logo
PAN GLOBAL INTERSECTS 1.08 G/T GOLD OVER 46 METERS FROM NEAR SURFACE IN FIRST DRILLHOLE AT CÁRMENES PROJECT, SPAIN

PAN GLOBAL INTERSECTS 1.08 G/T GOLD OVER 46 METERS FROM NEAR SURFACE IN FIRST DRILLHOLE AT CÁRMENES PROJECT, SPAIN

Cision Canada19-05-2025

Confirms potential for significant new gold discovery at 100%-owned Cármenes Project, northern Spain
Potential for additional discoveries in the large Cármenes Project area
VANCOUVER, BC, May 19, 2025 /CNW/ - Pan Global Resources Inc. ("Pan Global" or the "Company") (TSXV: PGZ) (OTCQB: PGZFF) (FRA: 2EU) is pleased to announce significant near surface gold assay results in the first drillhole completed in the maiden drill campaign at the Company's 100%-owned Cármenes Project ("Cármenes"), northern Spain.
The current six-hole drill program is targeting expansion of the breccia-hosted mineralization associated with the historical Providencia copper-cobalt-nickel underground mine workings. The potential for significant gold was highlighted in recent soil, trench and channel sampling results. The Providencia target area had no previous drilling and no past reports of gold mineralization.
Drill Highlights:
"The first drill results at the Providencia target represent an exceptional start to Pan Global's maiden drill program at Cármenes, confirming discovery of previously unknown near-surface gold mineralization over a wide interval. The results expand the breccia-hosted mineralization south of the historical high-grade copper, cobalt and nickel mine workings at Providencia and is wide open. The new gold zone occurs as a potential halo to the copper-rich mineralization found in the mine workings," said Tim Moody, Pan Global President and CEO.
"Multiple targets have been identified from soil geochemistry and mapping in the immediate area around Providencia, including the large untested Profunda target located 1km to the south. This further highlights the potential for additional discoveries in the Cármenes Project."
Key points:
Current six-hole dill program is Pan Global's maiden drill campaign at the Cármenes Project, and the first-ever drillholes at the Providencia target.
First completed drillhole (PVD02) intersected a high-grade interval of 6.27 g/t gold over 4m within a broader interval averaging 1.08 g/t gold over 46m from 24m down-hole.
The gold intersection in PVD02 is associated with strong multi-stage hydrothermal breccia within strongly dolomitized/altered limestones, with local trace quantities of sulphides, and favourable very low contents of metals such as arsenic or antimony.
Assay results are anticipated within three weeks for completed drillholes (PVD03 and PVD04), with breccia intersected over more than 120m from near-surface in PVD04. Drillhole PVD01 was abandoned before reaching the target after the hole collapsed.
Historical underground mine workings at Providencia extracted copper, cobalt and nickel ore from within a "pipe-like" hydrothermal breccia to a depth of 110 meters. The mineralization remained open when mining ceased in the early-1930s.
There is no record of gold extraction at Providencia and the new gold zone appears to have been previously unrecognized.
The on-going drilling includes three step-out holes up to 120m east of the Providencia mine workings, testing beneath recently reported highly anomalous trench and channel sample results (3.11 g/t Au over 37m, and 1.74 g/t Au over 20m). [See media release from February 11, 2025 ]
Large surface target area extending more than 250m x 150m, characterized by coincident strong dolomite-alteration, breccia and strongly anomalous Cu, Au, Ni, Co and Pb geochemistry in soils, trench and channel sample assays.
Channel sampling inside the historical mine workings at Providencia is underway to better understand the continuity of the mineralization.
Multiple targets identified in the Cármenes Project area highlight the potential for additional discoveries from the ongoing exploration program.
Interpretation of a recently completed helicopter electromagnetic, magnetic and radiometric survey over the Cármenes Project is in progress to fast-track identification and prioritization of additional potential drill targets.
Pan Global is also pleased to report that drilling has resumed at the Company's flagship Escacena Project in southern Spain following record rainfall in March and April, with the focus on the high-priority Bravo target, expansion of the La Romana copper-tin discovery, and testing of new targets.
Table 1 – Providencia Drill Results Summary
1 All intercepts are reported as downhole drill widths. There is insufficient drilling to constrain the geometry to determine true width.
Table 2 –Drillhole Collar Information
2 Coordinate system: UTM30N ERTS89
About the Cármenes Project
The Cármenes Project is located approx. 55km north of León in northern Spain and comprises five Investigation Permits over 5,653 hectares. The Project area is highly prospective for multiple bodies or "clusters" of carbonate-hosted "pipe-like" breccia style copper, nickel, cobalt, and gold mineralization. The area includes the former Profunda and Providencia mines that last operated in the 1930s, producing concentrates of copper and cobalt with nickel. Numerous other smaller historical mine workings in the area highlight potential for additional breccia pipes. These types of ore deposits can have significant vertical dimensions exceeding 1km.
About Pan Global Resources
Pan Global Resources Inc. is actively exploring for copper-rich mineral deposits along with gold and other metals. Copper has compelling supply-demand fundamentals and outlook for strong long-term prices as a critical metal for global electrification and energy transition. Gold is also attracting record prices.
The Company's flagship Escacena Project is located in the prolific Iberian Pyrite Belt in southern Spain, where a favourable permitting track record, excellent infrastructure, mining and professional expertise, and support for copper as a Strategic Raw Material by the European Commission collectively define a tier-one low-risk jurisdiction for mining investment. The Company's second project, at Cármenes, in northern Spain, is also an area with a long mining history and excellent infrastructure. The Pan Global team comprises proven talent in exploration, discovery, development, and mine operations - all of which are committed to operating safely and with utmost respect for the environment and our partnered communities. The Company is a member, and operates under the principles, of the United Nations Global Compact.
Qualified Persons
Álvaro Merino, Vice President Exploration for Pan Global Resources and a qualified person as defined by National Instrument 43-101, has approved the scientific and technical information for this media release. Mr. Merino is not independent of the Company.
QA/QC
Core size was HQ (63mm) and all samples were ½ core. Nominal sample size was 1m core length and ranged from 0.5 to 2m. Sample intervals were defined using geological contacts with the start and end of each sample physically marked on the core. Diamond blade core cutting and sampling was supervised at all times by Company staff. Duplicate samples of ¼ core were taken approximately every 30 samples and Certified Reference materials inserted every 25 samples in each batch.
Samples were delivered to ALS laboratory in Seville, Spain and assayed at the ALS laboratory in Ireland. All samples were crushed and split (method CRU-31, SPL22Y), and pulverized using (method PUL-31). Gold, platinum and palladium analysis was by 50gm fire assay with ICP finish (method Au-ICP-24) and multi element analysis was undertaken using a 4-acid digest with ICP AES finish (method ME-ICP-61). Over grade base metal results were assayed using a 4-acid digest ICP AES (method OG-62).
Forward-looking statements
Statements which are not purely historical are forward-looking statements, including any statements regarding beliefs, plans, expectations, or intentions regarding the future. It is important to note that actual outcomes and the Company's actual results could differ materially from those in such forward-looking statements. The Company believes that the expectations reflected in the forward-looking information included in this media release are reasonable, but no assurance can be given that these expectations will prove to be correct and such forward-looking information should not be unduly relied upon. Risks and uncertainties include, but are not limited to, economic, competitive, governmental, environmental, and technological factors that may affect the Company's operations, markets, products, and prices. Readers should refer to the risk disclosures outlined in the Company's Management Discussion and Analysis of its audited financial statements filed with the British Columbia Securities Commission.
The forward-looking information contained in this media release is based on information available to the Company as of the date of this media release. Except as required under applicable securities legislation, the Company does not intend, and does not assume any obligation, to update this forward-looking information.
NEITHER TSX VENTURE EXCHANGE NOR ITS REGULATION SERVICES PROVIDER (AS THAT TERM IS DEFINED IN THE POLICIES OF THE TSX VENTURE EXCHANGE) ACCEPTS RESPONSIBILITY FOR THE ADEQUACY OR ACCURACY OF THIS RELEASE.
SOURCE Pan Global Resources Inc.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

Ten-bagger Founders Metals grows stake in flagship project
Ten-bagger Founders Metals grows stake in flagship project

The Market Online

time24 minutes ago

  • The Market Online

Ten-bagger Founders Metals grows stake in flagship project

Ten-bagger Founders Metals (TSXV:FDR) successfully completed all requirements under stage 2 of its option on the 20,000-hectare Antino gold project in Suriname, increasing its stake from 51 to 70 per cent Antino has produced over 500,000 ounces of gold from surface and alluvial mining to date Founders Metals stock has added 113.73 per cent year-over-year, more than doubling gold's approximately 45 per cent effort, and remains up by more than 1,000 per cent since 2022 Ten-bagger Founders Metals (TSXV:FDR) successfully completed all requirements under stage 2 of its option on the 20,000-hectare Antino gold project in Suriname, increasing its stake from 51 to 70 per cent. According to Friday's news release, stage 2 saw Founders make cash payments of US$1.5 million, incur US$10 million in exploration expenses, issue 95,000 shares and produce a conceptual study similar to a preliminary economic assessment, all within two years of completing stage 1 of the agreement. Founders may now either enter a joint venture with Nana Resources, one of the optionors, or proceed to stage 3, which will increase the company's stake to 75 per cent in exchange for incurring another US$10 million in exploration expenses and completing a bankable feasibility study. The company's diligent exploration and development at Antino since optioning the project in 2022, including a steady stream of high-grade gold across numerous mineralized zones, has resulted in an over 1,000 per cent return to date, granting it ten-bagger status with ample room to run on the path to resource delineation. Founders is progressing through a fully funded 60,000-metre drilling program at Antino in 2025. Leadership insights 'We are thrilled to formally exercise our right to acquire 70 per cent of Antino, further strengthening our position as the project's majority owner,' Colin Padget, Founders Metals' president and chief executive officer, said in a statement. 'Completing stage 2 is a major de-risking milestone and reflects our confidence in Antino's exceptional potential. Additionally, we are excited to provide a detailed update in the coming days on all major exploration targets. We remain committed to maximizing shareholder value as we continue advancing the Antino gold project's world-class potential through our 60,000 metre 2025 drill program.' Founders Metals is a Canadian-based junior miner focused on its Antino gold project in Suriname, which has produced over 500,000 ounces of gold from surface and alluvial mining to date. Founders Metals stock (TSXV:FDR) opened with a loss of 1.36 per cent trading at C$4.36. The stock has added 113.73 per cent year-over-year, more than doubling gold's approximately 45 per cent effort. Join the discussion: Find out what everybody's saying about this ten-bagger junior gold stock on the Founders Metals Inc. Bullboard and check out the rest of Stockhouse's stock forums and message boards. The material provided in this article is for information only and should not be treated as investment advice. For full disclaimer information, please click here.

Digital Museums Canada's 2025 Call for Proposals opens June 15 Français
Digital Museums Canada's 2025 Call for Proposals opens June 15 Français

Cision Canada

time27 minutes ago

  • Cision Canada

Digital Museums Canada's 2025 Call for Proposals opens June 15 Français

GATINEAU, QC, June 13, 2025 /CNW/ - The Digital Museums Canada 2025 Call for Proposals will open in two days! As of June 15, eligible museums and heritage, cultural and Indigenous organizations are invited to apply for up to $250,000 in funding from Digital Museums Canada. Over $2 million in funding is available to create online projects, develop digital capacity, and reach new audiences through digital storytelling. Digital Museums Canada (DMC) is an investment program managed by the Canadian Museum of History. Organizations can choose from one of two investment streams: Digital Projects With an investment of up to $250,000, develop an online project from the ground up with the support of a web development agency. Community Stories With an investment of $25,000, use DMC's user-friendly website-building platform to create an engaging story. Starting in September, DMC will also offer a robust application assistance program to help applicants strengthen their funding applications. This includes Information Sessions, Office Hours, and Mentorship Chats. Digital Museums Canada is the largest investment program of its kind in the country, having provided over $22 million in funding to more than 275 projects to date. It offers Canadian museums and heritage organizations funding, expert guidance, and user-friendly tools to tell stories on a variety of online platforms, such as virtual exhibitions and tours, online games, web apps, and educational resources. DMC is committed to online accessibility as well as to advancing equity, diversity and inclusion in the heritage sector. The 2025 Call for Proposals closes on December 1. Managed by the Canadian Museum of History, the Digital Museums Canada (DMC) investment program helps build digital capacity in museums and heritage, cultural and Indigenous organizations across Canada, offering unique access to diverse stories and experiences. For more information, visit Follow us on Facebook or LinkedIn. If you would like to have your name removed from our distribution list, or if this information should be directed to someone else, please send us an email.

A TRANSFORMATIVE YEAR FOR VIA RAIL AMID ONGOING OPERATIONAL CHALLENGES Français
A TRANSFORMATIVE YEAR FOR VIA RAIL AMID ONGOING OPERATIONAL CHALLENGES Français

Cision Canada

time39 minutes ago

  • Cision Canada

A TRANSFORMATIVE YEAR FOR VIA RAIL AMID ONGOING OPERATIONAL CHALLENGES Français

HIGHLIGHTS From January 1 st to Total revenues increased by $49.5 million (11.5%) compared to 2023 due to higher demand. 4.4 million passengers rode VIA Rail trains in 2024, an increase of 272,000 (6.6%) compared to 2023. The Corporation unveiled its new strategic plan, VIAction 2030, which aims to position VIA Rail as a best-in-class operator in North America and a leader in integrated mobility, placing passengers at the heart of the travel experience. VIA Rail received funding to replace its pan-Canadian fleet and offer new trains to Canadians from Coast to Coast to Coast. MONTRÉAL, June 13, 2025 /CNW/ - VIA Rail Canada (VIA Rail) marked a year of significant progress in 2024, continuing the strong growth trajectory seen since the pandemic. The Corporation reported revenues of $480.2 million, while ridership increased to 4.4 million passengers. Additionally, VIA Rail publicly introduced its bold new strategic plan, VIAction 2030, setting the stage for the future of passenger rail in Canada. "VIA Rail navigated 2024 with ambition and confidence, looking toward the future, while also addressing daily challenges that exposed certain vulnerabilities," said Françoise Bertrand, VIA Rail's former Chairperson of the Board of Directors. "Our promising future is expressed in a new strategic vision focused on transforming our organization to better serve Canadians for generations to come." Navigating Operational Challenges While 2024 was a year of growth and transformation for VIA Rail, it also presented operational hurdles, particularly in the Québec City–Windsor corridor. In the fourth quarter, new infrastructure regulations significantly impacted on-time performance, posing challenges in maintaining the high level of service passengers expect. VIA Rail is actively addressing these issues to enhance reliability and ensure a smoother travel experience. "This past year laid the foundation for VIA Rail's future, but it also brought unprecedented challenges," said Mario Péloquin, President and Chief Executive Officer. "In October, new regulations imposed by the host railway created significant disruptions in our corridor services. Despite these setbacks, Canadians continue to choose train travel in record numbers, and our financial performance remained strong, with a greater-than-expected reduction in our operating deficit." VIAction 2030: A Vision for the Future of Passenger Rail 2024 saw the introduction of VIA Rail`s 5-year strategic plan, VIAction 2030. Grounded in five strategic pillars, VIAction 2030 aims to improve VIA Rail's operations, enhance passenger service, and establish the company as a key player in integrated mobility across Canada. The plan sets out a transformative vision to provide Canadians with a seamless, sustainable, and customer-centric travel experience. Full Operation of the New Fleet in the Québec City – Windsor Corridor In 2024, VIA Rail marked a major milestone with the arrival of its new fleet in Southwestern Ontario. This modernization effort paves the way for the entire Québec City–Windsor corridor to be served by state-of-the-art, accessible, and environmentally friendly trains by summer 2025. The launch of these new, modern trains offers businesses a unique opportunity to integrate sustainable rail travel into their corporate travel policies. Adopting this approach is simple and can significantly lower an organization's environmental impact. With improved ergonomics, enhanced stability, brighter interiors, and better connectivity, these trains are designed to support productivity on the move, making them the smart choice for companies seeking both efficiency and sustainability. A New App to Simplify Your Journey In 2024, building on the success of its new reservation system introduced in 2023, VIA Rail launched a new mobile customer app. This app provides passengers with a convenient and efficient way to manage their reservations and access their VIA Preference accounts. Historic Investment: A New Pan-Canadian Fleet A landmark moment for VIA Rail came in 2024 when the Government of Canada announced funding for the replacement of the Corporation's pan-Canadian fleet as part of the federal budget. This historic investment, the largest in VIA Rail's history, will allow the Corporation to select a supplier to design and build modern, comfortable, accessible, and sustainable trains, ensuring a more connected Canada. "The history of Canada is closely intertwined with the history of train travel, and VIA Rail's long-distance routes hold a strong place in Canada," said Jonathan Goldbloom, Chair of the Board of Directors. "The replacement of VIA Rail's pan-Canadian fleet is essential to allow VIA Rail to maintain its services and will also ensure that the next generations of Canadians have access to modern comfortable trains in every corner of the country." VIA Rail's annual report is available at: About VIA Rail VIA Rail Canada's mandate is to operate the national passenger rail service on behalf of the Government of Canada, and to provide a safe, accessible, efficient, reliable, sustainable, and environmentally responsible service that meets the needs of Canadian passengers. VIA Rail operates intercity trains connecting over 400 communities across Canada and ensuring rail transportation services to regional and remote communities. The Corporation safely transported over four million passengers in 2024 and has been awarded nine Safety Awards and three Environment Awards by the Railway Association of Canada. For more, visit our website:

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store