
PM Modi To Inaugurate Patna's New International Airport Terminal On May 29
Patna: The long-awaited new terminal of Jayaprakash Narayan International Airport in Patna is finally ready and set to be inaugurated by Prime Minister Narendra Modi on May 29. Built at Rs 1,400 crore, the state-of-the-art facility spans 65,155 square meters, several times the size of the existing terminal.
The new terminal boasts 54 check-in counters, five aerobridges, eight X-ray baggage scanners, five baggage conveyor belts, multi-level car parking, a VIP lounge, cafeterias, and commercial spaces. Designed to accommodate 4,500 passengers daily, the terminal will increase annual capacity from 25 lakh to 1 crore. Daily flight operations are expected to rise from 34 to 75.
The architectural design draws inspiration from Madhubani art and Nalanda University, with beautiful depictions of Chhath Puja, Lord Buddha, Mahavira, and Patna Sahib Gurudwara, giving the terminal a uniquely Bihari soul. A striking 100-foot-tall tricolour now graces the airport premises, while a dedicated area pays tribute to Jayaprakash Narayan.
On the same day, PM Modi will also lay the foundation stone for the upcoming Bihta Airport, located 35 km from Patna. Designed for larger aircraft, the new airport will span 68,000 square meters over 116 acres, with the capacity to handle 3,000 passengers per hour and 50 lakh annually.
Prime Minister will also launch and lay the foundation and inauguration for over 16 mega projects worth Rs 50,000 crore.
The Prime Minister will lay the foundation of Nabinagar Thermal Power Plant, Aurangabad – Rs 29,947.91 crore. It will generate 1,500 MW, becoming NTPC's second-largest power plant in Bihar.
He will also inaugurate the Patna-Gaya-Dobhi four-lane highway (Rs 5519 crore), NH-27 Gopalganj grade improvement (249 crore), Sasaram–Anugrah Narayan Road automatic rail signalling (Rs 43 crore), third railway line between Son Nagar–Muhammadganj (65 km) worth Rs 1,338 crore, hostel and staff quarters at JNV Jehanabad (Rs 8 crore).
Hashtags

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Print
31 minutes ago
- The Print
Railway Minister shares 8 features of Katra Srinagar Rail Link
Additionally, the rail link features India's second-longest transportation tunnel, T-80 (11.22 km), known as the Pir Panjal Railway Tunnel, situated between Banihal and Qazigund. In a post on X, Vaishnaw described the project as a 'remarkable feat of engineering,' emphasising that it includes 'India's longest transportation tunnel, T-50,' which is 12.77 km long and located between Khari and Sumber. Katra (Jammu), June 6 (PTI) With the flagging of the Katra-Srinagar Vande Bharat Express by Prime Minister Narendra Modi, Railway Minister Ashwini Vaishnaw on Friday shared eight notable features of the Udhampur-Srinagar-Baramulla Rail Link (USBRL) project. 'India's 3rd longest railway tunnel T-44 stretches over 11.13 Km; between Sawalkote-Sangaldan,' he added. Vaishnaw highlighted that the project involves the construction of 36 main tunnels with a total length of 119.6 km, along with eight escape tunnels totalling 66.4 km. He also outlined the details of the Chenab Bridge, which is the world's highest railway arch bridge, which measures 1.3 km in length and stands at a height of 359 metres —35 metres higher than the Eiffel Tower. The construction involved over 600 km of steel welding, exceeding the length of the railway track from Jammu to Delhi. Vaishnaw took the opportunity to showcase the iconic Anji Bridge, which is India's first cable-stayed railway bridge. 725.5 metres in length, the bridge is balanced on the axis of a single central pylon and the height of a single pylon is 193 m from the top of the foundation. Remarkably, all 96 stay cables were installed within just 11 months, with a total length of 653 km— more than the distance from Jammu to Delhi. 'Advanced construction technique was specifically adapted to the complex geological and seismic conditions of the Himalayan region – Himalayan Tunneling Method,' his post read. Another significant feature, the minister shared, was the 'all weather train movement' – the installation of 'ice cutter' in Vande Bharat trains to clear snow from tracks, ensuring reliable all-weather train movement. PTI JP MPL MPL This report is auto-generated from PTI news service. ThePrint holds no responsibility for its content.


Time of India
31 minutes ago
- Time of India
PM Modi flags off Katra-Srinagar Vande Bharat Express
Katra: Prime Minister Narendra Modi on Friday flagged off a Vande Bharat train service between Katra and Srinagar in Jammu and Kashmir, the first train connection between the Kashmir valley and the Jammu region. Modi inaugurated the train in the presence of Railway Minister Ashwini Vaishnaw, Jammu and Kashmir LG Manoj Sinha, and Chief Minister Omar Abdullah, among others. According to Northern Railway, the train has two travelling classes -- Chair Car (CC) and Executive Class (EC) -- with tickets costing Rs 715 and Rs 1,320, respectively.


The Print
31 minutes ago
- The Print
Now Katra to Srinagar in just 3 hrs. PM Modi flags off Vande Bharat linking Kashmir to rest of India
The new service will not only connect Jammu to Kashmir via a rail link but also Kashmir to the rest of India for the first time. While road and air connectivity already existed, the rail link is significant due to the region's challenging geography and tough terrain. The rail route, which is part of the Udhampur-Srinagar-Baramulla Rail Link (USBRL), will be open for commercial services starting Saturday. Katra, Jammu: With chants of 'Jai Shera Wali Da' and 'Bharat Mata Ki Jai', Prime Minister Narendra Modi flagged off the first Vande Bharat Express connecting Jammu to Kashmir Friday. The new railway line is expected to significantly reduce travel time between the Jammu region and Srinagar. The fare for the Katra-Srinagar route is Rs 715 for chair car and Rs 1,350 for executive class. 'This is not just a new railway service but also symbolic of how far the region's railway network has progressed over the last 11 years,' said Railway spokesperson Dilip Kumar. 'We are witnessing history in the making. This railway line is a marvel, and advanced technology has been used to ensure all-weather connectivity,' he added. The inauguration comes weeks after the 22 April Pahalgam terror attack in which 26 people were killed. Since then, tourism in Kashmir has seen a massive decline. The rail link is being seen as a step towards restoring normalcy and inviting tourists to revisit the Valley. 'Earlier, there would be no space to walk at Dal Lake because of the massive tourist footfall. Now, we hardly see a few. Hope this railway line will restore normalcy,' said a shawl seller in Srinagar. Also read: What Indian Railways needs right now—safety more than speed Cutting travel time The Vande Bharat Express will take only 3 hours to travel from Katra to Srinagar. By road, the journey used to take around 6-7 hours. For the first time, two Vande Bharat trains will run consecutively—one from Katra and the other from Srinagar—both flagged off by the prime minister. The prime minister also inaugurated two major engineering landmarks. One is the Chenab Rail Bridge, the world's highest railway arch bridge, standing 359 metres above the riverbed, 35 metres taller than the Eiffel Tower. It spans 1,315 metres and is part of the USBRL. It is engineered to withstand seismic and wind conditions. Modi waved the national flag as he inaugurated the Chenab bridge. #WATCH | J&K: Prime Minister Narendra Modi waves the Tiranga as he inaugurates Chenab bridge – the world's highest railway arch bridge.#KashmirOnTrack (Video: DD) — ANI (@ANI) June 6, 2025 The other is the Anji Khad Bridge, India's first cable-stayed railway bridge. Located about 80 km from Jammu, it spans the Anji River and has been constructed by Hindustan Construction Company. The USBRL will cross a stretch of 271 km that includes 36 tunnels and 943 bridges. It has been built at a cost of Rs 43,780 crore. Before the final launch, several trial runs were conducted. In the last run, army and security personnel boarded the train as it passed over the Chenab Bridge to assess wind resistance and safety protocols. According to officials, the bridge is designed to withstand wind speeds of up to 260 km/h. (Edited by Sugita Katyal) Also read: From Pamban bridge to Ram Setu, India's revolution in regional integration is underway