
Libyan Oil Pipeline Restored After Emergency Maintenance
The leak was first reported on 23 May 2025. In response, AGOCO's technical teams immediately isolated the pipeline and contained the spill, in accordance with established safety and environmental protocols. This initial action was crucial in protecting nearby infrastructure, workers, and the environment.
Following containment, the site was secured using shut-off valves. On 28 May, technicians began extracting residual crude oil from the affected section and redirected it to the Tahara field to prepare for repair work. By 30 May, the company had launched full-scale maintenance, starting with a cold-cutting operation on the 18-inch pipeline.
The damaged section was replaced with a new segment using high-quality American-made insulated connectors. Notably, AGOCO opted for a composite bonding technique over traditional welding to avoid technical risks typically associated with high-pressure pipeline repairs.
Engineer Mohamed Ben Shatwan, Chairman of AGOCO's Management Committee, praised the swift and professional response of the technical teams. He highlighted their strict adherence to safety standards and engineering excellence, noting that their dedication reflects the company's operational discipline and its commitment to quality.
Ben Shatwan added that the successful operation demonstrates the strength of Libya's national oil sector in managing challenges independently. He also acknowledged the effective coordination among national firms to ensure stable oil flow and maintain production targets.
AGOCO's prompt intervention has prevented potential disruption to crude exports and reinforced confidence in Libya's oil infrastructure resilience amid broader industry efforts to expand and stabilise output.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


Libya Review
12-08-2025
- Libya Review
Libyan Technical Teams Complete Diesel Plant Restart
Technical teams from the Arabian Gulf Oil Company (AGOCO) have successfully restarted the diesel processing plant at the Al-Bayda oil field, following directives from company chairman Mohamed Ben Shatwan and board member for operations, maintenance, refineries, and supply, Awad Akweidir. The restart was achieved after the implementation of a precise work plan, mobilizing all necessary technical and logistical resources. The effort involved coordination between pipeline departments, maintenance coordinators from the Sarir, Al-Bayda, and Nafoura fields, as well as the Al-Bayda field management team, operations coordinators, and refinery management. AGOCO confirmed that the operation was carried out to the highest technical standards, delivering outstanding results that highlight the expertise of the company's national workforce. The company expressed its appreciation for the dedicated efforts and spirit of teamwork that ensured the project was completed efficiently and within the scheduled timeframe. Libya has been in chaos since a NATO-backed uprising toppled longtime leader Muammar Gaddafi in 2011. The county has for years been split between rival administrations. Libya's economy, heavily reliant on oil, has suffered due to the ongoing conflict. The instability has led to fluctuations in oil production and prices, impacting the global oil market and Libya's economy. The conflict has led to a significant humanitarian crisis in Libya, with thousands of people killed, and many more displaced. Migrants and refugees using Libya as a transit point to Europe have also faced dire conditions. The planned elections for December 2021 were delayed due to disagreements over election laws and the eligibility of certain candidates. This delay has raised concerns about the feasibility of a peaceful political transition. Despite the ceasefire, security remains a significant concern with sporadic fighting and the presence of mercenaries and foreign fighters. The unification of the military and the removal of foreign forces are crucial challenges. Tags: AGOCOEnergylibyaoil


Libya Review
02-08-2025
- Libya Review
ExxonMobil Set to Return to Libya with Offshore Gas Exploration Deal
ExxonMobil is reportedly preparing to re-enter Libya's energy sector through a preliminary agreement that would grant the company rights to explore offshore natural gas resources. The move would mark ExxonMobil's first major activity in Libya in nearly a decade, signaling a broader return of international energy companies to the oil-rich North African nation. According to Energy Intelligence, the American energy giant is also participating in Libya's first oil and gas licensing round in years, organized by the country's National Oil Corporation (NOC). Over 40 international firms have reportedly expressed interest in the bidding process, as Libya opens its vast and largely untapped reserves to foreign investment once again. Libya, home to more than 90 billion barrels of undeveloped oil and gas reserves, is seeking to boost its current oil production—estimated between 1.3 and 1.4 million barrels per day—to 2 million barrels daily within the next three years. That goal depends heavily on attracting new investment, particularly in offshore and underexplored regions. ExxonMobil's renewed interest underscores the country's long-term energy potential, especially in the face of global energy demand shifts and growing competition for new gas supply routes. If finalized, the deal would enhance Libya's efforts to stabilize its energy sector and restore its role as a key global supplier. The timing also aligns with ExxonMobil's strong performance in international markets. Wall Street analysts have projected a one-year target price for ExxonMobil shares at $123, up from a current price of $112.20, with some forecasts reaching as high as $140—reflecting optimism about the company's global expansion strategy. Tags: EnergyExxonMobilgaslibya


Libya Review
31-07-2025
- Libya Review
Libya Attracts New Energy Investment from Hong Kong's UEG
United Energy Group (UEG), a Hong Kong-based investment and asset management company, is advancing its energy portfolio by securing oil exploration rights in Libya and the Republic of the Congo. According to Mohamed Hamdy, UEG's Project Development Manager, the company is actively expanding its presence in North Africa. It is currently studying opportunities in Algeria, alongside its confirmed interests in Libya and Congo. In a strategic move towards sustainability, UEG has signed a memorandum of understanding (MoU) with LONGi Green Energy, one of the world's largest solar panel manufacturers. The partnership will support the company's transition to renewable energy in its operations. Hamdy explained that UEG plans to install solar systems in its oil fields located in northern Egypt's Western Desert. These systems will replace the diesel generators currently used to power remote sites, helping the company reduce operational costs and carbon emissions. As part of the agreement, UEG and LONGi will implement a 20-megawatt peak hybrid solar power system across six oil fields. The system is expected to generate approximately 24,800 megawatt-hours of clean energy per year, significantly reducing the fields' dependency on fossil fuels. Hamdy revealed that UEG currently owns 13 oil fields in the Western Desert region, including eight recently acquired from the American company Apex. The group's total investments in Egypt's oil sector range from $1.5 to $2 billion. These developments are part of UEG's broader plan to inject $7 billion in new investments into the Egyptian market. The company previously acquired Kuwait Energy in 2018 and Apex in December 2024. With exploration underway in Libya and a green energy agenda in full swing, UEG appears poised to solidify its presence in North Africa's energy sector. Tags: gasHong KonglibyaoilUEG