logo
GDOT announces closure advisories for I-16, I-95 Improvement Projects

GDOT announces closure advisories for I-16, I-95 Improvement Projects

Yahoo15-03-2025

SAVANNAH, Ga. (WSAV) — The Georgia Department of Transportation (GDOT) announced on Friday several closure advisories ahead of the 16@95 Improvement Projects.
The project will widen Interstate 16 (I-16) and reconstruct the I-16/I-95 Interchange.
Daytime ClosuresTuesday, March 18, through Saturday, March 22, 8 a.m. to 3 p.m.Intermittent, right- and left-lane closures at the following locations:
I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange ( MP 157)
Tuesday, March 18, through Saturday, March 22, 9 a.m. to 4 p.m.Intermittent, right- and left-lane closures at the following locations
I-16 eastbound from the I-16/I-95 Interchange (MP 157) to I-16/I-516 Interchange (MP 164)
Tuesday, March 18, through Saturday, March 22, 8 a.m. to 5 p.m.Intermittent, right- and left-lane closures at the following locations
I-516 westbound at the I-16 Interchange from MP 5 to MP 6
I-516 eastbound at the I-16 Interchange from MP 6 to MP 5
Nighttime ClosuresTuesday, March 18, through Saturday, March 22, 7 p.m. to 6 a.m.Intermittent, right- and left-lane closures at the following locations
I-16 westbound from the I-16/I-516 Interchange (MP 164) to the I-16/I-95 Interchange (MP 157)
I-16 eastbound from the I-16/I-95 Interchange (MP 157) to the I-16/I-516 Interchange (MP 164)
Tuesday, March 18, through Saturday, March 22, 7 p.m. to 6 a.m.Intermittent, right- and left-lane closures at the following locations
I-516 westbound at the I-16 Interchange from MP 5 to MP 6
I-516 eastbound at the I-16 Interchange from MP 6 to MP 5
Tuesday, March 18, through Saturday, March 22, 9 p.m. to 5 a.m.Double-lane closures at the following locations
I-95 northbound @ I-16 overpass (MP 98 to MP 100)
I-95 southbound @ I-16 overpass (MP 101 to MP 98)
LONG-TERM CLOSUREJune 26, 2022, through May 31, 2025Tremont Road under I-16 (Map)
Motorists traveling on Tremont Road north of I-16 should take Telfair Road northbound, turn right on West Gwinnett Street, turn right onto I-516 eastbound, then exit at Tremont Road (Exit 4)
Motorists traveling on Tremont Road south of I-16 should take I-516 westbound to West Gwinnett Street (Exit 6), turn left on West Gwinnett Street, then left on Telfair Road to access Tremont Road north of I-16
St. Patrick's Day holiday work restrictions will be in place from Friday, March 14, 2025, at noon to Tuesday, March 18, 2025, at 6 a.m. No road closures or work that restricts or interferes with traffic will be conducted during this time frame.
Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

Orange background

Try Our AI Features

Explore what Daily8 AI can do for you:

Comments

No comments yet...

Related Articles

71 West Location Is Officially Open for Business!
71 West Location Is Officially Open for Business!

Associated Press

timean hour ago

  • Associated Press

71 West Location Is Officially Open for Business!

AUSTIN, Texas, June 12, 2025 (SEND2PRESS NEWSWIRE) — Autocraft Bodywerks is proud to announce the opening of its fourth state-of-the-art collision repair center, located on State Highway 71 in Spicewood, Texas. This new 23,000-square-foot facility has achieved I-CAR Gold Class status and is proudly sponsored by BMW of South Austin and Audi of South Austin, as it works toward becoming the only BMW and Audi-certified collision repair center in the area. The company's expanded footprint, led by Manager Robbie Mulderrig will better serve customers in West Austin, Westlake, Bee Cave, Lakeway, Spicewood, and the surrounding communities. Conveniently located at 22110 State Hwy 71W, Spicewood, TX 78669, the new Autocraft Bodywerks location brings over 40 years of industry experience to the region. Known for its exceptional customer service, Autocraft Bodywerks is committed to the highest quality repairs using only OEM (Original Equipment Manufacturer) parts, purchased directly from vehicle manufacturers. 'Autocraft has proudly served the Austin community since 1984,' said Principal Chris Raeder. 'This new, state-of-the-art facility gives our guests another convenient option for trusted collision repair. Our goal is to bring advanced repair solutions to more Austin-area communities for when they need them most.' Choosing the right collision center after an accident is crucial. For more information about Autocraft Bodywerks and the services we offer, contact us at any of our locations: Autocraft Bodywerks, now with locations in South Austin, North Austin, San Marcos, and Bee Cave | 71 West serving the Lakeway, Spicewood, Bee Caves and surrounding communities, is a locally owned and operated Austin, Texas based collision repair company that has been restoring Automotive Dreams Since 1984. Autocraft is approved for Porsche, Tesla, Rivian, Mercedes-Benz, Lexus, Lucid, Hyundai, Kia, Nissan, and Ford/Lincoln collision repairs, with the training and equipment to handle all aspects of collision repairs for these high-tech vehicles. In addition, Autocraft is Austin's premier I-CAR Gold Class body shop specializing in the repair and restoration of luxury vehicles. Autocraft Bodywerks combines the latest technology and the most comprehensive training available to repair all makes and models of damaged vehicles and restore them back to the original factory specifications for performance and structural integrity. The team of collision repair specialists at Autocraft Bodywerks has years, and in many cases, decades of experience in automotive collision repair. Autocraft Bodywerks is Aluminum Certified. Autocraft Bodywerks uses only OEM (Original Equipment Manufacturer) replacement parts. For more information about Autocraft Bodywerks services please call Autocraft Bodywerks South at 512-441-7444, Autocraft Bodywerks North at 737-238-3752, Autocraft Bodywerks San Marcos at 512-214-8696, Autocraft Bodywerks Bee Cave | 71 West at 512-266-2512, or visit MEDIA CONTACT INFORMATION: Chris Raeder Autocraft Bodywerks 512-441-7444 [email protected] NEWS SOURCE: Autocraft Bodywerks Keywords: Automotive Repair, Autocraft Bodywerks, I-Car Gold Class Certified, best austin body shop, OEM only, tesla approved Body Shop, porsche collision, rivian collision, AUSTIN, Texas This press release was issued on behalf of the news source (Autocraft Bodywerks) who is solely responsibile for its accuracy, by Send2Press® Newswire. Information is believed accurate but not guaranteed. Story ID: S2P126918 APNF0325A To view the original version, visit: © 2025 Send2Press® Newswire, a press release distribution service, Calif., USA. RIGHTS GRANTED FOR REPRODUCTION IN WHOLE OR IN PART BY ANY LEGITIMATE MEDIA OUTLET - SUCH AS NEWSPAPER, BROADCAST OR TRADE PERIODICAL. MAY NOT BE USED ON ANY NON-MEDIA WEBSITE PROMOTING PR OR MARKETING SERVICES OR CONTENT DEVELOPMENT. Disclaimer: This press release content was not created by nor issued by the Associated Press (AP). Content below is unrelated to this news story.

I-35 expansion: TxDOT project takes shape in South Austin
I-35 expansion: TxDOT project takes shape in South Austin

Yahoo

time9 hours ago

  • Yahoo

I-35 expansion: TxDOT project takes shape in South Austin

The Brief The I-35 Capital Expressway South Project is starting to take shape in South Austin The project includes a long, elevated section of roadway to speed traffic through that part of town The entire project is targeted to be completed in late 2028 or early 2029 AUSTIN, Texas - A multi-million-dollar construction project is taking shape in South Austin. The I-35 Capital Expressway South Project includes a long, elevated section of roadway to speed traffic through that part of town. What they're saying The massive concrete pillars that are rising above I-35 are part of the Capital Expressway South Project. The T-shaped monoliths will hold up an elevated roadway between Ben White and Slaughter Lane. "There's about 95 to 100 of those when we're done," said Willie Semora, TxDOT's Director of Construction for the Austin District. The caps, according to Semora, are almost 100' wide. "They were pretty massive, really, in the grand scheme of anything I've ever built in my career," said Semora. The $548 million project is being done in four phases. The new fast track in the middle of I-35 is the main feature. It will allow traffic to bypass Stassney Lane and William Cannon. "So, everything is non-toll. So we're calling them managed lanes. The intention is HOV or to really push the transit message and let folks that are, you know, multiple people in a vehicle, buses, those kinds of things use those lanes to ultimately reduce capacity or reduce congestion and increase capacity on the rest of 35. But nothing's tolled when we're finished," said Semora. Multiple heavy lifting cranes are needed to assemble the elevated roadway. There are almost 79 tons of prestressed girders. That's more than 157 million pounds, and, according to TxDOT, the equivalent of eight Eiffel Towers and 700 fully-loaded railroad cars. "It takes two cranes to pick up one set of cap forms. Right. So, everything is bigger. Everything is heavier. And to do it safely, everything requires more resources," said Semora. Advanced planning was done to avoid supply line issues. "We use what we call material on hand. And so they may buy the steel we need to put in those columns two years before we build it. But we're really trying to plan ahead to keep that. From impacting us long term," said Semora. The main contractor for the project, Flour Corporation, has even built their own concrete plant. "We didn't want to tax the resources of the rest of Austin, right? There's a lot of construction going on everywhere. People are building buildings, doing utility work. So, with the amount of concrete that we're putting out there, our contractor brought their own plant and made it themselves," said Semora. Big changes are also being made on the ground. The most notable involves addressing a steep slope around Onion Creek. "We flattened that dip out and that's going to help with getting trucks up and down the hill, start time. A lot of traffic is a truck sitting in lane, and he can't get going up that hill. So, we fixed some of that," said Semora. Part of the fix will require a big detour this weekend at Stassney Lane. The bridge will be closed, requiring a long U-turn. The entire project is targeted to be completed in late 2028 or early 2029. The Source Information from interviews conducted by FOX 7 Austin's Rudy Koski

Virginia road closures for DC military parade
Virginia road closures for DC military parade

Yahoo

time18 hours ago

  • Yahoo

Virginia road closures for DC military parade

ARLINGTON, Va. () — The military parade to mark the 250th anniversary of the U.S. Army is set for Saturday, June 14, and while the parade route, itself, is in D.C., road closures are not limited to the District. The Pentagon's North Parking Lot is serving as a staging area, with military vehicles set to leave there and head into the city via Memorial Bridge. Becasuse of the event, road closures in Arlington begin Wednesday, June 11. How to take Metro to get to the Army parade, festival The right lane of Route 27/Washington Boulevard will close in both directions between US-50 and Pentagon North Parking at 8 p.m. on Wednesday. All lanes of Route 27/Washington Boulevard will be closed from 6 p.m. on Friday, June 13 through Saturday, June 14 at 10 p.m. George Washington Memorial Parkway will be closed US-50 and I-395 from Friday, June 13 at 6 p.m. through Sunday, June 15 at 6 a.m. Washington Metropolitan Area Transit Authority (WMATA) said the military parade would affect a number of its Metrobus routes on the Virginia side of the Potomac River as well as in D.C. . Copyright 2025 Nexstar Media, Inc. All rights reserved. This material may not be published, broadcast, rewritten, or redistributed.

DOWNLOAD THE APP

Get Started Now: Download the App

Ready to dive into the world of global news and events? Download our app today from your preferred app store and start exploring.
app-storeplay-store