
Flights disrupted by air traffic control technical glitch
The company said it is limiting the number of aircraft which can fly in the ' London control area', which covers most of England and Wales.
The technical issue relates to Nats' control centre in Swanwick, Hampshire.
British Airways said the problem is 'affecting the vast majority of our flights'.
Gatwick airport said it is affecting all outbound flights across the UK.
Birmingham airport said 'departing flights from many UK airports have been suspended'.
Several flights scheduled to arrive at UK airports are being forced to conduct holding patterns or divert elsewhere.
More than 700,000 passengers suffered disruption when flights were grounded at UK airports on August 28 2023 when Nats suffered a technical glitch while processing a flight plan.

Try Our AI Features
Explore what Daily8 AI can do for you:
Comments
No comments yet...
Related Articles


The Independent
13 minutes ago
- The Independent
Hairy Bikers star to host new Channel 4 travel show
Si King, one half of The Hairy Bikers, is set to front a new four-part travel series for Channel 4 's More4, titled Top Of The Stops. The series will feature King, a train enthusiast, exploring the UK railway network, disembarking at unique stations to discover their stories, engineering, and architecture. He will be accompanied on the show by transport historian Siddy Holloway and architect Damion Burrows. This marks King's first solo return to television following the death of his co-star and best friend, Dave Myers, in February 2024. King had previously ruled out continuing The Hairy Bikers TV shows without Myers, stating it would not be respectful to their shared career.


The Sun
14 minutes ago
- The Sun
Long-forgotten UK train line to reopen after 60 years under £500million plan – and will slash journey times in half
A RAILWAY line abandoned over 60 years ago could be set to reopen, following a £500 million revamp. The train line, which closed way back in 1966, plans to run hourly services to Southampton and London, slashing journey times to the two major cities. 1 The £500 million revamp will include the reopening of part of the Totton to Hythe branch line and the restoration of Marchwood station. In the longer term Grand Union Trains plans to open a park and ride facility between Hythe and Hardley. Journey times slashed Once the line is back up and running, it will take just 16 minutes to get from Marchwood to Southampton, far quicker than the 36 minutes it currently takes to get there by bus. Trains from Marchwood to Waterloo will take one hour and 40 minutes, compared with the two hours and 20 minutes it takes currently. Initial plans to reopen the line were scrapped by the government back in 2024, after it claimed the scheme would fail to deliver value for money. However, the proposal has now been replaced by a privately funded alternative. Grand Union Trains said: "The service would build on a recent comprehensive study that looked at re-opening the 'Waterside Line' to transform the connectivity of this important region. "If approved, Grand Union Trains would look to re-open other parts of the line in a phased approach to its development." 80 jobs to be created The reopening of the railway line is set to create 80 new jobs, providing a boost to the local economy. If approved, the railway line could be up and running by September 2026. Incredible plans to tunnel underneath UK city centre for massive train network are unveiled Cllr David Harrison who is in favour of the scheme, told the A&T: "I have heard conflicting opinions on whether this new venture will get the green light. "I really hope it does. There is very strong support for the return of a railway passenger service up and down the Waterside. 'It would also greatly improve services from Totton. "With constant problems on local roads causing traffic congestion and now, the ferry out of operation, it would be a great opportunity to provide people with an alternative". Grand Union Trains added: "As well as around 80 new and permanent jobs, the introduction of this service will help in addressing the major road congestion that exists in the Waterside area, and we are keen to explore a more holistic transport offering with our bus and ferry colleagues to provide an integrated solution for local journeys. 'By offering a direct service to and from London we are also looking to attract visitors to the New Forest area via this route as opposed to just via Brockenhurst and believe this will significantly help in addressing the economic imbalance that currently exists.'


BBC News
14 minutes ago
- BBC News
Sunderland's Keel Crossing one-day opening for Rugby World Cup
An unfinished footbridge will temporarily open for the first day of the Women's Rugby World Cup before shutting again for final cosmetic Keel Crossing will welcome pedestrians on 22 August, including fans travelling to the Stadium of Light for the tournament's opening match between England and the more than 40,000 people expected in the city for the game, council leader Michael Mordey said: "It will be incredible seeing a sea of England and USA shirts and scarves walking across the bridge."Keel Crossing will close at the end of the day so the final phase of works can be completed before it is officially opened for permanent use. The £31m structure links Keel Square in the city centre with Sheepfolds and the Stadium of is one of several high-profile developments currently under construction as part of the Riverside Sunderland scheme, including Culture House and the new eye said: "I think this crossing has come to represent the sense of renewed positivity and optimism that is growing in Sunderland right now." Follow BBC Sunderland on X, Facebook, Nextdoor and Instagram.