
Inside TikTok town: vast data centre sparks Chinese spying fears
Kouvola needs all the jobs it can get. Young Finns who have not already left a small city so drab it could be stuck in the Soviet Union struggle to find work.
So when an international company called Hyperco announced it would exploit the freezing north's temperatures and ready access to cold water to build a data centre in the area, there was general acceptance of it being a pretty good thing.
After all, the few million euros paid for a parcel of empty land seemed a good deal for everybody.
• UK economy boosted as USS invests in Blackstone data centre plan
Once the data centre was up and running by the end of next year there would be taxes, too, to collect from
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Independent
7 hours ago
- The Independent
How AI growth is driving a revolution in powering data centres
AVK-SEG is a Business Reporter client Delivering resilient, sustainable energy and power infrastructure to support the rising energy demands of AI-driven data centres. The rise of AI over the past few years has been a huge boon for businesses everywhere. The flipside, however, is that it places equally significant demands on data centre power management – and data centres are struggling to keep up. According to the CBRE North America Data Center Trends Report H12024: 'Increased demand for high-power computing creates a significant price disparity between new data centres and legacy facilities. Many existing data centres lack the infrastructure to handle these demanding workloads, further limiting their appeal.' With no sign of a let-up in the phenomenal pace of AI infrastructure investment, it is vital for data centre operators to stay competitive by implementing intelligent and sustainable upgrades, such as enhancing power density capabilities, adopting renewable energy solutions and investing in resilient infrastructure for AI and HPC workloads. Future-proofing prime power, efficient backup load-stepping and renewable fuels are key components of this. According to a recent report from IDC, AI data centre capacity is projected to have a compound annual growth rate (CAGR) of 40.5 per cent by 2027. AI data centre energy consumption is forecast to grow at 44.7 per cent, reaching 146.2 Terawatt hours (TWh) by 2027. AI workloads will consume a growing proportion of total data centre electricity use. Given this growth in AI-driven demand, it's not surprising that, in a recent report, CBRE observed a growing price disparity between data centres built or upgraded with the high-density power demands of AI in mind and existing facilities that still lack adequate infrastructure for AI. Densities are rising fast and will continue, reaching as high as 100 kW per rack, possibly higher. As an industry, we need to advise our customers on configuring their power infrastructure to position themselves for AI resilience and sustainability. This is not just a matter of environmental responsibility. It is also a strategic necessity for the long-term viability of the ever-evolving AI industry. Putting prime power in place AI is putting such significant demand on the grid that it's struggling to manage, especially in established connectivity hubs such as Dublin, Frankfurt, Amsterdam, Paris and London. Waiting times for power capacity are sometimes several years long, creating major headaches for operators. This is where smart microgrids step in, bridging the gap between data centre operators and grid requirements. AVK, the largest and fastest-growing supplier of power solutions for data centres and leading organisations in the UK and Europe, is helping build resilience, sustainability, and scalability across critical infrastructure to support our digital future, powered by artificial intelligence – and its recent collaboration with major data centre operators illustrates how an effective and tailored microgrid can transform a facility's operational outlook. This allowed the client to meet its immediate energy demands while aligning with sustainability goals, making the data centre a net energy contributor to the local community with the potential to support national grid infrastructure. Backup: the load-stepping challenge Both existing and new facilities must also pay close attention to their backup solutions, which may not be able to keep up with even small increases in power density. As customers decentralise their uninterruptible power supply (UPS) to increase power densities towards the 50/100 kW level, they need smooth load-stepping, which means the ability to gradually increase the electrical load on a backup power system such as a generator. Smooth load-stepping allows backup power systems to handle growing demand without overloading or causing instability. Understanding your power needs Sustainable, high-density infrastructure can be assembled piece by piece as long as organisations apply principles such as energy efficiency, scalability and resilience at every step and build for the future. Microgrid design, load management and renewable fuels are critical elements to consider as power levels increase to support AI. The market is also evolving rapidly: new solutions are being developed that increasingly rely on AI to optimise their effectiveness, making AI part of the solution as well as the challenge. Perhaps the most essential principle for tackling these issues is understanding power requirements intimately, from prime power and load-stepping to backup fuel choice. The journey towards AI readiness is about more than keeping up with technological advancements, it's about building innovative solutions that are scalable, sustainable and capable of supporting the industry in the long term.


Reuters
10 hours ago
- Reuters
Brookfield Asset Management plans $10 bln data centre for AI in Sweden
STOCKHOLM, June 4 (Reuters) - Brookfield Asset Management ( opens new tab (BAM) plans to invest up to 95 billion Swedish crowns ($9.91 billion) to build a data centre for artificial intelligence in Sweden, the Canadian company said in a statement on Wednesday. BAM said the site in the Swedish city of Strangnas west of Stockholm will create more than 1,000 permanent jobs and around 2,000 jobs during a 10-15 year construction process. "This investment represents one of Brookfield's largest AI investments in Europe and extends the partnership with the Swedish government, its public authorities, academia and businesses in the region," the company said in the statement. Swedish Prime Minister Ulf Kristersson welcomed the announcement, he said on social media X. U.S. tech group Nvidia (NVDA.O), opens new tab last month announced that it will provide its latest generation AI data centre platform to a group of Swedish companies, including telecoms gear maker Ericsson ( opens new tab and drug developer AstraZeneca (AZN.L), opens new tab. ($1 = 9.5845 Swedish crowns)


Reuters
10 hours ago
- Reuters
Nokia, Nvidia, defence firms back EU-funded drone infrastructure oversight project
June 4 (Reuters) - A consortium of more than 42 organizations, led by Nokia ( opens new tab, will work on an unmanned drone project aimed at protecting and bolstering the resilience of Europe's most critical infrastructures, the Finnish network equipment maker said on Wednesday. The member organizations, which include start-ups and universities, will build new capabilities such as laser or radar sensors on top of hardware platforms like drones built by defence companies. Russia's invasion of Ukraine has highlighted the European Union's inability to protect its vital systems, a vulnerability starkly underscored by drone warfare's increasing capacity to inflict devastation deep within adverse territory. "Safeguarding of our critical infrastructure has not always been a first priority," project leader Thomas Eder at Nokia said in an interview with Reuters, adding that EU-funding for a similar venture did not come through only a few years earlier. The project is funded in part by participating countries, companies and the EU under its Chips Joint Undertaking, opens new tab programme, which also allows non-EU countries such as Israel to participate. Among companies involved in the venture were Nvidia (NVDA.O), opens new tab and European defence firms Safran ( opens new tab, Leonardo ( opens new tab and Saab ( opens new tab. Nokia is looking to do more around defence as its new CEO has identified the sector as one of the company's priority areas, alongside data centres and AI, a Nokia spokesperson said. The aerial, ground and underwater robot project, initially scheduled to run for three years, is expected to generate 90 million euros ($102.7 million) in revenue by 2035, according to a statement seen by Reuters. Nokia was not able to confirm the total funding numbers for the project. While the initiative is targeted for civil security, when asked if it could be later spun-off into a dual-use project for defence purposes, Eder said, "I think it is highly possible." "But for the time being, this is a critical infrastructure project for power lines, for power plants, for railways, for ports, for any type of power grid applications," he said. ($1 = 0.8767 euros)