $20 million. Right now, Johnstown has $5 million for the project – $2.5 million apiece in federal American Rescue Plan Act for COVID-19 pandemic relief money and in state Redevelopment Assistance Capital Program grant funding. 'One of the drawbacks we have there is the funding stack,' Johnstown City Manager Art Martynuska said. 'We have a little, but not enough to do even a remodel.' Public Safety Building | Downtown Johnstown Public Safety Building on Washington Street in downtown Johnstown on Thursday, June 12, 2025. The building, 401 Washington St., was constructed and equipped at an approximate cost of $500,000, according to a Johnstown Tribune article from 1926. Work was done throughout 1925 – the year carved in stone on the front of the building – and 1926. It was formally dedicated Dec. 16, 1926. Sine then, the building has served as home to the fire and police departments that have protected city and regional residents in day-to-day times of need and during major events such as the 1936 and 1977 floods. But the building is now in disrepair. In recent years, the city has done mold remediation, water-proofing of the basement with new drains and sump pumps, and HVAC improvements to make it 'a little bit of a safer facility,' as Martynuska said. 'That's what we've been doing – patching it,' Johnstown City Councilman Ricky Britt said. 'Patches here, patches there. After a while, you don't have anywhere to put a patch. You can only patch it so many times.' Britt said 'the old building has served its use' and 'that the project there is way overdue.' 'We've definitely got our usage out of it,' Britt said. 'Hopefully we find the proper location and come up with the right amount of funds to build a new building.' Britt is among a group of city officials who support a new structure. That would involve finding a site, possibly dealing with floodplain issues in the downtown, and likely needing to knock down the current building so it does not become yet another vacant property in the municipality. Others, including City Councilwoman Laura Huchel, favor upgrading and modernizing the existing structure. 'I feel and think, based on some contributions from the planning commission, that the Public Safety Building can be rehabbed and retrofitted to be exactly what Johnstown needs out of a public safety building,' Huchel said. 'It's a very large building. It's more than we need for our current staff, so there are some rental opportunities there if we make it a welcoming space. 'The expense of doing that, while significant, does not even approach the expense of creating a brand-new building and then being faced with needing to demolish the old one.'
Yahoo
a day ago
- Yahoo
Celebrating Father's Day with the KARK 4 News team
With Father's Day right around the corner, we took the time to celebrate all the dads that are part of the KARK 4 News/FOX 16 News team. Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.