
Rain as wet blanket? Ganesha idol-makers break into a sweat drying up statues
Hubballi: Many artisans who are busy making Ganesha idols in the twin cities, are finding it difficult to meet the demands of customers placing orders for Ganesh Chaturthi, due to heavy rains.
Moderate to heavy rain have been lashing for the past two months.
As the festival is approaching, many are toiling hard to deliver on time. However, the rain has become and hurdle in the idol drying process, said the idol makers.
The artisans, who are supposed to be busy giving final touches to idols, are still busy drying the clay idols. The humidity in the air keeps the idols moist, hence delaying the painting process.
Many fear that if the idols don't dry on time, idols can't be painted and also cannot decorate the idols. Some artisans have even cancelled some orders following heavy rains.
"Ban on POP idols have increased the demand for clay idols, but heavy rain is hampering the idol making process. I have stopped taking fresh orders due to the rain. It has become difficult to dry idols and give final touches. We are using a heater to dry the idols," said Vijayakumar Kamble, an artisan in Bammapur street.
Nabkumar Chitraghar from West Bengal, who is making idols in Ganeshpet, said, "We are now using a gas burner to dry the idols so we can paint and decorate them. We have to deliver 45 idols which are to be installed in public places. We are working 14 to 16 hours daily to meet the expectations. We have erected a big pandal and tin shed to protect idols from the rain," he said.
Eco-friendly idol maker Manjunath Hiremath of Kelgeri said, "It is really a big challenge for artisans to make idols in the rains.
We fix the idol's price before taking orders, and are using artificial techniques like charcoal ovens, heaters, pedestal fans, blowtorches, or gas burners to dry the idols, which is increasing the production cost. Now, we need to find other ways to make idols facing climate challenges," he added.
Satish Murghod, another artist, said, "I had to cancel some orders following the rain, and I am using a heater in the morning and evening to dry the idols." Many other artists said, "If we used heaters or burners to dry the idols, there are chances that it might crack, so we are using fans, heaters, and other methods extra cautiously," they said.
Stay updated with the latest local news from your
city
on
Times of India
(TOI). Check upcoming
bank holidays
,
public holidays
, and current
gold rates
and
silver prices
in your area.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Time of India
30 minutes ago
- Time of India
Relief in Nashik as Godavari recedes after rainfall pauses
Nashik: After a period of heavy rain, the water level of Godavari river in Nashik has started to decrease. On Wednesday, the river's water level reached the chest of the Dutondya Maruti idol, which is a traditional marker for flood. This was a result of 82.9mm rainfall over a 36-hour period. However, as the rain subsided on Thursday, the water level dropped to the idol's waist. The city only received 5.5 mm of rainfall that day. In response, the discharge from Gangapur dam was also reduced, from 7,372 cusec to 5,559 cusec, with the discharge at the weir near Ramkund also decreasing from 11,210 cusec to 7,830 cusec by the evening. Meanwhile, shops on the banks of Godavari remained closed for the second consecutive day. The shopowners had already shifted their goods elsewhere. The India Meteorological Department (IMD) has forecast light to moderate rains for the next four days — from Friday to Monday in five districts of the Nashik region, comprising Nashik, Dhule, Jalgaon, Nandurbar and Ahilyanagar. Many small temples on the riverbed were inundated due to the rise in the level of Godavari river. The rainfall on Wednesday led to waterlogging at around 200 locations across Nashik city. These are the blackspots of the waterlogging and are affected every year during heavy rainfall. Civic teams on Thursday visited such spots and took necessary measures. The heavy rainfall also led to resurfacing of potholes on various roads, making driving risky for the motorists. Municipal commissioner Manisha Khatri held a meeting with the officials of the public works department and instructed them to fill up the potholes at the earliest across the city. Khatri also instructed civic officials to visit the procession routes of Ganesh mandals and take required measures accordingly. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.


Time of India
6 hours ago
- Time of India
Haryana crop damage portal to remain open till Aug 31
1 2 Chandigarh: Haryana chief minister Nayab Singh Saini on Thursday announced that the e-Kshatipurti portal will remain open until Aug 31, allowing farmers from 188 flood-affected villages across seven districts to register claims for crop damage caused by recent flooding, standing water, and heavy rainfall. According to an official spokesperson from the department concerned, the affected villages have been identified based on reports submitted by the respective deputy commissioners. Hisar has the highest number of affected villages at 85, followed by Bhiwani with 43, Rohtak with 21, Palwal with 17, Charkhi Dadri with 13, Rewari with 7, and Sirsa with 2 villages. The portal has been specifically opened for farmers from these villages to facilitate the registration of crop damage claims. The spokesperson also said that district revenue officials will verify the claims submitted on the portal through a Special Girdawari. Based on this assessment, compensation will be disbursed in accordance with the norms laid out under the State Disaster Response Fund (SDRF). The spokesperson urged all eligible farmers to register their claims at the earliest to ensure timely processing. Clarifying the scope of the portal, the spokesperson emphasised that incidents involving floods, standing water, and heavy rainfall are covered under the SDRF norms for compensation. Once a farmer registers a claim, the verification and assessment process will be carried out by revenue officials including the Patwari, Kanungo, circle revenue officer, district revenue officer (DRO), sub-divisional officer (civil), deputy commissioner, and the concerned divisional commissioner. Stay updated with the latest local news from your city on Times of India (TOI). Check upcoming bank holidays , public holidays , and current gold rates and silver prices in your area.


Time of India
19 hours ago
- Time of India
Monsoon windfall: Karnataka rides the wind to record power generation
Bengaluru: After years of fluctuation between El Nino and La Nina conditions, Pacific Ocean's return to a neutral phase in early 2025 not only brought abundant pre-monsoon and monsoon rainfall across India but also provided a major boost to wind energy generation in Karnataka. Tired of too many ads? go ad free now The early onset of both weather systems, along with strong and gusty winds with speeds of 40 to 50 knots per hour, helped the state achieve new heights in wind power generation over the last three months. Sources in energy department said wind power generation in Karnataka increased by 24% compared to the last three years. "While Karnataka generated 3,821 million units of wind power in 2022, it generated a record 4,769 million units of wind power until July this year. Though wind power generation is spread over five months, peak-power generation occurs within the first three months of the season, particularly in July," said an energy department official. Gaurav Gupta, additional chief secretary of energy department, told TOI early onset of south-west monsoon was indeed a significant advantage. "Monsoons always provide us with energy security in the renewable sector. While copious rain brings good inflow into our hydel reservoirs, strong winds associated with monsoon also help in generating considerable wind power. Unlike previous years, 2025 was advantageous for us for two reasons — early onset of monsoon and stronger winds compared to previous years. Both factors helped us generate more hydro as well as wind energy compared to the past," Gupta said. Karnataka Power Corporation Limited (KPCL), which manages power generation through various resources, was able to generate 1,653.65 million units of hydroelectric power in July alone due to heavy rain in May and June, which left all major reservoirs filled to the brim. Tired of too many ads? go ad free now Similarly, data accessed from State Load Dispatch Centre (SLDC) between May 2025 and July 2025 revealed a considerable surge in wind power generation, reaching a record 4,769 million units. Energy minister KJ George said Karnataka is a leader in renewable energy sector. "Nearly 60% to 70% of the entire state's energy requirement is met through renewable energy sources, and wind power during monsoon is a major contributor," he added. N Puviyarasan, head of India Meteorological Department, Bengaluru, said: "Unlike in the past, which largely swung between El Nino and La Nina conditions, resumption of neutral conditions over Pacific Ocean in 2025 brought variability in weather patterns. Alongside bounteous rain, we're witnessing strong winds with sustained speeds of 40 to 50 knots per hour at some locations and an average speed of 30 to 35 knots. " Engineers at Karnataka Renewable Energy Development Limited (KREDL) told TOI wind turbines normally need a wind speed of 6 to 7 knots per hour (12-14 km/hr). "But their optimal performance would come around with a sustained wind speed of 30 to 35 knots per hour. Barring a few locations, most of the wind farm areas in central and northern districts of Karnataka had an average speed of 30 to 35 knots, and this ensured optimum generation of wind power," a senior engineer from KREDL said.